Text
__
'
.
t
'o
UNITED STATES
8
g
NUCLEAR REGULATORY COMMISSION
.
o
.e
REGION il
o
101 MARIETTA sT., N.W., SUITE 3100
o
ATLANTA, GEORGIA 3o3o3
MAR 171980
In Reply Refer To:
RII:JJB
50-518/80-04
50-519/80-04
50-520/80-04
.
50-521/80-04
Tennessee Valley Authority
/
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
.
Gentlemen:
This refers to the inspection conducted by J. J. Blake of this office on
February 19-22, 1980 of activities authorized by NRC Construction Permit Nos.
'
CPPR-150, CPPR-151, CPPR-152 and CPPR-153 for the Hartsville Nuclear Plant
facility, and to the discussion of our findings held with R. T. Hathcote at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
'
enclosed inspect. ion report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed report..
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed here-
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to submit to this office, within 20
days of your receipt of this notice, a written statement or explanation in reply
including:
(1) corrective steps which have been taken by you and the results
achieved; (2) corrective steps which will be taken to avoid further noncompli-
ance; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include a full statement of the reasons on tha basis of which
it is claimed tht the information is proprietary, and should be prepared so
that proprietary 'uformation identified in the application is contained in a
separate part of th document.
If we do not hear from you in this regard within
th- 5
- ifi "i period, the report will be placed in the Public Document Room.
i
8006180077
._
-
.
L*
MAR 171980
Tennessee Valley Authority
-2-
.
Should you have any questions concerning this letter,
.t will be glad to discuss
them with you.
Sincerely,
. C.
r
at, Acting Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
'
2.
Inspection Report Nos. 50-518/80-04,
-
50-519/80-04, 50-520/80-04 and
50-521/80-04
cc w/ encl:
.
R. T. Hathcote, Project Manager
P. O. Box 2000
Hartsville, TN 37074
J. F. Cox
400 Commerce Street
W10C131 C-X
Knoxville, TN 37902
J. E. Wills, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
.
E. G. Beasley
Tennessee Valley Authority
309 Grant's Building
Knoxville, TN 37902
I
.