Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-508/79-10 & 50-509/79-08
ML19308D009
Person / Time
Site: Satsop
Issue date: 01/31/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19308D010 List:
References
NUDOCS 8002130080
Download: ML19308D009 (1)


See also: IR 05000508/1979010

Text

sc#M

.

,

.s#f(

UNITED STATES

g

g

NUCLEAR REGULATORY COMMISSION

L.

'j

REGION V

.

Q

1990 N. CALIFORNIA BOULEVARD

%,

,e"g

SUITE 202, WALNUT CREEK PLAZA

  • e.,*

WALNUT CR EE K, CALIFORNI A 94596

JAN 31 1980

Docket flos. 50-508

50-509

Washington Public Power Supply System

P. O. Box 468

Richland, Washington 99352

Attention: Mr. N. O. Strand

Managing Director

Reference:

1)Ltr.,G.S.SpencertoN.O.Stranddated

December 14, 1979; Subject: NRC Inspection

WNP 3 & 5

2)Ltr.No.G03-80-91, D. L. Renberger to G. S. Spencer

dated January 18, 1980; same subject, Response to

Notice of Violation

Gentlemen:

Thank you for your letter identified above as Reference 2, informing us of

the steps you have taken to correct Items A and B which we brought to

your attention in our letter identified above as Reference 1.

Your

corrective actions will be verified during a future inspection.

As a result of our evaluation of your response to Item C, the Regional

NRC position is unchanged. Accordingly, your response to Item C is being

forwarded to IE:HQ for further technical evaluation.

Sincerely,

'

ief

Reactor Construction and

Engineering Support Branch