ML19305E286
Jump to navigation
Jump to search
| ML19305E286 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 01/15/1980 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML19305E266 | List: |
| References | |
| 50-460-79-13, 50-513-79-13, NUDOCS 8004230287 | |
| Download: ML19305E286 (1) | |
Text
'
O APPENDIX B Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352 Docket No. 50-513 Construction Permit No. CPPR-174 NOTICE OF DEVIATION Based on the results of an NRC inspection conducted during the period of December 1-31, 1979, it appears that one of your activities was not conducted in conformance with your commitments to the Commission as indicated below:
Contrary to ANSI-N45.2.2, parts 6.2.1 and y.5, (applicable standard referenced in PSAR Section 3.12 under Regulatory Guide 1.38), provisions had not been provided to control and limit access to level C storage areas only to personnel designated by the responsible organization, during December, 1979.
This is a deviation.
8004280 5
,