Forwards IE Insp Rept 50-302/79-08 on 790212-16 & Notice of Violation
ML19263E467
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/23/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19263E463 List:
References
NUDOCS 7906180372
Download: ML19263E467 (2)


See also: IR 05000302/1979008

Text

-t

.

.

UNITED STATES

  1. g #R800

NUCLEAR REGULATORY COMMISSION

o,,

4

[

REGloN il

o

5

g

101 M ARIETT A STRE ET, N.W.

8

ATLANTA. GEORGI A 30303

o,s...../

MAR 2 31979

In Reply Refer To:

RII:DRQ

50-302/79-08

Florida Power Corporation

ATTN:

W. P. Stewart, Director

Power Production

P. O. Box 14042, Mail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

This refers to the inspection conducted by D. R. Quick of this office on

February 12-16, 1979, of activities authorized by NRC Operating Licence

DPR-72 for the Crystal River 3 facility, and to the discussion of our

findings held with G. P. Beatty, Jr. at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

witn personnel, and observations by the inspectors.

We have examined actions you have taken with regard to previousl, identified

enforcement matters and unresolved items. The status of these items is

discussed in the enclosed report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

During the inspection it was found that certain activities under your license

appear to deviate from commitments to the Commission and have safety signifi-

cance. This item is identified in the Notice of Deviation enclosed herewith

as Appendix A.

Please provide us in wr' ting within 20 days of your receipt

of this letter your comments including u description of corrective actions

that have been or will be taken, corrective actions which will be taken to

avoid further deviations, and the date corrective actions were or will be

completed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

79061807/{

2355 028

.

-

~

. . . . .

.

.

e

MAR 2 31979

Florida Power Corporation

-2-

proprietary, it is necessary that you make a written application within 20Any

days to this office to withhold such information from public disclosure.

such application must include a full statement of the reasons on the basis of

which it is claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is contained in

If we do not hear from you in this regard

a separate part of the document.

within the specified period, the report will be placed in the Public Document

Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

}l C &c-

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Deviation

2.

Inspection Report No. 50-302/79-08

cc w/ enc 1:

G. P. Beatty, Jr.

Plant Superintendent

2355 029

P. O. Box 1228

Crystal River, FL 32629