ML19305C417
| ML19305C417 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/18/1980 |
| From: | Stohr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hancock J FLORIDA POWER CORP. |
| Shared Package | |
| ML19305C405 | List: |
| References | |
| NUDOCS 8003280518 | |
| Download: ML19305C417 (2) | |
See also: IR 05000302/1979054
Text
--
---
.
,
(~
- l )
s ur
/
UNITED STATES
f)g
NUCLEAR REGULATORY COMMISSION
-
'
i
a
.
y[e
s
REGION 11
0,
.
101 MARIETTA sT., N.W., SUITE 3100
'
%O*****/
ATLANTA, GEORGIA 30303
In Reply Refer To:
JAN 181980
RII:SCE
50-302/79-54
Florida Power Corporation
ATTN:
J. A. Hancock, Director
Nuclear Operations
P. O. Box 14042, Mail Stop C-4
St. Petersburg, FL 33733
Gentlemen:
This refers to the inspection conducted by S. C. Ewald of this office on
December 17 1 , 1979, of activities authorized by NRC Operating License
No. DPR-72 for the Crystal River facility, and to the discussion of our findings
held with D. Poole at the conclusion of the inspection.
,
The inspection was an examination of the activities conducted under your license
as they relate to radiation safety and to compliance with the Commission's rules
and regulations and the conditions of your license. The inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed here-
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office, within 20
days of your receipt of this notice, a written statement or explanation in reply
including:
(1) corrective steps which have been taken by you and the results
achieved; (2) corrective steps which will be taken to avoid further noncom-
,
pliance; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Prectice," Part 2,
Title 10, Code of Federal Regulations, a copy of this litter and the enclosed
inspection report will be placed in the NRC's Public Doctment Room.
If this
report contains any information that you (or your contrattor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public distlosure. Any such
application must include a full statement of the reasons on tue basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
I
the specified period, the report will be placed in the Public Document Room.
.
%17
l
8008280
_.
-
=
_
~ -
-
- ,
.
JAN18 ESO
O
Florida Power Corporation
-2-
.
.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/
.
.
_
'
hilip
ohr, Ch ef
Fuel Facility and Materials
Safety Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-302/79-54
cc w/ encl:
D. C. Poole
Nuclear Plant Manager
P. O. Box 1240
Crystal River, FL 32629
,
4