4/7/79 site,_ Crystal River 7
..-.r(<.
Quick McHenry
- eneral Plant statu.:
Operating 75%
9 1.
Review o# S imi.lse r Tr a n s t..n t.w
, i t.'r
- T'! Ti-03Ai:
No entry Revies; and P.evision of Operatin,, and ?t.1 int.inani - Procedures (Items,3, 4, 5, 7, B,c, 10 of IES79-05A)-
e No entry I.e v is'v at'd '.= p Is. tit.:t! f o i.I Cl.ir:;,e. I n '. n.. n t :' !wo'ailon i
(Irem 6 JEB 79-05'A).
No entry 2325 234 11 m.! p ! titr /proi e< lures 1
Trainin; nf / hnt P e r. war.ne l ( T t em '.
changes):
No entry
. g 9
O b
79062903
- 1 ri d' 5.' 2 Att.<hm.nt )
l'ig e
..d ?
~8
'" % P.'.
1F NRC iSca r.s l o.4.iCTn'! TY DPR t w. !'i:et ! r,.28 a.m. 4 /6 to 8 a.m. 4/7" ti ris 2.d iin.se. give..: bcr i n,$,.. ialen e N. nn t i l ran t (A
l' m 4 i t vie:.
l..
l eff re.
i.len'. i fy.;h. rr s en wh i. b ac t f c i t y w.
ilorior n.
r 2 4 ho..r t. )
a.
Observed operator oriefing and removing from service at 3:25 p.m, 4/6 the 3B reactor coolant pump because of a leaking seal. Reviewed records of the transient that occurred at 4:15 p.:..
when the turbige load limiter was reset.
r D. No procedures reviewed during this period (operating procedtires have i
been reviewed during the past week. About 90% of the emergency procedures have been reviewed. Operating procedures are good.
Generally emergency procedures are inadequate - assume transient will continue without equipment malfunction. Skimpy description of operator aerions and lack reference for subsequent accions.
-c.
An engineering change has been initiated to provide auto isolation on high radiation for containment sump and drain tank pump out lines. Interim instructions issued to manually isolate if there is a large leak on high radiation in containment.
d.
Licensee has completed training of personnel on procedure revisions made to meet IEB 79-05A items 1,4, a d 11.
3.
STATUTv OF INSPECTOR DISCUSSIONS WIT.! Pl. ANT PERSONNEL:
The RT has briefed the 3 on-duty sh f ts (27 operators).
The 2 off-duty shifts will be briefed 4/9-10 prior to startine i.mrir.
4 DESCRIPTION OF GENERAL PLANT STATUS Ci.e., operating power level, planned changes, scheduled outages, ESF out of service, major maintenance, reportable occurrences, etc.)
Plant operating 75% power (one RCS pump shutdown).
All emergency safety features in service, no cajor maintenance scheduled.
refueling outage scheduled to begin 4/23.