Forwards IE Insp Rept 50-302/77-26 on 771219-22 & Notice of Violation
ML19308D498
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/19/1978
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19308D491 List:
References
NUDOCS 8002280809
Download: ML19308D498 (2)


See also: IR 05000302/1977026

Text

.,

.

G [M" "'4,'o,

-

IE F.li.c COPI

4

UNITED STATES

k ]) I

[

NUCLEAR REGULATORY COMMISSION

$

'" h

.g

REGloN H

{ .-

^* /

$

U

230 PEACHTREE STREET. N.W. SUITE 1217

o,

[

ATLANTA, GEORGIA 30303

~

%, ".... /

JAN 191973

.

In Reply Refer To:

RII:ALC

50-302/77-15 '

Florida Power Corporation

Attn: Mr. W. T. Stewart, Director

,

Power Production

P. O. Box 14042, Mail Stop C-4

St. Petersburg, Florida

33733

Gentlemen:

This refers to the inspection conducted by Mr. A. L. Cunningham of this

office on December 19-22, 197/, of activities authorized by NRC Operating

License No. DPR-72 for the Crystal River Unit 3 facility, and to the dis-

cussion of our findings held with Mr. G. P. Beatty at the conclusion of

the inspection.

\\

Areas examined during the inspection and our findings are discussed

in the enclosed inspection report. Within these areas, the inspection

,

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

We have exavined actions you have taken with regard to previously identi-

fied enforcement matters.

These are discussed in the enclosed inspection

report.

Duringtheinspection,itwasfoundthatcertaInactivitiesunderyour

license appear to be in noncompliance with NRC requirements.

These

items and references to pertinent requirements are listed in the Notice

of Violation enclosed herewith as Appendix A.

This notice is sent to

you pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part *2, Title 10, Code of Federal Regulations, a copy of this letter

'

and the enclosed inapection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

O

8002 280h f

.

. _

.

. . . -

. _ _ _

_ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _

_

'

.

,

'

.~

,

. . . , ,

)'

s_ ,/

Florida Power Corporation

-2-

.

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is con-

l

tained in a separate part of the document.

If we do not hear from you

in this regard within the specified period, the report will be placed

in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

) Y.<

,

J. T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

Enclosures:

g

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-302/77_15~ ~

,

i

cc w encl:

Mr. Mr. G. P. Beatty, Jr.

Nuclear Plant Superintendent

P. O. Box 1228

Crystal River, Florida

32629

l

l

l

~

.

.

-

- - .

-

--

.--