Forwards IE Insp Rept 50-302/79-50 on 791203-07 & Notice of Violation
ML19312D066
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/10/1980
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML19312D060 List:
References
NUDOCS 8003190743
Download: ML19312D066 (2)


See also: IR 05000302/1979050

Text

t

-

.

18-

--

- M

UNITED STATES

o,,

s

V'N 8

.NUCLcAR REGULATORY COMMISSION

o

Od-

I-

REGION 11

101 MARIETTA ST

N.W., SUITE 3100

4Y

o

ATLANTA. GEORGIA 30303

g *-****

JAN 10 E3

-

.

'Ih Reply' Refer To:

RII: PAT:

50-302/79-50

Florida Power Corporation

ATTN: . John A. Hancock, Director

Nuclear Operations-

P. O. Box 14042, Mail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

This refers to the. inspection conducted by P. A. Taylor of this office on

December 3-7, 1979 of activities authorized-by NRC License No. DPR-72 for the

Crystal River facility, and to the discussion of our findings held with D. C.

Poole at the conclusion of the inspect. ion.

-

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations.by the inspectors.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is dis-

cussed in the enclosed report.

Three new unresolved items resulted from this inspection and are discussed in

the enclosed report. These items will be examined during subsequent inspections.

During the inspection, it was-found that certain activities under your license

appear to be in noncompliance with NRC requirements.- This item and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

~

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

-

.

Regulations. Section 2.201 requires you to submit to this office, within 20

i

^

days of your receipt of this notice, a written statement or explanation in reply

including:

(1). corrective steps which have been taken by you and the results

achieved; (2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

-In.accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of'this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains any information that you (or.your contractor) believe to be

l

proprietary,' it is necessary that you make'a written application within 20 days

1

to this office to withhold such information from public disclosure. Any such-

application must include a full ~ statement of the reasons on the basis of which

j

it.is claimed that the information is proprietary, and should be prepared so

~

'

,

8003190

.

. k4b ..

....

~

,

.

'.

i s;

.

LJAN 101980 ~

. Florida: Power Corporation.

-2-

3

,

,

that proprietary-_ information identified in the application is contained in a

l separate part of the document. ~ If we do not hear from you in this -regard within

the specified period,.the report will be placed in the-Public Document Room.

Should you:have any questions concerning this letter, we will be glad to discuss

them.with you.-

_

Sincerely,

hl /Y

.-

.

J. T..Sutherland, Chief

Fuel Facility and Materials

Safety Branch'

Enclosures:

-1..

Appendix ~A, Notice'of Violation

c

2.

Inspection Report No. 50-302/79-50

'ce'w/ encl:

-D. C. Poole

Nuclear Plant Manager

P. O. Box 1240.

' Crystal River, FL 132629

.