ML19308D592
| ML19308D592 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/17/1971 |
| From: | Long F US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Henderson J US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19308D584 | List: |
| References | |
| NUDOCS 8003040993 | |
| Download: ML19308D592 (1) | |
Text
.
<5 G,
~
\\
n
/
i n _,)
\\
=
ATOMIC ENERGY COMMISSION
~
'f UNITED STATES l *l 3
l DIVISION OF COMPT.IANCE REGloN 11 - SUITE 818 4
230 PEACHTREE STREET. N OR T H W EST I
Y Taurucwe 5264537 AT L.A NT A. GEORGI A 30303 i
March 17, 1971 j
Q J. B. Henderson, Chief, Reactor Construction Branch Division of Compliance, Headquarters i
FLORIDA POWER CORPORATION (CRYSTAL RIVER 3), LICENSE NO. CPPR-51, DOCKET NO.
50-302 Attached Comoliance Report No. 50-302/71-1 by Kelley, Bower and Warnick covering a routine inspection on February 9-12, 1971, is for information.
There were no safety problems identified: however, two items of noncon-formance with the quality assurance criteria vere identified. A Construc-tion Deficiency Notice (CDN) is being issued for the najor item, loss of quality control during erection of the steel containment liner.
The second item concerning leak chase halogen testing was resolved adequately and not A) considered of sufficient magnitude to varrant a CDN. Pepairs to the liner l
have commenced. We vill continue to follow this problem and will ask the U
licensee to submit a technical evaluation recort to DRL.
If bN3/30/11 E82 Long C0:II:FJL Senior Peactor Inspector
Enclosure:
C0 Rpt. No. 50- 302/71-1 (Kelley) cc w/ encl:
E. G. Case, DRS (3)
P. A. Morris, DEL R. F. Boyd, DRL (2)
R. C. DeYoung, DRL (2)
D. J. Skovholt, DEL (3)
P. W. Howe, DFL (2)
- A. Giambusso, CO
- L. Kornblith, Jr., CO
-R. H. Engelken, CO R. W. Kirkman, C0:I "N
B. H. Grier, C0:III 80030M 83
/
s
(
)
J. W. Flora, C0:IV R. W. Smith, C0:V REG Files
, e e nn
_,. O. o