ML19269D496

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-313/79-04 & 50-368/79-04 on 790205-09 & Notice of Violation
ML19269D496
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/28/1979
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
Shared Package
ML19269D489 List:
References
NUDOCS 7906040156
Download: ML19269D496 (2)


See also: IR 05000313/1979004

Text

ks arGug

UNITED STATES

,

/

e

NUCLEAR REGULATORY COMMISSION

,

5.$)7{/o

[4-

REGION IV

N

.$

611 RYAN PLAZA DRIVE, SUITE 1000

  • o?f?

/*

AR LINGTON, TEXAS 76011

N *N %/

February 28, 1979

.

Docket Hos. 50-313

50-368

Arkansas Power and Light Company

ATTN: Mr. William Cavanaugh

Vice President of Generation

and Construction

Post Office Box 551

Little Rock, Arkansas

72203

Gentlemen:

This refers to the inspection conducted by Blaine Murray of this office

during February 5-9, 1979, of activities authorized by NRC Operating

Licenses DPR-51 and NPF-6, and to the discussion of the inspection findings

held by Mr. Murray with J. P. O'Hanlon and other members of your staff at

the conclusion of the inspection on February 9, 1979.

Areas examined during the inspection and our finding are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective examination of procedures and representative records, inter-

views with personnel, and observations by the inspectors.

Based on the results of the inspection, it appears that one of your activ-

ities authorized by NRC Operating License NFP-6 was not conducted in full

compliance with NRC requirements. The item and references to the pertinent

requirements are listed in Enclosure 1 to this letter.

This letter constitutes a notice sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Section 2.201 requires you to submit to this office

within twenty (20) days of your receipt of this notice, a written state-

ment or explanation in reply including:

(1) corrective steps which have

been or will be taken by you, and the results achieved; (2) corrective

steps which will be taken to avoid further violations; and (3) the date

when full compliance will be achieved.

In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you believe to be

proprietary, it is necessary that you make a written application within

20 days to this office to withhold such information form public disclosure.

2259

117

7906040[f6

G

.

,

.

.

.

Arkansas Power and Light Company

-2-

February 28, 1979

Any such application must include a full statement of the reasons it is

claimed that the information is proprietary.

It should be prepared so

that proprietary information identified is contained in a separate part

of the document, since the application, excluding this separata part, will

Elso be placed in the Public Document Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

,b

a

G. L. Madsen, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Notice of Violation

2.

IE Inspection Report Nos. 50-313/79-04

50-368/79-04

,

2259

118