sc#M
.
,
.s#f(
UNITED STATES
g
g
NUCLEAR REGULATORY COMMISSION
L.
'j
REGION V
.
Q
1990 N. CALIFORNIA BOULEVARD
%,
,e"g
SUITE 202, WALNUT CREEK PLAZA
- e.,*
WALNUT CR EE K, CALIFORNI A 94596
JAN 31 1980
Docket flos. 50-508
50-509
Washington Public Power Supply System
P. O. Box 468
Richland, Washington 99352
Attention: Mr. N. O. Strand
Managing Director
Reference:
1)Ltr.,G.S.SpencertoN.O.Stranddated
December 14, 1979; Subject: NRC Inspection
WNP 3 & 5
2)Ltr.No.G03-80-91, D. L. Renberger to G. S. Spencer
dated January 18, 1980; same subject, Response to
Gentlemen:
Thank you for your letter identified above as Reference 2, informing us of
the steps you have taken to correct Items A and B which we brought to
your attention in our letter identified above as Reference 1.
Your
corrective actions will be verified during a future inspection.
As a result of our evaluation of your response to Item C, the Regional
NRC position is unchanged. Accordingly, your response to Item C is being
forwarded to IE:HQ for further technical evaluation.
Sincerely,
'
ief
Reactor Construction and
Engineering Support Branch