ML19308D091

From kanterella
Jump to navigation Jump to search
Forwards RO-77-07
Date released: 11/18/2019 Download: ML19308D091


RO-77-07:on 761217,HPI Inadvertently Actuated During Trouble Shooting of Emergency Safeguards Actuation Sys.Caused by Design Drawing Showing Incorrect Channel Designation.Design Re Designation of Channel Feed Changed
ML19308D096
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/02/1977
From: Stewart W
FLORIDA POWER CORP.
To:
References
Download: ML19308D096 (1)
Forwards RO-77-07
ML19308D090
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/02/1977
From: Stewart W
FLORIDA POWER CORP.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
Download: ML19308D090 (1)