W
[g* "fGogjo
NUCLEAR REGULATORY COMMISSION
UNITFD STATES
,
g
'
o
REGloN 11
0
$
101 M ARIETTA STREET. N.W.
z
o
ATLANTA. GEORGI A 30303
FEB 0 81979
.. ..
In Reply Refer To:
RII:JJL
50-518/79-01
50-519/79-01
50-520/79-01
50-521/79-01
.'
Tennessee Valley Authority
Atta: Mr. H. G. Parris
Manager of Power
500A Chestnut Street, Tower II
Chattanooga, Tennessee
37401
Gentlemen:
This refers to the inspection conducted by Mr. J. J. Lenahan of this office
on January 2-5,
1979 of activities authorized by NRC License Nos. CPPR-150,
CPPR-151, CPPR-152 and CPPR-153 for the Hartsville Nuclear Plants A and B
facilities, and to the discussion of our findings held with Mr. W. T. Quinn
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
er. closed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items.
The status of these items is
discussed in the enclosed report.
Three new unresolved items resulted from this inspection and are discussed in
the enclosed report. These items will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
mppear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed here-
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of
Federal Regulations.
Section 2.201 requires you to submit to this office,
within 20 days of your receipt of this notice, a written statement or expla-
nation in reply including:
(1) corrective steps which have been taken by you,
and the results achieved; (2) corrective steps which will be taken to avoid
further noncompliance; and (3) the date when full compliance will be achieved.
79041301G4
.
FED 0 R 1979
.
Tennessee Valley Authority
-2-
During the inspection it was found that certain activities under your license
appear to deviate from commitments to the Commission, and have safety signifi-
cance. This item is identified in the Notice of Deviation enclosed herewith
as Appendix B.
Please provide us in writing within 20 days of your receipt
of this letter your comments including a description of corrective actions
that have been or will be taken, corrective actions which will be taken to
avoid further deviations, and the date corrective actions were or will be
completed.
In accordance wi' h Section 2.790 of the NRC's " Rules of Practice ," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains ar.y information that you (or your contractor) believe to be
proprietary, it is necessary that you make
written applicatiou within 20
a
days to this office to withhold such information from public disclosure. Any
such application must include a full statement of the reasons on the basis of
which it is claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is contained in
a separate part of the document. If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
'
y/
/
.<a
- L
/y
Charles E. Murphy, Cht'ef
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3.
Inspection Report Nos. 50-518/79-01,
50-519/79-01, 50-520/79-01 and
50-521/79-01
cc w/ enclosures:
(See Page 3)
.
FEB 0 81973
4
Tennessee Valley Authority
-3-
cc w/ enclosures:
Mr. J. E. Gilleland
Assistant Manager of Power
830 Power Building
Chattanooga, Tennessee 37401
Mr. R. T. Hathcote, Project Manager
Hartsville Nuclear Plant
Post Office Box 2000
Hartsville, Tennessee 37074
Mr. J. F. Cox
400 Commerce Street
W9D214
Knoxville, Tennessee 37902