Forwards IE Bulletin 79-27, Loss of Non-Class IE Instrumentation & Control Power Sys Bus During Operation. Written Response Required
ML19291B972
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/30/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
References
NUDOCS 7912190020
Download: ML19291B972 (1)


Text

w Th

,(,on ato,[o, UNITED STATES y )-

g NUCLEAR REGULATORY COMMISSION 3."

.: E REGION I 0,_

  1. [

631 PARK AVENUE

%, ' \\ #

,e KING OF PRUSSIA, PENNSYLVANIA 19406 November 30, 1979 Docket No. 50-213 Connecticut Yankee Atomi'c Power Company ATTN:

Mr. W. G. Counsil Vice President - Nuclear Engireering and Operations P. O. Box 270 Hartford, Connecticut 06101 Ge.ntlemen:

The enclosed IE Bulletin No. 79-27 is forwarded for action. A written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, 27.

~

Boyce H. Grier Director

Enclosures:

1.

IE Bulletin No. 79-27 2.

List of Recently Issued IE Bulletins CONTACT:

D. L. Caphton (215-337-5308) cc w/encls:

P. Graves, Plant Superintendent l'. G. Diedrick, Manager of Quality Assurance J. R. Himmelwright, Licensing Safeguards Engineer 080 2 912 t 90

ENCLOSURE 1 UNITED STATES SSINS No.:

6820 NUCLEAR REGULATORY COMMISSION Accession No.:

OFFICE OF INSPECTION AND ENFORCEMENT 7910250499 WASHINGTON, D.C.

20555 IE Bulletin No. 79-27 Date: November 30, 1979 Page 1 of 3 LOSS OF NON-CLASS-1-E INSTRUMENTATION AND CONTROL POWER SYSTEM BUS DURING OPERATION Description of Circumstances:

On November 10, 1979, an event occurred at the Oconee Power Station, Unit 3, that resulted in loss of power to a non-class-1-E 120 Vac single phase power panel that supplied power to the Integrated Control System (ICS) and the Non-Nuclear Instrumentation (NNI) System.

This loss of power re 11ted in control system malfunctions and significant loss of information co the control room operator.

Specifically, at 3:16 p.m., with Unit 3 at 100 percent power, the main condensate pumps tripped, apparently as a result of a technician performing maintenance on the hotwell level control system.

This led to reduced feedwater flow to the steam generators, which resulted in a reactor trip due to high coolant system pressure and simultaneous turbine trip at 3:16:57 p.m.

At 3:17:15 p.m., the non-class-1-E inverter power supply feeding all power to the integrated control system (which provides proper coordination of the reactor, steam generator feedwater control, and turbine) and to one NNI channel tripped and failed to automatically transfer its loads from the DC power source to the regulated AC power source.

The inverter tripped due to blown fuses.

Loss of power to the NNI rendered control room indicators and recorders for the reactor coolant system (except for one wide-range RCS pressure recorder) and most of the secondary plant systems inoperable, causing loss of indication for systems used for decay heat removal and water addition to the reactor vessel and steam generators.

Upon loss of power, all valves controlled by the ICS assumed their respective failure positions.

The loss of power existed for approximately three minutes, until an operator could reach the equipment room and manually switch the inverter to the regulated AC source.

The above event was discussed in IE Information Notic 16, 1979.

NUREG 0600 " Investigation into the M DUPLICATE DOCUMENT TMI LER 78-021-03L whereby the RCS d on loss of a vital bus due to invert Entire document previous 1y ANO J MO.267'

+