Forwards IE Insp Repts 50-321/79-03 & 50-366/79-03 on 790108-12 & Notice of Violation
ML19270F810
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/15/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19270F803 List:
References
NUDOCS 7903270553
Download: ML19270F810 (2)


See also: IR 05000321/1979003

Text

'

,.

.

  1. ptgnaro ,'o,,

NUCtEAR REGULATORY COMMISSION

u

UNITED STATES

[

o

REGION 11

5

.c

101 MARIETTA STREET.N.W.

ATLANTA. GEORGIA 30303

%*****/

FEB 151979

In Reply Refer To:

RII:FSC

50-321/79-03

50-366/79-03

Georgia Power Company

ATTN:

Mr. J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street, N.W.

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by Mr. F. S. Cantrell of this office

on January 8-12, 1979, of activities authorized by NRC License Nos. DPR-57

and NPF-5 for the E. I. Hatch facility, Units 1 and 2, and to tae discussion

of our findings held with Mr. M. Maury on January 11 and 12,1979.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative ocorda, interviews

with personnel, and observations by the inspectors.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is dis-

cussed in the enclosed report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix i. This notice is sent to you pursuant to the provisions of

Section 2.201 of ;.he NRC's " Rules of Practice", Part 2, Title 10, Code of

Federal Regulatior.s. Section 2.201 requires you to submit to this office,

within 20 days of your receipt of this notice, a written statement or expla-

nation in reply including:

(1) corrective steps which have been taken by

you, and the results achieved; (2) corrective steps which will be taken to

avoid further noncompliance; and (3) the date when full compliance will be

achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this of fice to withhold such information from public disclosure. Any

7903270613

.

FEB 15 97;

.

Georgia Power Company

-2-

such application must include a full statement of the reasons on th basis of

which it is claimed that the information is proprietary, and should L prepared

so that proprietary information identified in the opplication is contained in

a separate part of the document. If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

W

(yv

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

E closures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-321/79-03

and 50-366/79-03

cc w/ encl:

Mr. M. Manry, Plant Manager

Plant E. I. Hatch

Post Office Box 442

Baxley, Georgia 31513

Mr. C. E. Belflower

Site QA Supervisor

Plant E. I, Hatch

Post Office Box 442

Baxley, Georgia 31513