MMg,
UNITED $TATES
i
/
'
NUCLEAR REGULA TORY COMMISSION
.-
E\\
%
,
REGION 11
U h; * ~ f
g
230 PE ACHTREE STRE ET. N.W SUITF 1217
%.
{.)
Art.ANTA, GEORGIA 30303
l
-
%.~....f
1
Mar 71 W?
In Reply Refer To:
R11:FJ
50-269/77-26
50-270/77-26
50-287/77-26
Duke Power Company
Attn:
Mr. William O. Parker, Jr.
Vice President, Steam Production
'
422 South Church Street
P. O. Box 2178
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducte by Mr. Frank Jape of this office
on October 17-20, 1977, of activities authorized by NRC Operating License
Nos. DPR-38, DPR-47 and DPR-55 for the Oconee 1, 2 and 3 facilities, and
,
to the discussion of our findings held with Mr. R. M. Koehler at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the attached inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously
identified inspection findings. These are discussed in the enclosed
inspection report.
During the inspection it was found that certain activities under your
license appear to be in noncompliance with NRC requirements.
This item
and references to pertinent requirements are listed in the enclosed
Corrective actions to prevent recurrences were
completed prior to the conclusion of this inspection; therefore, a reply
to this item of noncompliance is not requested.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necess-ary that you make a written
j
application within 20 days to this of fice to withhold such information
from public disclosure.
Any such applicatica must include a full statement
7911280hf
._.
.
-
-
(
Duka Power Comp :y
-2-
!
()
-
.
of the reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary information
I
identified in the application is contained in a separate part of the
i
document.
If we do not hear from you in this regard within the speelfied
period, the report will be placed in the Public Document Room.
i
l
Should you have any questions concerning this letter, we will be glad to
!
discuss them with you.
!
Sincerely,
!
1
!
C
fQ
!
F. J. Long, Chief
Reactor Operations and Nuclear
'
,
Support Branch
i
!
Enclosures:
,
!
i
R11 Inspection Rpt. Nos.
50-269/77-26, 50-270/77-26
--
,
and 50-287/77-26
i
(
1
cc:
J. E. Smith, Station Manager
Oconee Nuclear Station