ML19305E279
| ML19305E279 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 01/16/1980 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Strand N WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML19305E266 | List: |
| References | |
| NUDOCS 8004230273 | |
| Download: ML19305E279 (2) | |
See also: IR 05000460/1979013
Text
2
d
Ob
p uc ua
. kt
UNITED STATES
y y ,, ( ' gg
NUCLEAR REGUCATORY COMMISSION
7, .- ('
c. c
REGION V
g ' 46 -
[
1990 N. CALIFORNIA BOULEVARD
'%#
SUITE 202, WALNUT CREEK PLAZA
o
e,,,*
WALNUT CR E E K, CALIFORNi A 94596
JAN 1C 1980
-
Docket flos. 50-460
L
} M r
3,
50-513
Li y [j.
, ' " > +
yv,i % g4j
, :4 , C
-
4
3
h
'
- wam
Washington Public Power Supply System
P.O. Box 968
Richland, Washington 99352
Attn: Mr. N. O. Strand
Managing Director
Gentlemen:
Subject: NRC Inspection at Washington Nuclear Projects 1 and 4
This refers to tne inspection conducted by Mr. A. Toth of this office
during the period of December 1-31, 1979 of activities authorized by
NRC Construction Permit Nos. CPPR-134 and 174, and to the discussion
of our findings held by Mr. Toth with Mr. T. Houchins and other members
of your staff on December 10,17 and 31,1979.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violations, enclosed herewith as Appendix A.
This item of ".cncompliance has been categorized into a level as described
in our ccer :onndence to all NRC licensees dated December 31, 1974.
This notice is sen; to you pursuant to the provisions of Section 2.201, of
the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regu-
lations.
Section 2.201 requires you to submit to this office, within
thirty (30) days of your receipt of this notice, a written statement
or explanation in reply including (1) corrective steps which have been
taken by you and the results achieved; (2) corrective steps which will
be taken to avoid further violations; and (3) the date when full
compliance will be achieved.
8004230 j
,
.
'
-
.
.
'
.
.
N. O. Strand
-2-
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with your commitments in
the PSAR, as set forth in the Notice of Deviation, enclosed herewith as
Appendix B.
With your reply to this letter, please include your comments
and proposed actions relative to this item.
l
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you believe
to be proprietary, it is necessary that you submit a written application
'
to this office, within 30 days of the date of this letter, requesting
that such infomation be withheld from public disclosure. The application
must include a full statement of the reasons why it is claimed that the
information is proprietary. The application should be prepared so that
any proprietary information identified is contained in an enclosure to
the application, since the application without the enclosure will also
,
1
be placed in the Public Document Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
,.Y
.&
George S. Spencer, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
A.
B.
Notice of Deviation
C.
IE Inspection Report
Nos. 50-460/79-13
50-513/79-13
cc w/o Enclosure C:
M. E. Witherspoon, Division Manager
Quality Assurance, WPPSS
J. P. Thomas, Project Manager, WPPSS