a
km nrGO
UNITED STATES
NUCLEAR REGUI.ATORY COMMISSION
,g g
,
g
R EGION 11
%
g
g
D7
+-
<r
101 M ARIETTA STREET, N.W.
ATLANTA. GEORGIA 30303
o
%*****/
FEB 151979
In Reply Refer To:
RII:MDH
50-369/79-5
50-370/79-3
Duke Power Company
Attn:
Mr. William O. Parker, Jr.
Vice President, Steam Production
Post Office Box 33189
422 South Church Street
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by Mr. M. D. Hunt of this office
on January 16-19, 1979 of activities authorized by NRC License Nos.
CPPR-83 and CPPR-84 for the McGuire Nuclear Station facility, Units 1
and 2, and to the discussion of our findings held with Mr. J. C. Rogers
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously identi-
fied enforcement matters and unresolved items.
The status of these
items is discussed in the enclosed report.
One new unresolved item resulted from this inspection and is discussed
in the enclosed report. This item will be examined during subsequent
inspections.
During the inspection it was found that certain activities under your
license appear to be in noncompliance with NRC requirements.
This
item and references to pertinent requirements are listed in the Notice
of Violation enclosed herewith as Appendix A.
Corrective actions to
prevent recurrence were completed prior to the conclusion of this inspec-
tion; therefore, a reply is not requested.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10,. Code of Federal Regulations, a copy of this letter and
th'e enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contrac-
tor) believe to be proprietary, it is necessary that you make a written
agiplication within 20 days to this office to withhold such information
from public disclosure. Any such application must include a full statement
790326O//O
.
FEB 151979
,
Duke Power Company
-2-
of the reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
Shculd you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
.
_
hi
f'
Charles E. Murphy', Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-369/79-5
and 50-370/79-3
cc w/ enclosures:
Mr. M. D. McIntosh, Plant Manager
McGuire Nuclear Station
Post Office Box 488
Cornelius, North Carolina 28031
Mr. J. C. Rogers, Project Manager
McGuire Nuclear Station
Post Office Box 33189
Charlotte, North Carolina 28242
-