Forwards IE Insp Repts 50-491/79-18,50-492/79-18 & 50-493/79-18 on 791009-12 & Notice of Violation
ML19269F489
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 10/31/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19269F481 List:
References
NUDOCS 7912210152
Download: ML19269F489 (2)


See also: IR 05000491/1979018

Text

.

.

e

e arou

o

UNITED STATES

!

T

NUCLEAR REGULATORY COMMISSION

q

g

-

.c

REGION 11

'

I

o,

101 MARIETTA ST., N.W., SUITE 3100

%./ -v p*'

ATLANTA, GEORGIA 30303

.....

OCT 3 I 1979

In Reply Refer To:

RII:PKV

50-491/79-18

50-492/79-18

50-493/79-18

Duke Power Company

Attn:

W. O. Parker, Jr.

Vice President, Steam Production

Post Office Box 33189

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by P. K. Van Doorn of this office on

October 9-12, 1979 of activities authorized by NRC Construction Permit Nos.

CPPR-167, CPPR-168 and CPPR-169 for the Cherokee Nuclear Station facility, and

to the discussion of our findings held with J. W. Willis at the conc.'isiaa of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal

Regulations.

Section 2.201 requires you to submit to this office, within 20

days of your receipt of this notice, a written statement or explanation in reply

including:

(1) corrective steps which have been taken by you, and the results

achieved- (2) corrective steps which will be taken to avoid further noncompliance;

and (3) ct.e date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

2167 095

7912230

/[1

.

.

.

Duhe Power Company

-2-

OCT 311979

.

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the baris of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is con.ained in a

separate part of the document.

If we do not hear from you in thii regard within

the specified period, the report will be placed in the Public Doc 1 ment Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

S

-

C. E. Murphy (Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-491/79-18,

50-492/79-18 and 50-493/79-18

cc w/ enclosures:

J. T. Moore, Project Manager

Post Office Box 422

Gaffney, South Carolina 29340

2167 096

.