Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6321998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for McGuire Nuclear Station,Unit 1 ML20153B3741998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for McGuire Nuclear Station,Units 1 & 2 ML20237B2381998-07-31031 July 1998 Monthly Operating Repts for July 1998 for McGuire Nuclear Station,Units 1 & 2 ML20153B3931998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for McGuire Nuclear Station,Units 1 & 2 ML20237B2401998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236Q8201998-06-30030 June 1998 Monthly Operating Repts for June 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236F0381998-05-31031 May 1998 Monthly Operating Repts for May 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236Q8251998-05-31031 May 1998 Revised MOR for May 1998 for McGuire Nuclear Station,Units 1 & 2 ML20247K3851998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for McGuire Nuclear Station ML20247L5981998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for McGuire Nuclear Station,Units 1 & 2 ML20217B0681998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for McGuire Nuclear Station,Units 1 & 2 ML20247L6181998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216E3991998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for McGuire Nuclear Station,Units 1 & 2 ML20217B0811998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1997 for McGuire Nuclear Station,Units 1 & 2 ML20202G7531998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216E4111998-01-31031 January 1998 Rev 1 to Monthly Operating Repts for Jan 1998 for McGuire Nuclear Station,Units 1 & 2 ML20202G7741997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for McGuire Nuclear Station,Units 1 & 2 ML20198P2521997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for McGuire Nuclear Station ML20203H6491997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for McGuire Nuclear Station,Units 1 & 2 ML20199D3221997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for McGuire Nuclear Station ML20203H6601997-10-31031 October 1997 Revised Monthly Operating Repts for Oct 1997 for McGuire Nuclear Station,Units 1 & 2 ML20211P9841997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for McGuire Nuclear Station ML20216K1301997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for McGuire Nuclear Station,Units 1 & 2 ML20216K1561997-07-31031 July 1997 Revised Monthly Operating Status Rept for Jul 1997 for McGuire Nuclear Station,Units 1 & 2 ML20210L0691997-07-31031 July 1997 Monthly Operating Repts for July 1997 for MNS ML20149F2421997-06-30030 June 1997 Monthly Operating Repts for June 1997 for McGuire Nuclear Station,Units 1 & 2 ML20140H1171997-05-31031 May 1997 Monthly Operating Repts for May 1997 for McGuire Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20212J1891999-10-0101 October 1999 Safety Evaluation Supporting Exemption from 10CFR54.17(c)re Schedule to Apply for Renewed Operating Licenses ML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217F3661999-09-22022 September 1999 Rev 18 to McGuire Unit 1 Cycle 14 Colr ML20212G1211999-09-22022 September 1999 Safety Evaluation Supporting Amends 188 & 169 to Licenses NPF-9 & NPF-17,respectively ML20212G2671999-09-22022 September 1999 Safety Evaluation Supporting Amends 187 & 168 to Licenses NPF-9 & NPF-17,respectively ML20212D1911999-09-20020 September 1999 SER Accepting Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Closed System Isolation Valves for McGuire Nuclear Station,Units 1 & 2 ML20211P1371999-09-0808 September 1999 Safety Evaluation Supporting Amend 186 to License NPF-9 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211G5261999-08-24024 August 1999 SER Accepting Approval of Second 10-year Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206N3511999-05-11011 May 1999 Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205L2341999-04-0505 April 1999 SFP Criticality Analysis 05000369/LER-1999-001-04, :on 990306,TS SR for Ice Condenser Lower Inlet Doors Was Not Met.Caused by Failure to Recognize That Recorded Valve Was Outside Acceptance Criteria.Mgt Reinforced Expectations for Procedure Performance & Review1999-03-31031 March 1999
- on 990306,TS SR for Ice Condenser Lower Inlet Doors Was Not Met.Caused by Failure to Recognize That Recorded Valve Was Outside Acceptance Criteria.Mgt Reinforced Expectations for Procedure Performance & Review
ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205C4171999-03-25025 March 1999 Special Rept 99-02:on 801027,Commission Approved for publication,10CFR50.48 & 10CFR50 App R Delineating Certain Fire Protection Provisions for Nuclear Power Plants Licensed to Operate Prior to 790101.Team Draft Findings Reviewed ML20207K2051999-03-0505 March 1999 Special Rept 99-01:on 990128,DG Tripped After 2 H of Operation During Loaded Operation for Monthly Test.Caused by Several Components That Were Degraded or Had Intermittent Problems.Parts Were Replaced & Initial Run Was Performed ML15112A4101999-03-0404 March 1999 SER Approving Relief Request 98-GO-007 from ASME Section XI Requirements for McGuire Nuclear Station,Units 1 & 2, Catawba Nuclear Station,Units 1 & 2 & Oconee Nuclear Station,Units 1,2 & 3 ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20198A4481998-12-11011 December 1998 Safety Evaluation Concluding That for Relief Request 97-004, Parts 1 & 2,ASME Code Exam Requirements Are Impractical. Request for Relief & Alternative Imposed,Granted ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E9651998-11-24024 November 1998 Rev 1 to ATI-98-012-T005, DPC Evaluation of McGuire Unit 1 Surveillance Weld Data Credibility ML20196D4171998-11-24024 November 1998 Special Rept 98-02:on 981112,failure to Implement Fire Watches in Rooms Containing Inoperable Fire Barrier Penetrations,Was Determined.Repair of Affected Fire Barriers in Progress ML20196G0581998-11-0606 November 1998 Rev 17 to COLR Cycle 13 for McGuire Unit 1 ML20196G0761998-11-0606 November 1998 Rev 15 to COLR Cycle 12 for McGuire Unit 2 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154B7991998-09-28028 September 1998 Safety Evaluation Supporting Amends 183 & 165 to Licenses NPF-09 & NPF-17,respectively ML20153F6401998-09-22022 September 1998 Safety Evaluation Supporting Amends 182 & 164 to Licenses NPF-9 & NPF-17,respectively 1999-09-08
[Table view] |
Text
.,
OPERATING DATA REPORT 50-369 DOCKET NO.
DAlt 9-15-e2 COSIPLET ED ltY J.
A.
Reavis T ELEPilONE 7nt_171-R552 OPERATING ST \\1US Note >
McGuire #1
- 1. Unit Name:
Au9ust 1, 1982-August 31, 1982
- 2. Reporting Period:
- 3. Licensed Thennal Power tN! Wit 3411 1220
- 1. Nameplate Rating (Grow SlWe).
1180
- 5. Design Elecuical Ratin tNet SlWee
- 6. Slasimum Dependable Capacity (Grow StWe):
7 blasimum Dependahte Capaetty INet alw ):
e S. If Changes Occur in Capacity Ratings (liems Number 3 Through 7)Since Last Report.Gise Reasons:
None None
- 9. Power Lesel To Which Restricted. lf Any (Net SlWe):
- 10. Reasons f or Restrictions. It Any:
This Alonth Yr..to.Date Cumulatise 11, ilours in Reporting Period 744.0 5831.0 6575.0 732.2 4618.3 4663.9
- 12. Number Of liours Reactor Wm Critical 1.1. Reactor Resene Shutdown ilours
- 14. llours Generator On.Line 730.1 4584.9 4630.6
- 15. Unii Resene shu:down ilours
- 16. Gron Thermal Energy Generated OlWil) 1 467 549 8 830 606 8 916 661
- 17. Gross Electrical Energy Generated Olwil) 504 352 3 018 999 3 047 435 IS. Net Electrical Energy Generated ($1Wil) 475 047 2 826 598 2 845 654 98.1 78.6 70.4
- 19. Unit Senice Faetor 98.1 78.6
/0.4
- 20. Umt Asailabilny Factor 54.1 41.I db./
- 21. Unit Capacity Factor llhine stDC Neti 54.1 41.1 36.7
- 22. thut Capacity Factor (Using DLR Net) 1.9 21.4 29.6
- 23. Umt Forced Outace Rate
- 24. Shutdowns Scheduled Oser Nest 6 \\lonths tType. Date.and Duration of Lach t Steam Generator Ipspection/ Modification - October IS, 1982 - 11 weeks
- 25. If Shut Dow n.\\t End Of Report l'irnid. Estunated Daic of Startup:
- 26. Units in Tes Statu> (Prnir to Commercul OperationJ:
Forecast Achiesed INITI \\ L CRITIC.\\ Lil'Y INITI \\l. I LL Cl RICIIY CO\\lNil.RCI \\L Ort.R A flON 8209200 3 77
e DOCKET NO. 50-369 UNIT McGuire 1 DATE 9-15-8:'
AVERAGE D AILY UNIT POWER LEVEL MONTil August 1982 AVERAGE D AILY l'OWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe.ne t )
DAY (Mwe.ne t) 557 17 851 1
2 559 1g pg 844 557 gg 3
836 20 4
534 556 21 6
553 22 538 0
746 556 23 7
845 24 8
'of 188 25 0
855 26 10 837 547 27 11 548 28 534 12 536 546 29 13 754 540 30 14 855 538 31 15 642 16 DAILY UNIT POWER LEYEL FOR\\1 INSTRl:CTIONS On this form, hst tht average daily omt power lesel in MWe net for each day in the reporting n.onth.
Compute to the nearest w note megawatt.
These figures will i e used to plot a graph tot each reporting rnonth. Note that by usint, maximum there may be os easions when the daily dependable capacity for the net electrical rattmt of the umt average power leve' esteeds the It>O <- hoe tor the restritted power lesel hoe). In such c.ises, the average daily unit power output sheet should be footnoted to t splain the appaient anomaly.
~
sL d
i 5
d G.
e v 5 1
s s e,
IR a 8 oiz%
u.
e i0e U
ap th e
R 3
l 5 r r 2 ci t
N 9
7 i
e i
g r
p i
8
. 3 tt w e
6 n
At ut u /
e 5A i
T a ua e
3
._ 4 s
sd e
G a
t I o r
s nt nF c
1 c /
0 i m t
ongsr oa e) m 0
M 9 J 7
i D
- r. R o
c aa o
f o nd u 5
tc i no e
e we t p i
ut L-e S
I at m
rt eeh er s
t r
i n
s ru eabk o1 t
m s n 't o.EEyE tc e
(
e9 ep wr n o t
a r
r e
se5 I
ti te s
MT N
r tor ef n w
oe r
l o
S w2 r ep I
f N
u i
- a A A woo ot pp T N D lO ron c D
e o
i P n o
Gah e
Ei Co l
T P i R pst a
eh ti epSR t
E mt.
f.
t i i ll 5 s
)
i K. NI E E i
iit b r yt b
L eAn
% sd oo 7 y e n1 u
t ws
!nP tn c. 1 N
(
L s
e 0 yn ro a
6 O U P E u
v 5l o t c od u
x r
o i. :
D M T r.
e ssg I f iI r
ac n
t 0
I C
P t n or
)
yu i
O h aA C
aar C o d0 o
t e3 Td d
4 5
kh e grt f c s(
nea oa ay.egz eui ih r e
et l wol d t e sr rr e ri l r n s
civ nht Ioue oA nh e ot u f g L1 I t l I
S N
m O
K I
a )n I
I IC R
C
. i l
2
,?'
X B
X mci l
.h5EU C
8
~
a E
T E
aSl 9
U cp r
D R
T ci x T
1 C
St l
aE I
l E
l l m (r a a H
t d uu oe s
i a a u!
n nnt R.
u o7U lte4 M A. 0 t
1 t
g l
w u
j3v i B
C B
C E
C M! 2 I. 4 O
A l'
D N
1 T
A N
1 O
e r
S N
M e tn i s
r w
T n e o e
v p o
R c E e t
D O
U R
un P.
t 1
I a
U n
H R
i S
m T
a I
5 3gC 1
x N
5'g5 n
e
)
)
U s
3 n
in j3 -
lp c
lp a
e a
x nL s
i L
o i
( t uT ic&;
ro) s t
I 3j2
(
e c
I 1
1 r
e I
1 1
t n
i m e i.i lir s
r n
a o e
F RivI lp ai a
8 e
yT a la r
t EgE c
8 tnn r
t nx r
g ea or o l' 3~
y 3
in i at nnt o smi
(
ta r 1
el pt ei ai nin u n n
e meh o uif gc qa e e pd pt se' 41 R R O A. O. O!
a
,iH l
- ~-
F F
F RAl CDl G!
l I
1 9
6 0
0 1
te 8
8 8
a 0
0 0
D 2
2 2
!t 8
8 8
le d u cd e e
- h P
P o
c l' S
)
1 5
2 7
1 1
1
- 1 S 7
/
1 I
C
P.C N T H l.Y R Kg'me. g". i n'n.w r 1 O N. F..r.E.;f
-El r
1.
Facility name:
McGuire Unit _ 1 2.
Scheduled next refueling rhutdevn:
January, 1984 3.
Scheduled restart following refueling:
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amend =cnt? N/A If yes, what will these be?
If no, han reload design and core configuration been reviewed by Safety Revies Com:ti t t e e regarding unreviewed safety questions?
N/A If no, when is review s ch e d ul e d ? __,, M / A 5.
Scheduled date(s) for submitting proposed licensing action and supporting in f o rma tion :
N/A 6.
Important licensing considerations (new or different design or supplier,
unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
N/A 7.
tiu:ub e r o f fuel assemblies (a) in the core:
193 (b) in the spent fuel pool; 27 3.
Present licensed feel pool capacity.
500 Size of requested or planned increase:
9.
Projected date of last refueling which can be acceemodated by present licensed capacity:
DUF2 PCWER CCKPA:rt Date:
September 15. 1982 Name of Contact; J. A.
Reavis
DOCKET NO: 50-369 UNIT: McGuire Unit 1 DATE:
9-15-82 NARRATIVE
SUMMARY
Month: August, 1982 McGuire 1 entered the month limited to 50% power until further analysis of the steam generator tube condition could be completed.
August 9 the unit tripped when the loss of control power to ITA buss caused the 1A reactor coolant pump to trip.
The unit returned to service later the same day.
August 16 power was increased to 75%.
Up to 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> are permitted at this level prior to further inspection of the steam generator tubes.
This time is being utilized on weekdays with weekends at 50%.
The unit finished the month at 75% power.
.