ML19289B221

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Mar 1982
ML19289B221
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 04/15/1982
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML19289B217 List:
References
NUDOCS 8209200402
Download: ML19289B221 (1)


Text

-

- ~

m OPERATING DAT A REPORT c.

50-369 DOCKET NO.

  • Corrected Copy DATE

__4. 8 2 COMPLET E D llY J.A. Reavis T E LEPilON1' 704-373-8552 OPERATING ST \\TUS Note 3 McGuire #1

1. Unit Name:

March 1, 1982-March 31, 1982

2. Reporting Period.
3. Licensed Thennal Power iMh t t 3 411

~

1 220

.t. Nameplate Rating (Grow MWe).

1 180

5. Desgn Electrical Rating tNet MWet
6. Masimum Dependable Capacity tGrms Mw ):

e

7. Masimuin Dependable Cap.icity (Net MN.

S. If Changes Occur it: Capacity Ratings titems Number 3 Through 7)Since Last Report.Gise deasons:

9. Power Lesel To Which Restricted,if Any (Net Mw ):

e

10. Reasons For Restrictions. If Any:

This Month Yr..to Date Cumulatise 2~

744.0 2 160.0 2 904.0

11. Ilours in Reporting Period 315.9 1 583.0 1 628.7
12. Number Of flours Reactor % Critical
13. Reactor Resene Shutdown flours
14. Ilours Generator On Line 312.8 1 567.5 1 613.2 _
15. Unit Resene Shutdown hwn
16. Grou Thermal Energy Generated ($1WH) 530 357 2 858 574 2 943 529 176 700 959 591 988 027 11 Gross Electrical Energy Generated (MWil) 160 576 893 029 912 085 IS. Net Electrical Energy Generated (MWil) 42.0 72.6 55.6
19. Unit Semce Factor
20. Unit Asailability f actor 42.0 72.6 55.6 21, Unit Capacity Factor (Usine MDC Net) in 3 35.0 26.6
  • 18.3 35.0 pg g
22. Umt Capacity Factor (Using DER Net) 58.0 27.4 44.5
23. Unit Forced Outace Rate
24. Shutdowns Scheduled Oser Nest 6 \\lonths (Type. Date,and Duration of racht.
25. If Shut Down \\t End Of Report Pernid. Estim.ited Date of St:rtup-
26. Units in Tesi Status (Prmr to Commercial Operation):

Forecast Achiesed

(<'J INITl \\ L CRIT'C.\\ Lil Y INilI \\ L 1 Lt C 1 RIClIY COMMI.RCI.\\ L OP!'.R.\\ fl0N 8209 20 0 yog tofu,