ML19270H380

From kanterella
Jump to navigation Jump to search
Summary of B&W Plant Insp for 790407,w/IE Site Inspector Daily Repts of B&W Reactors for 790407
ML19270H380
Person / Time
Issue date: 04/07/1979
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
Shared Package
ML19270H381 List:
References
FOIA-79-98 TI-2595-2, NUDOCS 7906290254
Download: ML19270H380 (2)


Text

3,

d.

SUMMARY

OF B&W PLANT INSPECTIONS

~2 7f

, yt >%;g e if 77 R:1 TMI-I - Shutdown R:2 Crystal River -

Operating 75%, 3 pumps -

Experienced transient due to load limiter control to 0 at 4:15 April 6 from 60% power Rx pressure to 2250 max, 1975 min stable at 2100 all 1 min Pressurizer RV operated Secondary RV operated following control valve closure All ESF operated properly Operators functioned properly All operators on shift at time of transient had just been instructed on IEB 79-05A Oconee U-1, 100%, U-2 90%, U-3 100%

U-2 has condensor leak All three operating shifts instructed on IEB 79-05A R:III Davis Besse - Shutdown Startupnoeafierthan4/14 NRC instructions to operators scheduled in conjuction w/ licensee training on TMI Accident next week preceding resumption of operations.

R:IV Arkansas - Refuel Shutdown 2325 225 b f M I/hrd 7 9 - 7 7 906 2 g(p5

P.: V Rancho Seco

=

Operating 100%

Major student demonstration expected 4/8 Some operators have been dispatched to simulator to undergo training on TMI accident Inspector verified ESF operability Containment isolation occurs at 1600 psi; 4 psi no transfer of liquid w/o operator action All licensed operators available, (13/22) have received NRC instruction on Bulletin 79-05A, the remainder will be instructed before return to shift operation.

R:II Misc.

McGuire - Safe Energy Alliance demonstration expected at 3:00 pm 4/8/79; licensee, security, alerted police

& e/ocum t.Paa L seco Oa. /7 fepd

2. p.. s pa s.re Da:/y spe,t ffA 2325 226 9N p

eo ep

.me

.