i

/

So

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

3

o

$

"

'4

101 MARIETTA sT., N.W., SUITE 3100

,E

REGION 11

'

0,

%

ATLANTA, GEORGIA 3o3o3

In Reply Refer To:

SEP 2 81979

RII:TDG

50-370/79-18

.

.

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 33189

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by T. D. Gibbons of this office on

September 4-7,

1979, of activities authorized by NRC Construction Permit No.

CPPR-84 for the McGuire Nuclear Station facility, and to the discussion of our

findings held with R. L. Dick at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

..

1531 10

7912110

.

.

.

.

.

A.

SEP 2 81979

Duke Power Company

-2-

g,

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

..

.<

C. E. Murphy, Chie

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Noti- cf Violation

2.

Inspection Report No. 50-370/79-18

cc w/ enc 1:

M. D. McIntosh, Plant Manager

P. O. Box 488

Cornelius, NC 28031

J. C. Rogers, Project Manager

P. O. Box 33189

Charlotte, NC 28242

.

/

.

e

%

.