Forwards IE Insp Repts 50-317/79-13 & 50-318/79-10 on 790730-0802 & Notice of Violation
ML19296D220
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/17/1979
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19296D213 List:
References
NUDOCS 8003030025
Download: ML19296D220 (2)


See also: IR 05000317/1979013

Text

.

,,

UNITED STATES

$

NUCLEAR REGULATORY COMMISslON

jy

o

FIEGION I

$

,j

$35 PARK AVENUE

.l

f

KING OF PRUSSI A, PENNSYLV ANIA 19406

Y...../

Docket Nos. 50-317

OCTI7 W3

50-318

Baltimore Gas and Electric Company

ATTN: Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland

21203

Gentlemen:

Subject:

Combined Inspection 50-317/79-13 and 50-318/79-10

This refers to the inspection conducted by Mr. K. Plumlee of this office on July

30 - August 2, 1979 at the Calvert Cliffs Nuclear Power Station, Units 1 and 2,

Lusby, Maryland of activities authorized by NRC License Nos. DPR-53 and DPR-69

and to the discussions of our findings held by Mr. Plumlee with Mr. L. Russell

and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Based on the results of this inspection, it appears that cer tain of your activi-

ties were not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A.

These items of

noncompliance have been categorized into the levels as described in our corres-

pondence to you dated December 31, 1974. This notice is sent to you pursuant to

the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations.

Section 2.201 requires you to submit to this

office, within twenty (20) days of your receipt of this notice, a written state-

ment or explanation in reply including:

(1) corrective steps which have been

taken by you and the results achieved; (2) corrective steps which will be taken

to avoid further items of noncompliance; and (3) the date when full compliance

will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any infor-

mation that you (or your contractor) believe to be proprietary, it is necessary

that you make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must be accompanied

by an affidavit executed by the own:r of the information, which identifies the

document or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by the

Commission as listed in subparagraph (b) (4) of Section 2.790.

The information

8003030 O

.

.

Baltimore Gas and Electric Company

2

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will ' , pleased to

discuss them with you.

Sincerely,

~

f

Gegrge

. Smith, Chief

Fuel F cility and Materials Safety

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforc. . ant Combined Inspection

Report Numbers 50-317/79-13 and 50-318/79-10

cc w/encls:

R. M. Douglass, Manager, Quality Assurance

L. B. Rus ell, Chief Engineer

W. Gibson, General Supervisor, Operations QA

R. C. L. Olson, Senior Engineer

K. H. Sebra, Principal Engineer