Florida 3-0-3-a-2 P.oo...er w
CS_79-106 co
.c.
Docket No. 50-302 Mr. J. P. O'Reilly, Director License No. DPR-72 Office of Inspection & Enforcement Ref:
RII: DRQ U.S. Nuclear Regulatory Commission 50-302/79-08 101 Marietta St., Suite 3100 Atlanta, GA 30303
Dear Mr. O'Reilly:
We offer the following response to the apparent Item of Deviation in the referenced Inspection Report.
NOTICE OF DEVIATION In your letters dated May 9, 1978 and May 31, 1978, FFC made a commitment to modify three fire doors in order to comply with ANSI N I.5.2.9 requirements This modification relating to permanent and temporary record storage vaults.
consisted of installation of fire doors with a Class "A" three hour rating.
This was to be accomplished by September 30, 1978.
Contrary to the above, on February 15, 1979, the inspector determined that one newly installed door on the temporary storage vr. ult still had a rating of one Additionally, the door in question was wedged fully open and one half hours.
The vault was unattended at the time.
rendering it ineffective as a fire barrier.
The newly installed door cited in the Notice of Devi.. tion was installed The door was issued by the Response _:
with the incorrect fire rating due to personnel error.
Stores warehouse personnel and accepted by the maintenance personnel to have had The fire rating of the door was not checked either on a three hour fire rating.
All concerned personnel have been counselled installation or modification checkout.
A docr with a three hour rating has been as to the consequences of this deviation.
ordered with an expected delivery and installation date of 1 June 1979.
The door in question was observed wedged open by the Inspector as a result of The concerned personnel failure to close upon cocpiction of cleaning of the vault.
have been re-instructed to ensure the door be closed when not attended.
Should.there be further questions, please contact us.