B&W Site Inspector Daily Rept on 790407.Plant Status:Reactor Operating at 75% Power W/All Emergency Safety Features in Svc.Refueling Outage Scheduled for 790423
ML19270H385
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/07/1979
From: Mchenry T, Quick D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19270H381 List:
References
FOIA-79-98 NUDOCS 7906290302
Download: ML19270H385 (2)


Text

..

.,,enein-233,jg g

I'.s pi. *1 of 2

.Vv:;5; or r <;PECIiOS A'O E.':FF';C FMP. !

r s.w :; Tr.

. m :cy04 :. ::i,v...

n,. t.

4/7/79 site,_ Crystal River 7

..-.r(<.

Quick McHenry

eneral Plant statu.:

Operating 75%

9 1.

Review o# S imi.lse r Tr a n s t..n t.w

, i t.'r

T'! Ti-03Ai:

No entry Revies; and P.evision of Operatin,, and ?t.1 int.inani - Procedures (Items,3, 4, 5, 7, B,c, 10 of IES79-05A)-

e No entry I.e v is'v at'd '.= p Is. tit.:t! f o i.I Cl.ir:;,e. I n '. n.. n t :' !wo'ailon i

(Irem 6 JEB 79-05'A).

No entry 2325 234 11 m.! p ! titr /proi e< lures 1

Trainin; nf / hnt P e r. war.ne l ( T t em '.

changes):

No entry

. g 9

O b

79062903

  • 1 ri d' 5.' 2 Att.<hm.nt )

l'ig e

..d ?

~8

'" % P.'.

1F NRC iSca r.s l o.4.iCTn'! TY DPR t w. !'i:et ! r,.28 a.m. 4 /6 to 8 a.m. 4/7" ti ris 2.d iin.se. give..: bcr i n,$,.. ialen e N. nn t i l ran t (A

l' m 4 i t vie:.

l..

l eff re.

i.len'. i fy.;h. rr s en wh i. b ac t f c i t y w.

ilorior n.

r 2 4 ho..r t. )

a.

Observed operator oriefing and removing from service at 3:25 p.m, 4/6 the 3B reactor coolant pump because of a leaking seal. Reviewed records of the transient that occurred at 4:15 p.:..

when the turbige load limiter was reset.

r D. No procedures reviewed during this period (operating procedtires have i

been reviewed during the past week. About 90% of the emergency procedures have been reviewed. Operating procedures are good.

Generally emergency procedures are inadequate - assume transient will continue without equipment malfunction. Skimpy description of operator aerions and lack reference for subsequent accions.

-c.

An engineering change has been initiated to provide auto isolation on high radiation for containment sump and drain tank pump out lines. Interim instructions issued to manually isolate if there is a large leak on high radiation in containment.

d.

Licensee has completed training of personnel on procedure revisions made to meet IEB 79-05A items 1,4, a d 11.

3.

STATUTv OF INSPECTOR DISCUSSIONS WIT.! Pl. ANT PERSONNEL:

The RT has briefed the 3 on-duty sh f ts (27 operators).

The 2 off-duty shifts will be briefed 4/9-10 prior to startine i.mrir.

4 DESCRIPTION OF GENERAL PLANT STATUS Ci.e., operating power level, planned changes, scheduled outages, ESF out of service, major maintenance, reportable occurrences, etc.)

Plant operating 75% power (one RCS pump shutdown).

All emergency safety features in service, no cajor maintenance scheduled.

refueling outage scheduled to begin 4/23.