.;.C..g 2 February 1977
/
CS-77-19 e mggmar em am e N
~-
p 4
8 9
Mr. Norman C. Moseley, Director Docket No. 50-302 Office of Inspection and Enforcement License #DPR-72 T.
' U. S. Nuclear Regulatory Commission Licensee Event Report 77-7 230 Peachtree St., N.W., Suite 818 Atlanta, Georgia 30303
Dear Mr. Moseley:
Please find enclosed Licensee Event Report 77-7, which is submitted pur-
~
suant to Technical Specifications 3.5.2 and 6.9.2 as a written Special Ninety (90) Day Report.
During trouble shooting of Emergency Safeguards Actuation System (Chan-nel 2), high pressure injection was inadvertently actuated..The cause of this actuation was determined to be incorrect channel feed designation.-
A d.esign. change has been requested to correct this error.
There were no adverse conseq'tences as a result of this actuation. Because the Reactor Coolant System was in Cold Shutdown Mode, this incident is con-sidered to be zero (0) accumulated high pressure injection cycles.
Very truly yours, FLORIDA POWER CORPORATION j
I s
La, m&
W. P. Stewart Director, Power Production DWP/feh Enclosure pj'lO Ov NucTear Plant Manager 1408 8 0 02 270 $pp
~
S CRYSTAL RIVER NUCLEAR PLANT P.O. BOX 1228, CRYSTAL RIVER, FLA 32629
.