ML19269F489
| ML19269F489 | |
| Person / Time | |
|---|---|
| Site: | Cherokee |
| Issue date: | 10/31/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19269F481 | List: |
| References | |
| NUDOCS 7912210152 | |
| Download: ML19269F489 (2) | |
See also: IR 05000491/1979018
Text
.
.
e
e arou
o
UNITED STATES
!
T
NUCLEAR REGULATORY COMMISSION
q
g
-
.c
REGION 11
'
I
o,
101 MARIETTA ST., N.W., SUITE 3100
%./ -v p*'
ATLANTA, GEORGIA 30303
.....
OCT 3 I 1979
In Reply Refer To:
RII:PKV
50-491/79-18
50-492/79-18
50-493/79-18
Duke Power Company
Attn:
W. O. Parker, Jr.
Vice President, Steam Production
Post Office Box 33189
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by P. K. Van Doorn of this office on
October 9-12, 1979 of activities authorized by NRC Construction Permit Nos.
CPPR-167, CPPR-168 and CPPR-169 for the Cherokee Nuclear Station facility, and
to the discussion of our findings held with J. W. Willis at the conc.'isiaa of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to submit to this office, within 20
days of your receipt of this notice, a written statement or explanation in reply
including:
(1) corrective steps which have been taken by you, and the results
achieved- (2) corrective steps which will be taken to avoid further noncompliance;
and (3) ct.e date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
2167 095
7912230
/[1
.
.
.
Duhe Power Company
-2-
OCT 311979
.
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the baris of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is con.ained in a
separate part of the document.
If we do not hear from you in thii regard within
the specified period, the report will be placed in the Public Doc 1 ment Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
S
-
C. E. Murphy (Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-491/79-18,
50-492/79-18 and 50-493/79-18
cc w/ enclosures:
J. T. Moore, Project Manager
Post Office Box 422
Gaffney, South Carolina 29340
2167 096
.