Forwards IE Insp Repts 50-508/79-10 & 50-509/79-08 on 791106-09 & Notice of Violation
ML19308D014
Person / Time
Site: Satsop
Issue date: 12/14/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19308D010 List:
References
NUDOCS 8002130090
Download: ML19308D014 (2)


See also: IR 05000508/1979010

Text

Ti

>

-

.-

.

p u%q#o

)

l!NITED STATES

s

.-

[~7

f.

j

NUCLEAR REGULATORY COMMISSION

3

c

REGION V

S

[

1990 N. CALIFORNI A BOULEVARD

%, * * , , e [

SulTE 202, WALNUT CREEN PLAZA

WALNUT CREEK, CALIFORNI A 94596

DEC 1 > 1979

-

Docket flos. 50-508

50-509

Washington Public Power Supply System

P. O. Box 468

Richland, Washington 99352

e

Attention: Mr. N. O. Strand

Managing Director

.

Gentlemen:

Subject: NRC Inspection - WNP 3 and 5

This refers to the inspection conducted by Messrs. D. F. Kirsch and T. W.

Bishop of this office on November 6-9, 1979 of activities authorized by

NRC Construction Permit Nos. CPPR-154 and CPPR-155, and to the discussion

of our findings held by Mr. Kirsch with Mr. W. J. Talbott and other members

of your staff at.the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspec-

tion report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements, as

set forth in the flotice of Violation, enclosed herewith as Appendix A.

These

items of noncompliance have been categorized into a level as described in

our correspondence to all NRC licensees dated December 31, 1974.

'

This notice is sent to you pursuant to the provisions of Section 2.201, of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within thirty (30)

days of your receipt of this notice, a written statement or explanation in

reply including 1) corrective steps which have been taken by you and the re-

sults achieved; 2) corrective steps which will be taken to avoid further

violations; and 3) the date when full compliance will be achieved.

l

l

80021300M

.

.

.

,

.

.

Washington Public Power Supply System

-2-

.

In accordance with Section 2.790 of the flRC's " Rules of Practice," Part 2

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

' inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 30 days

of the date of this letter, requesting that such information be withheld from

public disclosure. The application must include a full statement of the reasons

why it is claimed that the information is proprietary.

The application should

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the encidsure

will also be placed in the Public Document Room.

If we do not hear from

you in this regard within the specified period, the report will be placed

in the Public Document Room.

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely,

,

G. S. Spencer, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

A.

Notice of Violation

B.

IE Inspection Report

Nos. 50-508/79-10

50-509/79-08

i

cc w/o enclosure B:

M. E. Witherspoon, Division Manager

Quality Assurance, WPPSS

cc w/ enclosures:

W. J. Talbott, Division Manager, WPPSS

>