ENVIRONMENTAL LICENSEE EVENT REPORT 77-160E/04X-0 1.
Facility:
Crystal River Unit #3 2.
Report Date:
18 January 1978 3.
Occurrence Date:
21-22 December 1977 (determined at plant 17 January 1978) 1 j
4.
Identification of Occurrence:
Biomass of fish and shellfish impinged on the intake screens of Units 1, 2, and 3 exceeded the 50 kg/24 hour reporting level of Section 3.1.3 of Environ-mental Technical Specifications.
5.
Conditions Prior to Occurrence:
Unit #1 - All water circulation pumps operational.
Unit #2 - All water circulation pumps non-operational (unit down).
I
.]
Unit #3 - All water circulation pumps operational.
6.
Description of Occurrence:
During the period 0900 21 December 1977 to 0900 22 December 1977 95.24 kg of fish and shellfish were impinged on the intake screens of Crystal River Units i
1, 2, and 3.
Of the 95.24 kg impinged, Unit 3 accounted for 74.04 kg (78% of total).
One commercially unimportant species, the batfish, accounted for 57.99 kg (61% of total).
Two commercially utilized species, the pink shrimp and the blue crab, accounted for 25.31 kg (27% of total).
Impingement of all other commercially utilized species was less than 1 kg during the period in question.
The remaining biomass impinged was distributed among several species of fish and shellfish.
7.
Designation of Apparent Cause of Occurrence:
The following unusual or periodic event was noted prior to, or during, the occurrence:
One oil barge entered the intake canal during sampling.
This event may have been partially responsible for the impingement cbserved.
l 80n nog'33 l
g
.g m,
- - m w
wy.
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000302/LER-1977-099, :on 770810,during Mode 1,primary Containment Average Temp Exceeded 130 F,Violating Tech Specs.Caused by Procedural Inadequacy Re Closed Industrial Cooling Water Supply Valve.Procedure SP-344 Revised |
- on 770810,during Mode 1,primary Containment Average Temp Exceeded 130 F,Violating Tech Specs.Caused by Procedural Inadequacy Re Closed Industrial Cooling Water Supply Valve.Procedure SP-344 Revised
| | | 05000302/LER-1977-104-01, /01t-1:on 770902,four RCS Flow Instruments Discovered Out of Calibr.Caused by Calibr Drift of Differential Pressure Transmitters.Transmitters Replaced. Instruments Will Be Calibr Every 18 Months | /01t-1:on 770902,four RCS Flow Instruments Discovered Out of Calibr.Caused by Calibr Drift of Differential Pressure Transmitters.Transmitters Replaced. Instruments Will Be Calibr Every 18 Months | | | 05000302/LER-1977-104, Forwards Rev 1 to LER 77-104 Re Four RCS Flow Instruments Exceeding Calibr Tolerances.Util Revising Commitment to Agree W/Tech Specs to Calibr Transmitters Every 18 Months | Forwards Rev 1 to LER 77-104 Re Four RCS Flow Instruments Exceeding Calibr Tolerances.Util Revising Commitment to Agree W/Tech Specs to Calibr Transmitters Every 18 Months | | | 05000302/LER-1977-158-03, /03L-0:on 771227,3B Emergency Diesel Generator Failed to Start During Monthly Surveillance Test SP-354. Caused by Foriegn Matter Preventing Governor to Function Properly.Servo Booster Cleaned & Tested | /03L-0:on 771227,3B Emergency Diesel Generator Failed to Start During Monthly Surveillance Test SP-354. Caused by Foriegn Matter Preventing Governor to Function Properly.Servo Booster Cleaned & Tested | | | 05000302/LER-1977-158, Forwards LER 77-158/03L-0 | Forwards LER 77-158/03L-0 | | | 05000302/LER-1977-159-03, /03L-0:on 771228,reactor Bldg Purge Exhaust Valve AHV-1B Did Not Auto Close Upon Reactor Bldg Purge Initiation.Caused by Purge Exhaust Valve AHV-1B Not Being Open Enough to Activate Automatic Closure Matrix | /03L-0:on 771228,reactor Bldg Purge Exhaust Valve AHV-1B Did Not Auto Close Upon Reactor Bldg Purge Initiation.Caused by Purge Exhaust Valve AHV-1B Not Being Open Enough to Activate Automatic Closure Matrix | | | 05000302/LER-1977-159, Forwards LER 77-159/03L-0 | Forwards LER 77-159/03L-0 | | | 05000302/LER-1977-160, E/04X-0:on 771221-22,biomass of Fish & Shellfish Impinged on Intake Screens Exceeding 50 kg/24-h ETS Levels. Partially Caused by Oil Barge Entering Intake Canal During Sampling | E/04X-0:on 771221-22,biomass of Fish & Shellfish Impinged on Intake Screens Exceeding 50 kg/24-h ETS Levels. Partially Caused by Oil Barge Entering Intake Canal During Sampling | | | 05000302/LER-1977-161, E/04X-0:on 771229-30,biomass of Fish & Shellfish Impinged on Intake Screens,Exceeding ETS Limits.Partially Caused by Oil Barge Entering Intake Canal During Sampling. Entire Scaled Sardine School May Have Been Trapped | E/04X-0:on 771229-30,biomass of Fish & Shellfish Impinged on Intake Screens,Exceeding ETS Limits.Partially Caused by Oil Barge Entering Intake Canal During Sampling. Entire Scaled Sardine School May Have Been Trapped | | | 05000302/LER-1977-163, Forwards LER 77-163/03L-0 | Forwards LER 77-163/03L-0 | | | 05000302/LER-1977-164, E/04X-0:on 771231 (Discovered 780111),correct Procedure Not Used for Environ Sample Analysis.Seawater, Small Terrestrial Animals & Vegetables Had LLDs Greater than ETS Requirements.Caused by Inadequate Sample Size | E/04X-0:on 771231 (Discovered 780111),correct Procedure Not Used for Environ Sample Analysis.Seawater, Small Terrestrial Animals & Vegetables Had LLDs Greater than ETS Requirements.Caused by Inadequate Sample Size | |
|