Text
t
-
.
18-
--
- M
UNITED STATES
o,,
s
V'N 8
.NUCLcAR REGULATORY COMMISSION
o
Od-
I-
REGION 11
101 MARIETTA ST
N.W., SUITE 3100
4Y
o
ATLANTA. GEORGIA 30303
g *-****
JAN 10 E3
-
.
'Ih Reply' Refer To:
RII: PAT:
50-302/79-50
Florida Power Corporation
ATTN: . John A. Hancock, Director
Nuclear Operations-
P. O. Box 14042, Mail Stop C-4
St. Petersburg, FL 33733
Gentlemen:
This refers to the. inspection conducted by P. A. Taylor of this office on
December 3-7, 1979 of activities authorized-by NRC License No. DPR-72 for the
Crystal River facility, and to the discussion of our findings held with D. C.
Poole at the conclusion of the inspect. ion.
-
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations.by the inspectors.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is dis-
cussed in the enclosed report.
Three new unresolved items resulted from this inspection and are discussed in
the enclosed report. These items will be examined during subsequent inspections.
During the inspection, it was-found that certain activities under your license
appear to be in noncompliance with NRC requirements.- This item and references
to pertinent requirements are listed in the Notice of Violation enclosed here-
~
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
-
.
Regulations. Section 2.201 requires you to submit to this office, within 20
i
^
days of your receipt of this notice, a written statement or explanation in reply
including:
(1). corrective steps which have been taken by you and the results
achieved; (2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
-In.accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of'this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains any information that you (or.your contractor) believe to be
l
proprietary,' it is necessary that you make'a written application within 20 days
1
to this office to withhold such information from public disclosure. Any such-
- application must include a full ~ statement of the reasons on the basis of which
j
it.is claimed that the information is proprietary, and should be prepared so
~
'
,
8003190
.
. k4b ..
....
~
,
.
'.
i s;
.
LJAN 101980 ~
. Florida: Power Corporation.
-2-
3
,
,
that proprietary-_ information identified in the application is contained in a
l separate part of the document. ~ If we do not hear from you in this -regard within
the specified period,.the report will be placed in the-Public Document Room.
Should you:have any questions concerning this letter, we will be glad to discuss
them.with you.-
_
Sincerely,
hl /Y
.-
.
J. T..Sutherland, Chief
Fuel Facility and Materials
Safety Branch'
Enclosures:
-1..
Appendix ~A, Notice'of Violation
c
2.
Inspection Report No. 50-302/79-50
'ce'w/ encl:
-D. C. Poole
Nuclear Plant Manager
P. O. Box 1240.