05000302/LER-1979-010-03, /03L-0 on 790125:during Routine Operations,Air Handling Fan Failed to Start.Caused by Faulty Overcurrent Timing Relay

From kanterella
(Redirected from ML19274D851)
Jump to navigation Jump to search
/03L-0 on 790125:during Routine Operations,Air Handling Fan Failed to Start.Caused by Faulty Overcurrent Timing Relay
ML19274D851
Person / Time
Site: Crystal River 
Issue date: 02/15/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19274D849 List:
References
LER-79-010-03L, LER-79-10-3L, NUDOCS 7902260457
Download: ML19274D851 (2)


LER-1979-010, /03L-0 on 790125:during Routine Operations,Air Handling Fan Failed to Start.Caused by Faulty Overcurrent Timing Relay
Event date:
Report date:
3021979010R03 - NRC Website

text

.

NRC FORM 366 U. 5. NUCLEAR REGULATORY COMMISS3ON (7.77)

LICENSEE EVENT REPORT EXHIBIT A i

CcNTRotstoCiel l I 1 1 I l@

<etEAss rRiNT oR TveE Att REeviRCo lNFCRMATION)

I 6

g i llgl 0;gl4;1l1l lF I LI q R) Pi 3 Ig-l 0101-t 010l 0 l 0l0 : ;0 l lg i

o i

a,

vCassescoat i.

s ocass* N vaaa

.5 a

m ssaTva a si w w CovT

,"o3,"j @! 0 l 510 t -l 0 l 3 I0 l 2 ClO I11215 t 7 i oI@l oi 211 I i;l 71 q l@

2 io i

J 6J

.I OOC A ET Nwygga w

69 tvt%T C ATg 1.

75 mg.Omigarg 30 EVEN.' OESCRIPTION AND PROSA8LE CONSEcutNCE3 h 1 At 1620, during routine operations, air handling fan (AHF-14C) failed to i

o 2

i start.

'rhis created an event contrary to Technical Specification 3. 7.8.1.

3 3

i ntered 7 Day Action Statement.

Investigation revealed that the overcur-1 E

ois Irent timine relav had failed. M,intenance restored onershility.

No nffecd ron public health and safety as redundant fans were operable.

t oa 0l7 l

I Ql4 t l l

80 7

8 9 SvlT1st CAL $t C&aSt COv8 VAL t CCCE COOE SLBCCCI CCvaQNEN? CODE

$U3CCc3 sveCCOE I At ^ 16 L,,E_J@ LA_j @ IR I E I Ll A l Y I Xl@ [D_j@ (lj @

E O{9 a

n

$10U E N T1 & L.

OCCU4 1%C1 at*0m?

  • E. I:lCN

,EVENTvtAm at*CmT NO.

C008 7pE No

@ ;gge no 1 7 I 91

(--J l 0111 01 If_]

l o l 31 W

(,--J Loj tg; _v u

v n

n n

2 u

si men n N ACT ON ON 8 sf T

- OV*$

5 6,

8C.

5 5PLi v.

(2J@l,xJ@

L,,ZJ@

[2. JO,l o ' ol o i o l (2, J @

L., J@

L.L, J@ l clo I slo l@

u CAUSE CESCRIPTION AND CCRREC flVE *CTIONS h i The cause of tihis event is attributed to a faulty overcurrent tdmec r o l,v. !

i e

g 0perability was restored af ter inspectior and resettine the overcurrent

,, - 1relav. Further action to be taken hv val," -,4nenn,nco evnn,-

a nrnrnn-1 l tive maintenance program is being implemented to prrrent recurrence.

l I

I S 9 30

's'TDEs" ov-s= status @ Es7:Nv' s >> e.

sc:s tav :ssC='av cN [E_J @ l 1101 01@l N/A l W @l Goerator Observation l

iis

'.Ck, r,v c Lisi T..C1,mT @ "

m.T. s....a

.. a., @, =... a.t,z_J@l L, Z_J N/A I

I N/A i

> le y ;j i0l di- @ [..,u_gj@l N/A l

....oN m....

en..v eN @

suv j0l

..., essa'.wiu ao

nc....es@

N.v,..

l oi nt n l@l N/A i

it" e5,:8c;a^t;',4;,o ^c e @

L,Z_]@l N/A l

t a

u F T 1 M, RGlC..,,,,@

~#c use oc I

. - N/A _

I'ittiieii l l y

u..E c...E.2R ER _.

- 6 J. % ~

e-esE __{904)795-6486 ggd6 (SEE ATTAGED SUPPLEMENTARY INFORMATION SHEET)

SUPPLEMENIARY INFORMATION Report No. 50-302/79 - 010/03L-0 Facility: Crystal River Unit #3 Report Date: 15 February 1979 Occurrence Date:

25 January 1979 Identification of Occurrence: One pair of Auxiliary Building exhaust fans operable contrary to Technical Specification 3.7.8.1.

Conditions Prior to Occurrence: Mode 1 power operation (1007.)

Description of Occurrence: At 1620, air handling fan (AHF-14C) failed to start.

Subsequent investigation by an electrician revealed that the overcurrent timing relay had " hung up".

The relay was inspected, reset and the fan returned tc operable status at 1800 on 26 January 1979.

Designation of Apparent Cause: The probable cause of the relay failure is attributed to foreign particles restricting the timing relay disc.

Analysis of Occurrence: There was no hczard to the plant or general public as redundant fans AHF-14 B & D were operable.

Corrective Action

Further investigation by the relay maintenance section will follow. A preventive maintenance program for switchgear relays is being implemented to act on a two year cycle.

Failure Data: Eight previous occurrences reported. First occurrence of this type for AHF-14C.