ML19296D220
| ML19296D220 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 10/17/1979 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML19296D213 | List: |
| References | |
| NUDOCS 8003030025 | |
| Download: ML19296D220 (2) | |
See also: IR 05000317/1979013
Text
.
,,
UNITED STATES
$
NUCLEAR REGULATORY COMMISslON
jy
o
FIEGION I
$
,j
$35 PARK AVENUE
.l
f
KING OF PRUSSI A, PENNSYLV ANIA 19406
Y...../
Docket Nos. 50-317
OCTI7 W3
50-318
Baltimore Gas and Electric Company
ATTN: Mr. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland
21203
Gentlemen:
Subject:
Combined Inspection 50-317/79-13 and 50-318/79-10
This refers to the inspection conducted by Mr. K. Plumlee of this office on July
30 - August 2, 1979 at the Calvert Cliffs Nuclear Power Station, Units 1 and 2,
Lusby, Maryland of activities authorized by NRC License Nos. DPR-53 and DPR-69
and to the discussions of our findings held by Mr. Plumlee with Mr. L. Russell
and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and observations by the inspector.
Based on the results of this inspection, it appears that cer tain of your activi-
ties were not conducted in full compliance with NRC requirements, as set forth
in the Notice of Violation, enclosed herewith as Appendix A.
These items of
noncompliance have been categorized into the levels as described in our corres-
pondence to you dated December 31, 1974. This notice is sent to you pursuant to
the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations.
Section 2.201 requires you to submit to this
office, within twenty (20) days of your receipt of this notice, a written state-
ment or explanation in reply including:
(1) corrective steps which have been
taken by you and the results achieved; (2) corrective steps which will be taken
to avoid further items of noncompliance; and (3) the date when full compliance
will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any infor-
mation that you (or your contractor) believe to be proprietary, it is necessary
that you make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must be accompanied
by an affidavit executed by the own:r of the information, which identifies the
document or part sought to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by the
Commission as listed in subparagraph (b) (4) of Section 2.790.
The information
8003030 O
.
.
Baltimore Gas and Electric Company
2
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will ' , pleased to
discuss them with you.
Sincerely,
~
f
Gegrge
. Smith, Chief
Fuel F cility and Materials Safety
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforc. . ant Combined Inspection
Report Numbers 50-317/79-13 and 50-318/79-10
cc w/encls:
R. M. Douglass, Manager, Quality Assurance
L. B. Rus ell, Chief Engineer
W. Gibson, General Supervisor, Operations QA
R. C. L. Olson, Senior Engineer
K. H. Sebra, Principal Engineer