ML19263E025
| ML19263E025 | |
| Person / Time | |
|---|---|
| Site: | Cherokee |
| Issue date: | 03/05/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dail L DUKE POWER CO. |
| Shared Package | |
| ML19263E018 | List: |
| References | |
| NUDOCS 7904240408 | |
| Download: ML19263E025 (2) | |
See also: IR 05000491/1979003
Text
5
.
.
UNITED STATES
t " "'Oug
k
(p
o
NUCLEAR REGULATORY COMMISSION
g
REGloN ll
g
') g'
g
I
101 M ARIETTA STREET, N.W.
.
ATLANTA, GEORGI A 3o303
o,% ...../
MAR 0 51979
In Reply Refer To:
RII:JKR
50-491/79-03
50-492/79-03
50-493/79-03
Duke Power Company
Attn:
Mr. L. C. Dail, Vice President
Design Engineering
Post Office Eox 33189
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by Mr. J. K. Rausch of this
office on February 6-8, 1979 of activities authorized by NRC License
Nos. CPPR-167, CPPR-168 and CPPR-169 for the Cherokee Nuclear Station
facility, and to the discussion of our findings held with Mr. C. B.
Aycock at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
We have examined actions you have taken with regard to previously
identified inspection findings. These are discussed in the enclosed inspection
report.
One new unresolved item resulted from this inspection and is discussed
in the enclosed report.
This item will be examined during subsequent
inspections.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with h3C requirements.
This item
and references to pertinent requirements are listed in the Notice of
Violation enclosed herewith as Appendix A.
This notice is sent to you
pursuant to the previsions of Section 2.201 of the NRC's " Ruler, of
Practice", Part 2, iitle 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
hDb
7 90424 0 3d6
.
MAR 0 51379
.
Duke Power Company
-2-
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contrac-
tor) believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure. Any such application must include a full state-
ment of the reasons on the basis of which it is claimed that the informa-
tion is proprietary, and should be prepared so that proprietary informa-
tion identified in the application is contained in a separate part of
the document.
If we do not hear f rom you in this regard within the
specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
jf[ f/h
Charles E. Murphy, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-491/79-03,
50-492/79-03 and 50-493/79-03
cc w/ enclosures:
Mr. J. T. Moore, Project .ianager
Cherokee Nuclear Station
Post Office Box 422
Gaffney, South Carolina 29340