ML19270F808

From kanterella
Jump to navigation Jump to search
Responds to NRC 790215 Ltr Re Violations Noted in IE Insp Rept 50-321/79-03 & 50-366/79-03.Corrective Actions:Revision of Plant Procedure to Require Proper Notification of Personnel Re Drywell Sump Leakage
ML19270F808
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/07/1979
From: Staffa R
GEORGIA POWER CO.
To: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19270F803 List:
References
NUDOCS 7903270548
Download: ML19270F808 (1)


Text

e 1

Geo,g a Power Company A

230 Peachtree Street Post Off.ce Bo= 4545 --3e.,-

At:anta Georg a 30303 .

Te:ephone 404 522 6060 n

Power Supply Engineering and Services Of)f.Nd h A]*,}{ g ,

March 7, 1979 ,,,. , f, , , ,, ,

United States Nuclear Regulatory Co= mission Office of Inspection and Enforcement

REFERENCE:

Region II - Suite 3100 P.II: FSC 101 Marietta Street 50-321/79-3 Atlanta, Georgia 30303 50-366/79-3 ATTENTION: Mr. R. C. Lewis Gentlemen:

The Georgia Power Company offers the following information ir response to your letter of February 15, 1979, describing an apparent noncompliance with NRC requirements noted during your January 11 - 12, 1979, inspection of the Hatch Nuclear Plant.

Infraction (Part A) - Plant Procedure UNP-1-1050 has been revised so as to require that Plant Management be informed in the event that unidentified leakage to the drywell sump doubles or increases by 2 gpm. Operators have been instructed to follow procedures to ensure that the leak rate is recalculated within four hours after the unidentified leak rate is calculated to be greater than 1 gpm. HNP-1-1050 was revised and approved February 19, 1979.

(Part B) - Plant Procedure HNP-1-1500 has been revised to specify the proper equipment to be used when venting the drywell. Plant operating per-sonnel have been instructed that full compliance with procedures is required.

If a pro : dure is found to be inadequate, it shall be revised by a temporary or pemanent procedure revision before use. HNP-1-1500 was revised and approved February 14, 1979.

The inspection report contains no information which is believed to be prcprietary.

Very truly yours,

. l i

.I , Ih *

R. W. afy 9 Mana r of Quality Assurance kL JAB /bg 7903270548 243f8 O