Forwards IE Inspec Repts 50-424/78-08 & 50-425/78-08 on 781018-20 & Notice of Violation
ML19294A582
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/17/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19294A579 List:
References
NUDOCS 7812280070
Download: ML19294A582 (2)


See also: IR 05000424/1978008

Text

.

.

s

wh

UNITED STATES

h" "' G%

t

NUCLEAR REGULATORY COMMISSION

og

REGION ll

{

c(

g

101 M ARIETT A STREET N W.

"

r

-

[

ATLA *7 4. GEORGIA 30303

p,

.e

(

g,

NOV 171978

'

....'

In Reply Refer To:

RII:WBS

50-424/78-8

50-425/78-8

Georgia Power Company

Attn:

Sk. J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street, N. W.

Atlanta, Georgia

30303

Gentlemen:

This refers to the inspection conducted by Mr. W. B. Swan of this office

on October 18-20, 1978, of activities authorized by NRC Conrtruction

Permit Nos. CPPR-108 and CPPR-109 f or the Alvin W. Vogtle Nuclear Plant

Units 1 and 2 facilities, and to the discussion of our findings held

with Mr. L. L. Gray, Jr. at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your

This ice-

license appear to be in noncompliance with NRC requirements.

and references to pertinent requirements are listed in the Notice of

Violation enclosed herewith as Appendix A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

.;nd (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report _ sill be placed in the SRC's Public Document

From.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you rake a writter.

781228007c)

.

.

NOV 17 ISPs

Georgia Power Company

-2-

application within 20 days to this of fice to withhold such information

from public disclosure.

Any such application must include a full statement

of the reasons on the basis of which it is claimed that the inf ormation

is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document.

If we do not hear f rom you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

/

'

$.

r'.,.

  • /

/'a ,

f >

.

C. E. Murphy, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos.

50-424/78-8 and 50-425/78-8

cc w/ enc 1:

Mr. K. M. Gillespie

Construction Project Fbnager

Vogtle Nuclear Plant

P. O. Box 282

Waynesboro, Georgia 30830

Mr. E. D. Groover

QA Site Supervisor

Vogtle Nuclear Plant

P. O. Box 282