18 January 1978 3-0-3-a-1 CS-78-17 c a., o. o,o,,
Mr. J. P. O'Railly, Director Docket No. 50-302 U.S. Nuclear Regulatory Cotanission Licensee No. DPR-72 Office of Inspection & Enforcement LER No. 77-158/03L-0 l
230 Peachtree St. N.W., Suite 818 Crystal River Unit #3 Atlanta, GA 30303 Occurrenca Date: 27 Dec.1977
Dear Mr. O'Railly:
Enclosed please find Licensea Event Report 77-158/03L-0 and attached j
supplementary information sheet, which is submitted in accordance with
/
Technical Specification 6.9.1.9.A.
Should there be further questions, please contact us.
Very truly yours, O
LC.h. b44 08 W. P. Stewart Director, Power Product. ion DWP/rc Nuclear Plant Manager
,,3' s
Te Attach:
(2)
U S N S 4 I$ $ h '
io C N W M m.!
\\ c, h
u 1c O
i e
8002 270 g General Office 3201 Thuty rounn street souin. P o som 14c42. si Petersourg, Fionca 33733. 813-866-5 t51
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000302/LER-1977-099, :on 770810,during Mode 1,primary Containment Average Temp Exceeded 130 F,Violating Tech Specs.Caused by Procedural Inadequacy Re Closed Industrial Cooling Water Supply Valve.Procedure SP-344 Revised |
- on 770810,during Mode 1,primary Containment Average Temp Exceeded 130 F,Violating Tech Specs.Caused by Procedural Inadequacy Re Closed Industrial Cooling Water Supply Valve.Procedure SP-344 Revised
| | | 05000302/LER-1977-104-01, /01t-1:on 770902,four RCS Flow Instruments Discovered Out of Calibr.Caused by Calibr Drift of Differential Pressure Transmitters.Transmitters Replaced. Instruments Will Be Calibr Every 18 Months | /01t-1:on 770902,four RCS Flow Instruments Discovered Out of Calibr.Caused by Calibr Drift of Differential Pressure Transmitters.Transmitters Replaced. Instruments Will Be Calibr Every 18 Months | | | 05000302/LER-1977-104, Forwards Rev 1 to LER 77-104 Re Four RCS Flow Instruments Exceeding Calibr Tolerances.Util Revising Commitment to Agree W/Tech Specs to Calibr Transmitters Every 18 Months | Forwards Rev 1 to LER 77-104 Re Four RCS Flow Instruments Exceeding Calibr Tolerances.Util Revising Commitment to Agree W/Tech Specs to Calibr Transmitters Every 18 Months | | | 05000302/LER-1977-158-03, /03L-0:on 771227,3B Emergency Diesel Generator Failed to Start During Monthly Surveillance Test SP-354. Caused by Foriegn Matter Preventing Governor to Function Properly.Servo Booster Cleaned & Tested | /03L-0:on 771227,3B Emergency Diesel Generator Failed to Start During Monthly Surveillance Test SP-354. Caused by Foriegn Matter Preventing Governor to Function Properly.Servo Booster Cleaned & Tested | | | 05000302/LER-1977-158, Forwards LER 77-158/03L-0 | Forwards LER 77-158/03L-0 | | | 05000302/LER-1977-159-03, /03L-0:on 771228,reactor Bldg Purge Exhaust Valve AHV-1B Did Not Auto Close Upon Reactor Bldg Purge Initiation.Caused by Purge Exhaust Valve AHV-1B Not Being Open Enough to Activate Automatic Closure Matrix | /03L-0:on 771228,reactor Bldg Purge Exhaust Valve AHV-1B Did Not Auto Close Upon Reactor Bldg Purge Initiation.Caused by Purge Exhaust Valve AHV-1B Not Being Open Enough to Activate Automatic Closure Matrix | | | 05000302/LER-1977-159, Forwards LER 77-159/03L-0 | Forwards LER 77-159/03L-0 | | | 05000302/LER-1977-160, E/04X-0:on 771221-22,biomass of Fish & Shellfish Impinged on Intake Screens Exceeding 50 kg/24-h ETS Levels. Partially Caused by Oil Barge Entering Intake Canal During Sampling | E/04X-0:on 771221-22,biomass of Fish & Shellfish Impinged on Intake Screens Exceeding 50 kg/24-h ETS Levels. Partially Caused by Oil Barge Entering Intake Canal During Sampling | | | 05000302/LER-1977-161, E/04X-0:on 771229-30,biomass of Fish & Shellfish Impinged on Intake Screens,Exceeding ETS Limits.Partially Caused by Oil Barge Entering Intake Canal During Sampling. Entire Scaled Sardine School May Have Been Trapped | E/04X-0:on 771229-30,biomass of Fish & Shellfish Impinged on Intake Screens,Exceeding ETS Limits.Partially Caused by Oil Barge Entering Intake Canal During Sampling. Entire Scaled Sardine School May Have Been Trapped | | | 05000302/LER-1977-163, Forwards LER 77-163/03L-0 | Forwards LER 77-163/03L-0 | | | 05000302/LER-1977-164, E/04X-0:on 771231 (Discovered 780111),correct Procedure Not Used for Environ Sample Analysis.Seawater, Small Terrestrial Animals & Vegetables Had LLDs Greater than ETS Requirements.Caused by Inadequate Sample Size | E/04X-0:on 771231 (Discovered 780111),correct Procedure Not Used for Environ Sample Analysis.Seawater, Small Terrestrial Animals & Vegetables Had LLDs Greater than ETS Requirements.Caused by Inadequate Sample Size | |
|