| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 02/13/1980 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML19309C230 | List: |
| References | |
| NUDOCS 8004080341 | |
| Download: ML19309C240 (2) | |
See also: IR 05000317/1979024
Text
_
_
___
___ _ , , _ ___._______
______
e
s
,
pg
UNITED STATES
o
NUCLEAR REGULATORY COMMisslON
,
n
R EGION I
$
$
$31 PARK AVENUE
f
KING OF PRUSSI A. PENNSYLVANIA 19406
Sy.
/
+..,*
Docket Nos. 50-317
.
50-318
Baltimore Gas & Electric Company
ATTN: Mr. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
Gentimen:
Subject:
Inspection Report No. 50-317/79-24; 50-318/79-23
This refers to the inspection conducted by Dr. M. Shanbaky of this
office on December 10-11, 1979 of activities authorized by NRC License
Nos. OPR-53 and DPR-69 at Calvert Cliffs Nuclear Power Plant, Units 1
and 2 and to the discussions of our findings held by Dr. Shanbaky with
Messrs. Russell, Denton and other members of your staff at the conclusion
of the inspection. This also refers to the meeting held at our office
on December 21, 1979 and attended by you and Messrs. J. Bullock, L.
Russell and R. Denton of your staff and by Messrs. J. Allan, G. Smith,
H. Kister, R. Architzel and M. Shanbaky of this office.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix
A.
This item of noncompliance has been categorized into the levels as
described in our correspondence to you dated December 31, 1974. This
notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice," Part 2, Title 10. Code of Federal Regulations.
,
Section 2.201 requires you to submit to this office, within twenty (20)
days of your receipt of this notice, a written statement or explanation
in reply including:
(1) corrective steps which have been taken by you
and the results achieved; (2) corrective steps which will be taken to
avoid further items of noncompliance; and (3) the date when full compliance
will be achieved.
8004080 %
_
_
--.
--_-_
.
,
,
.
Baltimore Gas & Electric Company
g
This item, shown in the Notice of Violation enclosed with this letter,
is a recurrent or uncorrected item.
In your response please give this
matter your particular attention.
With respect to the meeting held on December 21, 1979, it is our understanding
that the actions described in Paragraph 7.c of the attached Inspection
Report will be accomplished in accordance with the scheduled dates in
Paragraph 7.c.
If this understanding is not correct, please advise us
as to your position in your response to this letter.
In accordance with Section 2'790 of the NRC's " Rules of Practice," Part
2, Title 10. Code of Federal Regulations, a copy of this letter and the
enclosures will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to
be proprietary, it is necessary that you make a written application
within 20 days to this office to withhold such information from public
disclosure. Any such application must be accom)anied by an affidavit
executed by the owner of the information, whic1 identifies the document
or part sought to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by
the Commission as listed in subparagraph (b) (4) of Section 2.790. The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
u # , W i.
bM'
[*'ByceH.Grier
~
D1 rector
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Numbers 50-317/79-24; 50-318/79-23
cc w/encls:
R. M. Douglass, Manager, Quality Assurance