T-0 G6orgia Power Cornpany P30 Peachtree street Post Olhce Box 4545 Atlanta. Georgia 30303 Te:cphono 404 522 6060
g"':N$$s.
O c. s w a. n i,..
Power Supply Engineering and Service.
GeorgiaPower
,; ULL /
Dgembjyj5,1978 United States Nuclear Regulatory Comission Directorate of Inspection and Enforcement
REFERENCE:
Region II IE: II: WBS 101 Marietta Street, N.W.
50-424/78-8 Atlanta, Georgia 30303 50-425/78-8 File: X7BG10 ATTENTION: Mr. C. E. Murphy Gentlemen:
The Georgia Power Company wishes to submit the following information concerning the noncompliance discussed in your inspection report number 50-424/78-8 and 50-425/78-8.
The material noted by the noncompliance has been segregated as required.
Procedures GD-A-01, " Warehouse-Receipt, Storage, and Material Issue",
and GD-T-01, "Noncoformance Control", will be revised to require segregation of nonconforming material when practicable.
Procedure MD-A-01, " Receipt & Storage of Mechanical Equipment," will be
- vised to require inspectors to review the hold tag log to assure that.the hol tag status is revie..ed. prior to releasing equipment.
The Georgia Power Company is confident that the above actions will greatly improve the control of nonconforming items during the receipt and storage of material and equipment.
Full compliance will be achieved by January 15, 1979.
The information contained in the inspection report is not considered to be proprietary.
Very truly ours,
- )N h t
781228o06ct
',i R. W. Sta f -
/
CWH:lb xc:
J. H. Miller, Jr.
C. R. Miles, Jr.
W. E. Ehrensperger D. L. McCrary F. G. Mitchell, Jr.
R. A. Thomas C. F. Whitmer J. A. Bailey R. J. Kelly J. L. Leamon D. E. Dutton H. A. Sindt