ML19289B223

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for June 1982
ML19289B223
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 07/15/1982
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML19289B217 List:
References
NUDOCS 8209200409
Download: ML19289B223 (1)


Text

.

OPERATING DATA REPORT DOCKET NO. 50-369 h

DATE 7-15-82 Corrected Copy C051PLETED BY J. A. Reavis TELEPHONE 204-373-8552 OPERATING ST ATUS N"l')

McGuire Ill

1. Unit Name:

Tune 1. 1982 - June 30, 1982

2. Reporting Period:

3 411

3. Licensed Thennal Pow er t'.lb t t 1 220
4. Nameplate Rating (Gross \\lWe):

1 180

5. Design Electrical Rating (Net.stWe t
6. Slaximum Dependable Capacity (Grow SlWe):
7. Masimum Dependable Capacity (Net Slw l:

e S. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report.Gise Reasons:

9. Pouer Level To which P.,cricted. lf Any (Net MWe)
10. Reasons For Restrictions. If Any:

L This Month Yr..to Date Cumulative 720.0 4 343.0 5 087.0

11. Hours in Reporting Perind 516.0 3 548.2 3_593.9
12. Number Of Hours Reactor Was Critical
13. Reactor Resene Shutdown llours
14. Hours Generator On.Line 514.3 3 521.3 3 567.0
15. Unit Resene Shutdown floors 1 266 005 6 801 48T 6 886 440
16. Gross Thermal Energy Generated Dlwll)
17. Gross Electrical Energy Generated plWH) 444 5 M _,,,,,,

2 322 360 2 350 796 420 468 2 177 661 2 196 717 IS. Net Electrical Energy Generated (MWil) 71.4 81.1 70.1

19. Unit Service Factor
20. Unit Availability Factor 71.4 81.1 70.1 _

49.5 42.5 36.6

21. Unit Capacity Factor (Using.\\lDC Net t
  • 49.5 49 8 36.6
22. Umt Capacity Factor (Usmg DER Net)
23. Unit Forced Outace Rate 28.6 18.9 29.9
24. Shutdowns Scheduled Oser Next 6 \\lm.ths (Type. Date.and Dur.ition of Facht
25. If Shui l)own At End Of Report l'ermd. Estimated Date of Startup:
26. Units in Test Status iPrmr to Conunercul Operation):

Forecast Achiesed INITI \\ L CRITIC A Ll1T h..,'M INITI \\ L 1 LIT 1 RICIiY Cost.sti.RCI \\ L Ol'l.R A flON co m i 8209200 cfc 7