05000302/LER-1978-040-03, /03L-0:on 780802,while Performing Surveillance Procedure SP-320,chemical Addition Pumps Failed to Develop Discharge Pressure.Cause as Yet Undetermined.Under Investigation

From kanterella
(Redirected from ML19308D161)
Jump to navigation Jump to search
/03L-0:on 780802,while Performing Surveillance Procedure SP-320,chemical Addition Pumps Failed to Develop Discharge Pressure.Cause as Yet Undetermined.Under Investigation
ML19308D161
Person / Time
Site: Crystal River 
Issue date: 08/28/1978
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19308D143 List:
References
LER-78-040-03L, LER-78-40-3L, NUDOCS 8002270633
Download: ML19308D161 (2)


LER-1978-040, /03L-0:on 780802,while Performing Surveillance Procedure SP-320,chemical Addition Pumps Failed to Develop Discharge Pressure.Cause as Yet Undetermined.Under Investigation
Event date:
Report date:
3021978040R03 - NRC Website

text

. - _____

q I.

Lu ets.wuctraa necutarony commission d

mac eonu as[

cr.ns LICENSEE EVENT REPORT EXHIBIT A tettAst raint on tv,c ALL accuento imponuancNI I

cournos sioce 1 l 1 I

l !

l gj _g_ ;g l 7 i LI o R) P1 3 g l o I O l-l 0 1 0l 0 i 0 0 l to i o g3 i lj 1 1 g 4

5 j

m a coa.

om. -..

a =

wcas,.....

['"j [L@l 0; 5 0 J -10 3:012 @l 01 Bio f 2171 81@l Of 812 I a l 7f gl@

conr loIil sw a= r :4r a.

is

.a.ca r a.re u

u oocur s. ia.

s e tvtur otscunow Ano,aosmata cesstcututs @

CAP-1A and 13

  • h, ch h e t we~

p.._y.

@ I At 0030 it was discovered *har f

g, failed to develop discharge pressure while performing Surveillance

, Procedure SP-320.

Borated water storage tank was available but concentratiott f

m,was not within Tec:.aical Specifications requirements to perform cera This event is contrary to Tech Spec 3.1.2.1 and 3.1.2.6.

Publig g ; alteration.

, Health and Safety not affected. No core alterations or positive reactivity g changes were performed.' Third occurrence of an event of this type.

g a

svaiE*:

s0M

'PoE'*

'c'E ' sfei$'s ca.iaosaw ::::

1R ( 3 l@' [XJ@ ] Zl@ l P I UIM I P l XI XI@ l Bl@ l Zl @

lo191 2

i.

22

.se.

s,.

2 i,

aavis.o oce...e.:

,a aviat' a5 car a.

@ aig I 7I8'a=

[- J 10 1410i y

l 013 i (L_1 L. -!

l of u. o I

_n u

z.

.s 2,

a u

1 u

)

V Os A

T 17 a.Cual 8 3 v:4 r &

v&=

Aga L.s.TJ @l NI@

l N!@

'c ! 33 0 l o l@ '

LI_JSLIJG I z i@

Lg@

1010: 0: of

.e n

u u

u v

.a

,,,,,lThisanomalyisunderinvesti@gationandevaluationtodeterminetheap cAus otsc.wriomo conatem s AcTiess g gcause. To preclude the problem of the pumos becoming airbound and losing J

, suction pressure, each chemical addition pump is being run each day i

I f7TTI I I

1 1 1_j l

.a or-t=sTu w @ E55N

s:s eav :sse-r : i @

's'r*M s ease NA l. (B_J@! Ooerator obser ration l

g [_Hj@ l 0 f 01 01@l a-33

.4 48 44 33 y,

1 8

  • ettg asg
- e st' t as t av.sT *a:Tnarv Locar.3s om ettgagg f TTl (_ZJ LZJ33 NA I

I NA I

i 30 1

e a s it to

.a

  • t St%sts8**JS.ags mvyst*
      • T et s.**'er'?%

I iii i I Ot o 10lOLZ_!@l NA egal.Ntt 's!.e5 $

.u:

..es @

m.

, i.

8, I 010 i Ol@l NA I

u 1065 0, to

  • ava, t 70 saca.it.

j p==g e et re s.e.e*

g NA 8 () O 9 o m b(

l Ii!'.I[_Zj@l

~s u

.,gs,:.., os @

~a< m w I

I s,' '.'_.a I

IP L.s!'L'.I v2 e s 604 ) 795-64 0 L Noner

..ost si..t.,.c,2nta (SEE ' ATTACliED SUPPLEMF.57AKY 2:F0D'ATIO:t S11EET) l m,.~

~_

~m

~.

_m

~

SUPPLEMENTART INFO!OfATION Report No.:

50-302/78-040/03L-0 2.

Facility:

Crystal River Unit #3 3.

Report Date:

28 August 1978 4

Occurrence Date:

2 August 1978 5.

Identification of Occurrence:

Chemical Addition Pumps, CAP-1A and 13 inoperable contrary to Technical Specification 3.1.2.1 and 3.1.2.6.

6.

Conditions Prior to Occurrence:

Mode 6 refueling.

7.

Description of Occurrenca:

At 0030, on 2 August 1978 it was discovered that the Chemical Addition Pumps, CAP-1A and 13 failcl to develop s dficient discharge pressure while performing Surveillance Procedure SP-320, 0; rability of Boroc Injection Sources and Pumps.

The action statement requiring thz suspension of all operation involving core alterations or positive reactivity changes until at least one injection path is restored was immediately instituted. The Borated water storage tank was available but contained a concentration not yet within Technical Specification requirements to perform core alterations. The pump case and suction lines were vented. Within thirty ninutes system opert 111ty was restored and SP-320 was successfully accomplished meeting acceptance criteria.

8.

Designation of Apparent Cause:

An investigation is under way to determine the cause of this anomaly.

9.

Analysis of Occurrence:

This event had no safety significance as there were no operations involving core alterations or positive reactivity changes at the time of this event.

10.

Corrective Action

I Short Term Instructions have been issued to run the Chemical Addition Pumps, CAP-1A and 13 each day to reduce the problem of the pumps becoming air bound and losing auction pressure until the investigation is complete and data is analyzed, at which time a more positive corrective action can be established.

11. Failure Data:

This is the third occurrence of an event of this type.

i

/rc

.. l