G [M" "'4,'o,
-
IE F.li.c COPI
4
UNITED STATES
k ]) I
[
NUCLEAR REGULATORY COMMISSION
$
'" h
.g
REGloN H
{ .-
^* /
$
U
230 PEACHTREE STREET. N.W. SUITE 1217
o,
[
ATLANTA, GEORGIA 30303
~
%, ".... /
JAN 191973
.
In Reply Refer To:
RII:ALC
50-302/77-15 '
Florida Power Corporation
Attn: Mr. W. T. Stewart, Director
,
Power Production
P. O. Box 14042, Mail Stop C-4
St. Petersburg, Florida
33733
Gentlemen:
This refers to the inspection conducted by Mr. A. L. Cunningham of this
office on December 19-22, 197/, of activities authorized by NRC Operating
License No. DPR-72 for the Crystal River Unit 3 facility, and to the dis-
cussion of our findings held with Mr. G. P. Beatty at the conclusion of
the inspection.
\\
Areas examined during the inspection and our findings are discussed
in the enclosed inspection report. Within these areas, the inspection
,
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
We have exavined actions you have taken with regard to previously identi-
fied enforcement matters.
These are discussed in the enclosed inspection
report.
Duringtheinspection,itwasfoundthatcertaInactivitiesunderyour
license appear to be in noncompliance with NRC requirements.
These
items and references to pertinent requirements are listed in the Notice
of Violation enclosed herewith as Appendix A.
This notice is sent to
you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part *2, Title 10, Code of Federal Regulations, a copy of this letter
'
and the enclosed inapection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
O
8002 280h f
.
. _
.
. . . -
. _ _ _
_ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _
_
'
.
,
'
.~
,
. . . , ,
)'
s_ ,/
Florida Power Corporation
-2-
.
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is con-
l
tained in a separate part of the document.
If we do not hear from you
in this regard within the specified period, the report will be placed
in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
) Y.<
,
J. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
g
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-302/77_15~ ~
,
i
cc w encl:
Mr. Mr. G. P. Beatty, Jr.
Nuclear Plant Superintendent
P. O. Box 1228
Crystal River, Florida
32629