OPERATING DATA REPORT DOCKET NO.
50-369
- Corrected Copy f-DATE 8-13-82 C051PL ET ED llY J. A. Reavis TELEPilONE 704-373-8552 OPE RATING ST.\\1 US N"th FlcGui re #1
- 1. Unit Name:
July 1, 1982
.luly 31, 1982
- 2. Reporting Period:
3 411
- 3. Licensed Thennal Power talW t i
1 220
- 4. Nameplate Ratin;' (Gross 51We1 1 180
$. Desq:n Electrical Ratin;l Net StWe):
- 6. Slasimum Dependable Capacity (Grow SIWE):
- 7. bla'
..um Dependable C.ipaaty INet SlWe):
- 8. If Changes Occur in Capacity Raimp (ltems Number 3 Throu;h 7)Since Last Report.Gnc Reasons:
- 9. Power Lesel To Which Restricted. lf Any (Net Slwe):
- 10. Reasons For Restrictions. If Any:
e.
This blonth Yr..t o.Da t e Cumulativ e 744.0 5 087.0 5 831.0 11 llours in Reportine Period 337.9 3 886.0 3 931.7
- 12. Number Of Iluun Reactor was Critical
- 13. Reactor Resene Shutdown llours 333.5 3 854.8 3 900.5
- 14. Iloon Generator On.Lin,
- 15. Unit Resene Shutdown llours 561 572 7 363 057 7 448 012
- 16. Gross Thermal Energy Generated (SlWil) 192 287 2 514 647 2 543 083
- 17. Gross Electrical Energy Generated (\\lWil) 173 890 2 351 551 7 370 607 IS. Net Electrical Ener;;y Generated (51Wil) 44.8 75.8 66.0
- 19. Unit Senue Factor 44.8 75.8 66.9
- 20. Umt Availabihty Factor 19.8 39.2 34.5
- 21. Unit Capacity Factor (Using NIDC Net) 2 34.5
- 19.8 39 2____
- 22. Umt Capacity Factor (Using DER Net)
- 23. Unit Forced Ouiace Rate 55.2 24.2 33.1
- 24. Shutdowns Scheduled Oser Nest 6 Slonths iType. Date.ami Duration of Each t:
- 25. If Shut Down.\\t f.nd Of Report liriod. Estimaicd Date of Startup:
- 26. Umts in Teu Status (Prmr to Commeraal Operation):
Forecast Achiesed INITI \\ L CI'ITIC A t.lTY c
?
INITI.\\ 1. I 1.lT 1 R IC I 1 Y Cos1Nti.RCI \\ L ol't R A fl0N 8209200 Lf f(
McGUIRE NUCLEAR STATION OPERATING STATUS REPORT 1.
Personnel Exposure:
For the month of July no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2.
The total station liquid release contribution to whole body dose for July has been compared with the Technical Specifications annual value of 3 mrem; the total release f or July was less than 10 percent of this limit.
The total station gaseous release contribution to aey organ dose for July has been compared with the derived Technical Specifications annual value of 15 mrem; the total release for July was less than 10 percent of this limit.