Forwards IE Insp Repts 50-413/79-23 & 50-414/79-23 on 791217-19 & Notice of Violation
ML19305B948
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 01/18/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19305B934 List:
References
NUDOCS 8003250379
Download: ML19305B948 (2)


See also: IR 05000413/1979023

Text

b

,

,

pa n:

  1. '

o

UNITED STATES

~g

!

NUCLEAR REGULATORY COMMISSION

'I

o

.

$

E

REGION il

o,

[

101 MARIETTA ST., N.W., SUITE 3100

          • [

ATLANTA, G EoRGIA 303o3

JAN 181980

In Reply Refer To:

RII:WPK

50-413/79-23

50-414/79-23

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by W. P. Kleinsorge of this office on

December 17-19, 1979 of activities authorized by NRC Construction Permit Nos.

CPPR-116 and CPPR-117 for the Catawba Nuclear Station facility, and to the

discussion of our findings held with D. G. Beam at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your license

-

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Section 2.201 requires you to submit to this office,

within 20 days of your receipt of this notice, a written statement or explan-

ation in reply including:

(1) corrective steps which have been taken by you and

the results achieved; (2) corrective steps which will be taken to avoid further

noncompliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's "Kules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of ti.f s letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

[

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

<

the specified period, the report will be placed in the Public Document Room.

,

!.

8003250 M

.

.

~'

- ,

i

Duke Power Company.

-2-

jg4 y g 9ggg

.-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

f'/

.i

<

T. Bry' ant, Acting Chie

a

Reactor Construction and Engineering

Support T 'anch

Enclosures:

1.

Appendix A, Notice of Violation

+

2.

Inspection Report Nos. 50-413/79-23

and 50-414/79-23