Forwards IE Insp Repts 50-317/79-24 & 50-318/79-23 on 791210-11 & Notice of Violation
ML19309C240
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/13/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19309C230 List:
References
NUDOCS 8004080341
Download: ML19309C240 (2)


See also: IR 05000317/1979024

Text

_

_

___

___ _ , , _ ___._______

______

e

s

,

pg

UNITED STATES

o

NUCLEAR REGULATORY COMMisslON

,

n

R EGION I

$

$

$31 PARK AVENUE

f

KING OF PRUSSI A. PENNSYLVANIA 19406

Sy.

/

+..,*

Docket Nos. 50-317

.

50-318

Baltimore Gas & Electric Company

ATTN: Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

Gentimen:

Subject:

Inspection Report No. 50-317/79-24; 50-318/79-23

This refers to the inspection conducted by Dr. M. Shanbaky of this

office on December 10-11, 1979 of activities authorized by NRC License

Nos. OPR-53 and DPR-69 at Calvert Cliffs Nuclear Power Plant, Units 1

and 2 and to the discussions of our findings held by Dr. Shanbaky with

Messrs. Russell, Denton and other members of your staff at the conclusion

of the inspection. This also refers to the meeting held at our office

on December 21, 1979 and attended by you and Messrs. J. Bullock, L.

Russell and R. Denton of your staff and by Messrs. J. Allan, G. Smith,

H. Kister, R. Architzel and M. Shanbaky of this office.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix

A.

This item of noncompliance has been categorized into the levels as

described in our correspondence to you dated December 31, 1974. This

notice is sent to you pursuant to the provisions of Section 2.201 of the

NRC's " Rules of Practice," Part 2, Title 10. Code of Federal Regulations.

,

Section 2.201 requires you to submit to this office, within twenty (20)

days of your receipt of this notice, a written statement or explanation

in reply including:

(1) corrective steps which have been taken by you

and the results achieved; (2) corrective steps which will be taken to

avoid further items of noncompliance; and (3) the date when full compliance

will be achieved.

8004080 %

_

_

--.

--_-_

.

,

,

.

Baltimore Gas & Electric Company

g

This item, shown in the Notice of Violation enclosed with this letter,

is a recurrent or uncorrected item.

In your response please give this

matter your particular attention.

With respect to the meeting held on December 21, 1979, it is our understanding

that the actions described in Paragraph 7.c of the attached Inspection

Report will be accomplished in accordance with the scheduled dates in

Paragraph 7.c.

If this understanding is not correct, please advise us

as to your position in your response to this letter.

In accordance with Section 2'790 of the NRC's " Rules of Practice," Part

2, Title 10. Code of Federal Regulations, a copy of this letter and the

enclosures will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to

be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such information from public

disclosure. Any such application must be accom)anied by an affidavit

executed by the owner of the information, whic1 identifies the document

or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by

the Commission as listed in subparagraph (b) (4) of Section 2.790. The

information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

u # , W i.

bM'

[*'ByceH.Grier

~

D1 rector

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Numbers 50-317/79-24; 50-318/79-23

cc w/encls:

R. M. Douglass, Manager, Quality Assurance

L. B. Russell, Chief Engi teer

W. Gibson, General Supervisor, Operations QA

R. C. L. Olson, Senior Engineer

K. H. Sebra, Principal Engineer