ML19305C068

From kanterella
Jump to navigation Jump to search
Amend to 771222 Application for Amend of Ol.Amend Revises Application to Provide Second Level of Undervoltage Protection W/Time Delay for safety-related Loads,To Reflect Discussions W/Nrc.W/Certificate of Svc & Affidavit
ML19305C068
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/21/1980
From: Bauer E, Bradley E, Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML19305C029 List:
References
NUDOCS 8003250548
Download: ML19305C068 (11)


Text

_ _ _ _ _-__---.

.b ,

s_ /

BEFORE THE

, i UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of  :

Docket Nos. 50-277 PHILADELPHIA ELECTRIC COMPANY  : 50-278 AMENDMENT 'IO ,

DECEMBER 22, 1977 APPLICATION FOR AMENDMENT OF FACILITY OPERATING LICENSES DPR-44 & DPR-56 Edward G. Bauer, Jr.

l l

Eugene J. Bradley 2301 Market Street i Philadelphia, Pennsylvania 19101 i Attorneys for Philadelphia Electric Company 800325074g n -,wq y. *- eam e

4 DEIORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of  :

Docket Nos. 50-277 PHILADELPICA EL4CTRIC COMPANY  : 50-278 AMENDMENT TO DECEMBER 22, 1977

, APPLICATION FOR AMENDMENT OF FACILITY OPERATING LICENSES DPR-44 & DPR-56 By application dated December 22, 1977, Philadelphia Electric Company requested an amendrent to the Technical Specifications for Peach Bottom Units 2 and 3 in response to an 1EC request to provido a second level of undervoltage protection with a time delay for safety related loads. Subsequent to the filing, additional inturmation was requested by letter from W. P.

Gammill (NRC) to All Power Reactor Licensees dated August 8, 1979. Licensee's response was provided by letters from S. L.

Uditrotf (PECO) to W. P. Gammill (NRC) dated October 5, 1979 and S. L. Daltroff (PECO) to T. A. Ippolito (NRC) dated December 31, L

1979.. A meeting was also held between Philadelphia Electric Company and Nuclear Regulatory Commission staff in Bethesda, Maryland on November 27, 1979 to discuss the submitted l information in more detail.

Based upon additional information developed during review of the December 22, 1977 Application, Licensee has determined that it would be appropriate to modify the proposed undervoltage protection syset.m to provide a timing sequence of an inverse time-voltage nature.

Accordingly, Philadelphia Electric Company, Licensee under Facility Operating Licenses DPR-44 and DPR-56 for Peach Bottom Atomic Power Station Units No. 2 and 3 respectively, hereby amends its Application of December 22, 1977 by (a) deleting the proposed revised Technical Specification pages 71, 71a, 81, 82 and 93a referred to therein and substituting therefore updated pages 71, 71a, 81, and 93a, which are attached hereto and incorporated herein by reference; and (b) deleting the second through fifth paragraphs of the December 22, 197'r Application and substituting the following paragraphs..

The changes to Tables 3.2..B and 4.2.B, and bases 3.2 are proposed to provide a second level of undervoltage protection with a time delay for safety related loads This system will prevent damage to safety related equipment and controls during periods of sustained degraded voltage at the offsite power sources. Each of the two offsite power sources will be monitored at the buu by undervoltage relaying. With a degraded voltage condition at an offsite source, the undervoltage sensing relays 2

. - - - - - - - - - - - , - - - - - - - --J~---

will operate to start a timing sequence. The timing sequence is of the inverse tim <_-voltage nature; such that at 90% nominal voltage the time delay is 60 seconds and at 60% nominal voltage the time delay is 12 seconds. When the timing sequence has timed out the corresponding Emergency Startup source circuit breakers will be tripped allowing transfer of the connected emergency buses to the alternate source if it is available.

The 90% figure was selected to correspond to the NEMA Standard voltage rating of + 10%.

The majority of the large electrical equipment was specified to operate between + 20%

voltage, however some equipment was procured with only the standard ratings.

The time delay setpoint is dictated by two concerns.

First, the trip system should not operate on a voltage transient caused by the starting of large apparatus. A setpoint of 10-15 seconds would satisfy this criterion. Second, both the No. 2 startup & Emergency Auxiliary Transformer and the No. 3 Startup 6 Emergency Auxiliary Regulating Transformer are equipped with automatic voitoge control (load tap changers) which should be allowed to operate before initiating transfer of the Emergency Buses. The automatic voltage control senses undervoltage conditions and initiates corrective action via the load tap changers on the transformers.

The automatic voltage controls have an initial 30 second time delay to prevent tap changes due to starting L -

transients. Following the initial 30.second delay there is a 3-5 cecond delay between tap changes. A time delay of 60 seconds would allow the tap changes to make approximately eight tap changes (a total of 5% voltage adjustment) before initiation of the transfer to the alternate source.

Since the modifications to the facility wil.L not be implemented until Commission approval of the change, it is requested that the changes to the Technical Specifications be made effective upon completion of the installation.

The Plant Operation Review Coldmittee and the Operation and Safety Review Committee have reviewed this Amendment to the company 's December 22, 1977 Application, the proposed changes to I

the Technical Specifications requested herein, and the proposed modifications to the facility, and have concluded that they do not involve an unreviewed safety. question or a significant hazard consideration; and will not endanger the health and safety of the puDlic.

Respectfully submitted, PHILADELPHIA ELECTRIC COMPANY By M [ '

'/

l Vice President '

l l

l t

l

- COMMONWEALT11 OF PENNSVLVANIA  :

ss.

COUNTY OF P111LADELP11IA  :

S. L. Ddltroff, being first duly sworn, depc,ses and says:

That he is Vice President of Philadelphia Electric company, the Applicant. herein; that he has read the foregoing Amendment to December 22, 1977 Application for Amendment of Facility Operating Licenses and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

9 / $

/ - . ,'

Q j st{bs j i e Subscribed and sworn to beforc att this 19 day of M oc cA , 19So u . /iN-d' L/ ,hh i /,(Q

,tiotary Public rMy rum. nae. angna co.

f,iy Cer:'n ; [x; f i sy 23. LW3 l

l b-

- ~

CERTIFICATE OF SERVICE

.I certify that service of the foregoing Amendment to Documber 22, 1977 Application was made upon the Board of Supervicors, Peach Bottom Township, York County, Pennsylvania, by mailing a copy thereof, via first-class me.il, to Albert R.

Steele, Chairman of the Board of Supervisors, R. D. No. 1, Delta, Pennsylvania 17314; upon the Board of Supervisors, Fulton Township, Lancaster County, Pennsylvania, by mailing a copy

-thereof, via first-class mail, to George K. Brinton, Chairman of the Board of Supervisors, Peach Bottom, Pennsylvania 17563; and upon the Board of Supervisors, Drumore Township, Lancaster County, Pennsylvania, by mailing a copy thereof, via first-class mail, to Wilmer P.. Bo). ton, Chairman of the Board of Supervisors, R. D. No. 1, Holtwood, Pennsylvania 17532; all this 21st day of March, 1980.

-1 __ T rene[Bradley Attor ey for Philadelphia Electric Company b

i k.

.-~,.. . , . . . - -, . . . ;.

?

TetLE .).2.e (Cont'a) .

IsS1 ROM D TATI? TPAT INITIATES t,8 CCMFOLS 7" -M E %:) CC;.TAINMENT COOLING SYSILPS nu.tmas bo. . . . .

vt 0;v r an te- .

f. umber of Instru-Instrumenti Trip t enction . Irlp Le. 5etting . men t Cr.a79 sis Pro nemarns Cnar.nels Per.. vloeu sf ves13n lun_h21sM11___ ___ _____ -_____________________________ _____ - _ _ _ . ___ __

l' 4 (b). siEC1 Steam Line Low 100)p)50 psig (3) 4 Inst.

Pressure 4 NFCI Iurbine $200 deg. F (3) 4 Ins t.)

Ccapartrent Temp. )

)

.s. 4 hPCI Steam Line' 5200 ceg. F (3) 8 Inst.) Io Inst.

Area Temperature .)

)

2 HPLI/Rh8 Valve $200 deg. F (3) 4 Ins t .)

Staticn Area Temperature-

, 'l per 4K% AnV Faergency Bus 254154 cf Hateo 1. Trips all loaded y bus Undervcitage Helay Voltage breakers

'* . 2. Fast transfer per-

  • missive
3. Dead Dus start cf diesel 1 per 4KV 4nV Emergency eus 95t (+02,-104) of Permits sequential bus . Sequential Loading Ratet voltage starting of vital 1 cads Relay Emergency

~

2 pe r 4 K V 60t+5 cf Rated 1. Trips emergency trans-aus Transfctrer- Vcitage former feed to 4KV Undervoltage erergency bus

2. Fast Transfer Persissive 1 LPCI Cross-Connect NA 1 Inst. Initiates annunciaticn Position .nen valve is not closed 2 ver 4 KV Energency Trans- 90% (152) cf 1. Trips emergency trans-fus torrer Degraded hated voltage fcreer feed to 4 KV voltage with oc second energency bus.

(Ins ta nt eous)

(+5%) .tivo deldv.

2. Fast transfer rermissive

J

. b e

v

- i s s n s aV i rA m t r y

4 e p

co.

nt s r e

gd b u e f re s eey n mf c a e e n a re t seg pzr t ire s rcm a Tf e F 1 2 m

e f g ca t

l Mo 5 v (l

e 4t 0a 9R

- e.

sds) nere ad eg rava Trnt gI l ye( o cD v n e eru-geo ret e

e. r l 2 n co1 Et vt V

k 4

r 2

8 *,

> 8 e .

e

IhtLL hai:t .

Ulult9t_IESI_SUD_9511DESIIGh_EEEikE2CI.E98.9193 Insituacal_Cuanoci Insitulent_Euns11snal.1cs1 C211nIs1190.EIc29susx InsitustDI CDeca.

1) lieoctor .ater Level (7) (1) (3) Once/eperating cycle Once/ day
2) Drywell Pressure (7) (1) (3) Once/cperasing cycle Once/ day

'. ) (3) Cnce/ operating cycle. Once/ day

3) Reactor Pressore (7)
4) Auto Sequer.cing liners NF Once/ operating cycle None
5) ADS - LPCI er CS Pump Disch. (1) Once/3 months None Pressure Interlock Trip Systen Bus Power Monitors NA Mone
6) _ (1)
7) Core Spray Sparger d/p (1) Once/6 montns Once/ day
8) Steam Line High Flow (HPCI 6 RCIC) (1) Cnce/3 scnths None
9) Steam Line High Temp. (!H PCI & RCIC) (1) (3) ,

Once/ operating cycle Once/ day i

  • 10) Safeguards Area High Temp. (1) Once/3 months None-0 11) HPCI and nCIC Steam Line (1) Once/3 scnths None.

, Low Pres.c_.

(1) Once/3 months None

12) HPCI. Suction Source Levels
13) 4KV Emergency Power System Once/ operating cycle Once/5 year None Voltage Relays Once/cperating cycle Once/ operating cycle None
14) ADS Relief Valves Bellows Pressure Switches
15) LPC1/ Cross Connect Valve Position Once/ refueling cycle N/A N/A
16) 4 KV Emergency Power Source Once/ operating cycle Once/5 years None i Degradeo Voltage Relays I O

g4% ., __.-

PBAPS 3.2 BASES (Cont'd)

The Emergency Aux. Power Source Degraded Voltage trip function prevents damage to safety related equipment in the event of a custained period of low voltage. The voltage supply to each of the 4kV buses will be monitored by undervoltage relaying. With a degraded voltage condition on the offsite sources the undervoltage sensing relays operate to ini':iate a timing sequence. The timing sequence is of the inverse. time-voltage nature; such that at 90% voltage, the time delay is 60 seconds aad at 60% nominal voltage the time delay is 12 seconds. When the timing sequence is completed, the corresponding 4kV emergency circuit kraakers are tripped and the emergency buses are tra.. ierred to the alternate source. This timing sequence was selected to prevent unnecessary transfers during motor starts and to allow the automatic tapchanger on the startup transformer to respond to the voltage condition.

- 93a -