Forwards IE Insp Repts 50-266/79-18 & 50-301/79-19 on 791126-30 & Notice of Violation
ML19296B224
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/11/1980
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burnstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML19296B225 List:
References
NUDOCS 8002200289
Download: ML19296B224 (2)


See also: IR 05000266/1979018

Text

{{#Wiki_filter:TIC [ UNITED STATES

8 NUCLEAR REGULATORY COMMISSION 3 .,., g ae REGION lli , % [[ o, 799 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS 60137

  • s,.*

JAN 11198a Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN: Mr. Sol Burstein Executive Vice President Power Plants 231 West Michigan Avenue Milwaukee, WI 53201 Gentlemen: This refers to the inspection conducted by Dr. M. J. Oestmann of this office on November 26-30, 1979, of activities at the Point Beach Nuclear Power Plant, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-24 and No. DPR-27 and to the discussion of our findings with Mr. G. Reed and others of your staff at the conclusion of the inspection. The enclosed copy of our inspection report identifies areas examined during the ir.spection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and in- terviews with personnel. During this inspection, certain of your activities appeared to be in non- compliance with NRC requirements, as described in the enclosed Appendix A. This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations. Section 2.201 requires you to submit to this office within twenty days of your receipt of this notice a written statement or explanation in reply, including for each item of noncompliance: (1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved. In accordance with Section 2.790 of tne NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter, the enclosures, and your response to this letter will be placed in the NRC's Public Document Room, except as follows. If the enclosures contain information that you or your contractors believe to be proprietary, you must apply in writing to this office, within twenty days of your receipt of this letter, to withhold such information from public disclosure. The application must include a full statement of the reasons for which the information is considered proprietary, and should be prepared so that proprietary information identified in the ap- plication is contained in an enclosure to the application. U 8002g99 yg

. m Wisconsin Electric Power -2- JAN 111980 - Company We will gladly discuss any questions you have concerning this inspection. Sincerely, f-f WW , A. B. Davis, Chief Fuel Facility and Materials Safety Branch Enclosures: 1. Appendix A, Notice of Violation 2. IE Inspection Reports No. 50-266/79-18 and No. 50-301/79-19 cc w/encls: Mr. G. A. Reed, Plant Manager Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Sandra A. Bast, Lakeshore Citizens for Safe Energy Mr. John J. Duffy, Chief Boiler Inspector, Department of Industry, Labor and Human Relations }}