ML19291C002
| ML19291C002 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 11/30/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Bryan J UNION ELECTRIC CO. |
| References | |
| NUDOCS 7912190246 | |
| Download: ML19291C002 (1) | |
Text
ra arc p
oq fo, UNITED STATES NUCLEAR REGULATORY COMMISSION e
4,.ga
$ c-REGION 111 o,
[
799 ROOSEVELT ROAD e
GLEN ELLYN, ILLINOIS 60137 Docket No. 50-483 te h a v y 0' Docket No. 50-486 Union Electric Company ATTN:
Mr. John K. Bryan Vice President - Nuclear P. O. Box 149 St. Louis, MO 63166 Gentlemen:
The enclosed IE Bulletin No. 79-27, is forwarded to you for information.
Although no written response is required at this time, these concerns will be addressed as part of the licensing process for your plant.
If you desire additional information regarding this matter, please contact this office.
Sincerely, b
ames G. Keppler
/
Director
Enclosure:
IE Bulletin No. 79-27 cc w/ encl:
Mr. W. H. Weber, Manager, Nuclear Construction Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Region I & IV Ms. K. Drey Mr. Ronald Fluegge, Utility Division, Missouri Public Service Commission
[k 791219 0,2 V6
UNITED STATES SSINS No.:
6820 NUCLEAR REGULATORY COMMISSION Accession No.:
OFFICE OF INSPECTION AND EhTORCEMENT 7910250499 WASHINGTON, D.C.
20555 November 30, 1979 IE Bulletin No. 79-27 LOSS OF NON-CLASS-1-E INSTRUMENTATION AND CONTROL POWER SYSTEM BUS DURI'.G OPERATION Description of Circumstances:
On November 10, 1979, an event occurred at the Oconee Power Station, Unit 3, that resulted in loss of power to a non-class-1-E 120 Vac single phase power panel that supplied power to the Integrated Control System (ICS) and the Non-Nuclear Instrumentation (NNI) System. This loss of power resulted in control system malfunctions and significant loss of information to the control room operator.
Specifically, at 3:16 p.m., with Unit 3 at 100 percent power, the main condensate pumps tripped, apparently as a result of a technician performing maintenance on the hotwell level control system. This led to reduced feedwater flow to the steam generators, which resulted in a reactor trip due to high coolant system pressure and simultaneous turbine trip at 3:16:57 p.m.
At 3:17:15 p.m., the non-class-1-E inverter power supply feeding all power to the integrated control system (which provides proper coordination of the reactor, steam generator feedwater control, and turbine) and to one NNI channel tripped and failed to automatically transfer its loads from the DC power source to the regulated AC power source. The inverter tripped due to blown fuses.
Loss of power to the NNI rendered control room indicators and recorders for the reactor coolant system (except for one wide-range RCS pressure recorder) and most of the secondary plant systems inoperable, causing loss of indication for systems used for decay heat removal and water addition to the reactor vessel and steam generators. Upon loss of power, all valves controlled by the ICS assumed their respective failure positions. The loss of power existed for approximately three minutes, until an operator could reach the equipment room and manually switch the inverter to the regulated AC source.
The above event was discussed in IE Information Notice No. 79-29, issued November 16, 1979.
NUREG 0600 " Investigation into the March 28, 1979 TMI Accident" also discusses TMI LER 78-021-03L whereby the RCS depressurized and Safety Injection occured on loss of a vital bus due to inverter failure.
Actions to Be Taken by Licensees For all power reactor facilities wit DUPLICATE DOCUMENT completion of construction'(North Anr Sequoyah, and Zimmer):
Entire document previously entered into system under:
})
ANO N o.
of pages: