ML19261D901

From kanterella
Jump to navigation Jump to search
Houston Lighting & Power Second Set of Interrogatories & Request for Production of Documents,Submitted to Intervenor Tx Pirg.Certificate of Svc Encl
ML19261D901
Person / Time
Site: Allens Creek File:Houston Lighting and Power Company icon.png
Issue date: 05/18/1979
From: Copeland J, Newman J, Thrash C
BAKER & BOTTS, LOWENSTEIN, NEWMAN, REIS, AXELRAD & TOLL
To:
References
NUDOCS 7906280245
Download: ML19261D901 (16)


Text

. .

o

, %su /.,

7'{5+-

47 WC PIIBLIC DOGGIENT ROOM 3 .s.>$ Q--

- ,~*?

.e 2./

UNITED STATES OF AMERICA -

NUCLEAR REGULATORY COMMISSION Y

  • ,-.- *y.

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD' --

In the Matter of S S

HOUSTON LIGHTING & POWER COMPANY S Docket No. 50-466 S

(Allens Creek Nuclear Generating S Station, Unit 1) S HOUSTON LIGHTING & POWER COMPANY'S SECOND SET OF INTERROGATORIES TO TEXPIRG Pursuant to Section 2.740b and 2.741 of the Commission's Rules of Practice, Houston Lighting E Power Company (Applicant) propounds this Second Set of Inter-rogatories and Request for Production of Documents to the Texas Public Interest Research Group (TexPirg). Houston Lighting & Power Company incorporates herewith the instruc-tions and definitions set forth in its First Set of Inter-rogatories and Request for Production of Documents to TexPirg.

INTERROGATORY NO. 1. In response to Interrogatory A4(a) of Applicant's First Interrogatories to TexPirg, TexPirg answered:

"It would be obviously superior from both an environmental and safety impact." Specify each environmental and safety impact which you considered in answering this question, and specify exactly how much c.dditional water wou.1d be censumed in the STP cooling lake oy a third 1200 megawatt nuclear unit at the STP site.

} } { '} j}k 7906280 N

INTERROGATORY NO. 2. Specify the page numbers in the ACNGS Environmental Report or the South Texas Project Environmental Report which show that the Applicant will be able to contract for and receive sufficient water flows from the Colorado River to operate a third unit at STP.

INTERROGATORY NO. 3. (a) With respect to TexPirg's answer to Interrogatory A5(b) of Applicant's First Interrogatories to TexPirg, specify the number of acres of both prime and unique farm land located at the ACNGS site and provide the source of your answer. (b) Also specify the total number of comparable prime and unique farm land within the State of Texas.

INTERROGATORY NO. 4. With respect to TexPirg's answer to Interrogatory A6(a) of Applicant's First Interrogatories to TexPirg, specify where in the FES Supplement it states that significantly less water will be used by a 1200 megawatt nuclear unit located at the STP site rather than the ACNGS site.

INTERROGATORY NO. 5. With respect to your answer to Inter-

<ngatory A7(b) of Applicant's First Interrogatories to TexPirg, state whether you possess any documents or have conducted any studies which show that persons, corpore. ions or other entities in the Houston area will be required te 22Lf; 335

convert to surface water and will use the Brazos River as the source of their surface water.

INTERROGATORY NO. 6. (a) With respect to TexPirg's answer to Interrogatory A8(b) of Applicant's First In*.arrogatories to Texpirg, specify what crops are grown on the prime and unique farm land that you contend will be lost and specify which of these crops would have to be imported from California if this farm land is preempted by construction of ACNGS.

(b) With respect to the prime and unique farm lands referred to in answer to this Interrogatory, specify the total number of acres of comparable land in the United States. (c) Also, specify whether the "Califernia farms that are being destroyed by salt deposits" have the same soil classifications as the soils found at the ACNGS site.

INTERROGATORY NO. 7. With respect to TexPirg's answer to Interrogatory A9 (b) of Applicant's First Intarrogatories to TexPirg, state how you determined that ACNGS Unit 1 "could emit more radiation than 1000 atomic bombs."

INTERROGATORY NO. 8. (a) With reference to TexPirg's answer to Interrogatory B7(d) of Applicant's First Intarrogatories to TexPirg, specify the levels of heavy metals "in the Allens Creek discharge, Wallis, Sealy, and plant discharges",

specifying exactly which heavy metals are in such discharges 20:) 336

and their concentration levels. (b) State whether TexPirg has retained Ms. Hinderstein, Mr. Saxion, Mrs. D. D. Hopkins or any other expert to testify on this subject.

INTERROGATORY NO. 9. In response to Interrogatory B8 (a) of Applicant's First Interrogatories to TexPirg, TexPirg stated that the temperature change required for thermal shock

" varies depending on the type of fish, rate of change and prior temperatures as well as o'ther parameters." Specify the source of that answer.

INTERROGATORY NO. 10. With respect to the TexPirg answer to Interrogatory B8(b) of Applicant's First Set of Interrogatories to TexPirg, provide the basis for the statement that the plant will close in the winter months each year.

INTERROGATORY NO. 11. (a) Describe the large scale refuse combustion facility being planned by the Gulf Coast Waste Disposal Authority described in TexPirg's answer to Inter-rogatory D1 of Applicant's First Set of Interrogatories to TexPirg providing the following information: (1) the feed stock (fuel) for the facility; (2) the source of the feed stock; (3) the amount of the feed stock; (4) the amount of feed stock to be stored on site; (5) the amount of feed stock consumed per day; (6) the facility's total steam yield; (7) the capacity of the project for production of electricity; (S) the cost per kilowatt hour of electricity that would be generated frcm the plant; (9) the suppleaental

_4_ 22C ;37

fuel source, if any, for operating the plant and the cost of producing power from the plant when operating with the alternative fuel source; (10) the amount of power required for processing the feed stock prior to its use as fuel for steam generation. (b) Provide the information requested in a (1) - (10 ) above, for the Browning Ferris project, which is clso referenced in answer to Interrogatory Dl.

INTERROGATORY NO. 12. Specify who prepared each of TexPirg's answers in response to Interrogatories D1 through D9 of Applicant's First Interrogatories to TexPirg.

INTERROGATORY NO. 13. (a) Provide the name of the person who made the following statement in answer to Interrogatory No.

D1 of Applicant's First Interrogatories to TexPirg: "It is my understanding from Mr. Davies that Houston Power & Light was well aware of the proposed facility and in fact HL&P made it clear to Mr. Davies that electrical power generated from even a modest refuse combustion facility would not be allowed into the electrical system under HL&P's control."

(b) Provide the names of any person who, to TexPirg's knowledge, can testify in support of TexPirg's assertion that HL&P has demonstrated a " lack of cooperatior at even the study phase of a refuse ccmbustion systen for the Houston area."

INTERROGATORY NO. 14. At page S.9-5 of the Final Supplement to the Final Environmental Statement the Staff concludes 22D .338

that "the capital cost of a refuse-burning-only steam-electric plant is very high, the base load operating and maintenance costs are high, and the cost of the refuse fuel is relatively low." Specify every fact upon which TexPirg will rely in showing that this statement is in error.

INTERROGATORY NO. 15. (a) State whether Dr. Jack Matson has now been retained as an expert witness. (b) In answer to Interrogatory No. D6 of Applicant's First Interrogatories to TexPirg, TexPirg stated that it was in the process of preparing an estimate as to the cost of electricity generated by a solid waste facility which would be located in Houston.

State who is preparing this estimate, whether the estimate has been completed, and who is going to testify on this subject. (c) In addition, state whether the foregoing cost analysis will include an assumption as to the availability and capacity factors for a refuse combustion plant, and if so, provide the source of those assumed factors.

INTERROGATORY NO. 16. With respect to TexPirg's answer to Interrogatory No. D7 of Applicant's First Interrogatories to TexPirg, answer the following: (a) On what basis do you calculate that 80% of the refuse collected at two Houston landfills are combustible? (b) How is this refuse "pretreated"?

(c) On ** hat basis do you assert that the ccmbustible refuse collected frem two Ecuston landfills will yield 10,000 Stu 22E 339

per pound? (d) On what basis do you calculate that a refuse combustion electrical power plant will be 40% efficient? (e)

What is the highest efficiency rating among the electric generation plants listed in the reports by the EPA and the National Center for Resource Recovery? Identify the source of your answer.

(f) Identify all solid waste electric power generation plants in the operational, design, or planning stage with a capacity equal to or greater than 4,000 tons per day.

INTERROGATORY NO. 17. (a) In answer to Interrogatory No. E4(a),

TexPirg answered "FAA". State the name of the person at the FAA who told TexPirg that large plane traffic has increased at least thirty percent in the last three years. (b) With respect to the answer of E4(b), state the basis for the assumption that airplane traffic will continue to increase thirty percent every three years for the next 40 years.

(c) With respect to the answer to Interrogatory No. E4 (e) ,

provide the name of the person on the NRC Staff who provided this information and provide the name of the book alleged to be in the University of Houston Library.

INTERROGATORY NO. 18. At the prehearing conference in this proceeding held on November 17 and 18, 1978, counsel for TexPirg stated that plans were "well underway" to build another airport west of Houston. (Tr. 418-419,. Identify 22; s40

the exact location of this new airport and provide the name of the owner of the airport, the type of airport proposed, the amount of air traffic predicted for the airport, and the current status of the airport.

INTERROGATORY NO. 19. (a) With respect to TexPirg's answer to Interrogatory No. F7 of Applicant's First Interrogatories to TexPirg, TexPirg states that "if half of the cost of ACNGS were spent on conservation then the use of solid waste would eliminate the need for any nuclear plant." Explain exactly how much load could be reduced on HL&P's system by expenditure of half the cost of the ACNGS for conservation measures, and provide the source of your answer. (b) Specify the revisions in the annual and peak hour demand shown in FS-FES Table S.8-8 for the years 1985, 1986 and 1987 which would result from incorporation of TexPirg's conservation measures.

INTERROGATORY NO. 20. (a) With respect to the answers to Inter-rogatories Nos. F7 and F8 of Applicant's First Interroga-tories to TexPirg, state how TexPirg determined that Dow Chemical, Amoco, Shell, Exxon, Browning Ferris and Monsanto are planning self-generation of their electricity require-ments. If this information was obtained directly from the foregoing companies, provide the name of the person at each ccmpany who communicated such information to TexPirg. (b)

With respect to Tex?irg's answer to Interrogatory No. F9, 2m,(

_a_

state whether TexPirg has any documents or studies showing that HL&P's industrial customers can generate electricity more cheaply and more reliably than HL&P. If TexPirg has no such information state the basis for the answer provided in response to Interrogatory No. F9.

INTERROGATORY NO. 21. State whether Dr. Wells has been re-tained at this time to testify on behalf of TexPirg.

INTERROGATORY NO. 22. State whether any further work is being done to provide answers to Interrogatory Nos. F13 and F14 of Applicant's First Interrogatories to TexPirg, and if so, by whom.

INTERROGATORY NO. 23. Paragraph No. 78 of the Partial Initial Decision issued in this proceeding on November 11, 1975 states that "The records show that there will be suffi-cient crop land available to meet projected agricultural needs through the year 2020. Various studies project differing land requirements necessary for agricultural production during the life of the ACNGS but the authorities agree ". hat avail-ability of land will not be a limiting factor on agricultural production in the United States in the foreseeable future...."

Provide copies of any documents upon which Tex?irg intends to rely in demonstrating that this conclusion is erroneous and/or based on studies which are so speculative as to be unreliable.

220y 342

INTERROGATORY NO. 24. (a) Referring to the discussions between counsel and Mr. Doherty set forth at pages 87 through 94 of John F. Doherty's Deposition dated March 26, 1979, state whether TexPirg now regards the limitations on chlorine discharge set forth in the EPA permit for the Allens Creek project as satisfying TexPirg's concern with respect to chlorine discharges into the lake, and if not, why not and who within TexPirg so concluded. (b) In addition, state whether TexPirg has concluded that the chlorine minimization study described in the EPA permit satisfies TexPirg's con-tention with respect to chlorine discharges into the lake and, if not, state the reasons why and who within TexPirg who so concluded.

INTERROGATORY NO. 25. State whether TexPirg believes that the chlorine minimization study referenced in Interrogatory No. 23 hereof should be done prior to plant operation, and if so, how the study could be done prior to plant operation.

INTERROGATORY NO. 26. Specify the amount of temperature change required to induce thermal shock for the different types of game fish normally found in lakes in Texas. Provide the source of your answer. -

INTERROGATORY NO. 27. Provide the lethal level of chlorine lor the type of game fish ncrmally found in lakes in Texas.

Provide the source of ycur answer.

22i;? a43

INTERROGATORY NO. 28. (a) State whether Applicant can generate enough electricity through solid waste combustion to replace the 1200 megawatt ACNGS. (b) If your answer is affirmative, state whether TexPirg's answer to Interrogarory No. D7 of Applicant's First Interrogatories to TexPirg is now in error, and if not, why not.

INTERRCGATORY NO. 29. Provide copies of any documents showing that the average Houston homeowner could, through the addition of conservation retrofits to his home, reduce his utility bills by an amount sufficient to justify pur-chasing of the conservation retrofits.

INTERROGATORY NO. 30. At page 138 of Mr. Doherty's deposi-tion he stated that there would be environmental effects from burning garbage for generation of electricity. Specify those environmental effects and provide the source of your answer.

INTERROGATORY NO. 31. (a) Specify every reason why TexPirg believes that Applicant cannot barge the reactor vessel up the San Bernard River without channelizing the river.

Provide all assumptions used in answering this question (i.e, weight, length, and width of the reactor vessel; length, width and depth of the barge; width and depth of the San Bernard River at the point where TexPirg alleges the river will have to be channelized; etc.). (b) Specify all

_11_

22E, s44

adverse environmental effects which TexPirg alleges will result from Applicant's plan to move the reactor pressure vessel to the site by barging to an unloading point on the San Bernard River and transporting the reactor vessel over-land to the site from that point. (c) State who answered this interrogatory. (d) Provide the name of TexPirg's expert witness on this contention.

INTERROGATORY NO. 32. (a) dith' respect to TexPirg Conten-tion 10, explain what, in your view, Applicant must do in order to demonstrate compliance with 10 CFR Part 50, Appen-dix A, Criterion 31, with regard to intergranular stress, corrosion and cracking. In so doing, explain why the current metal content provided in the ACNGS design will not witt.-

stand excessive oxygen levels, superposed loads, and residual stresses (b) Identify any documents relating to the NRC investigation of stress, corrosion, and cracking problems at other BWR unite ="d identify the specific portions of those documents which indicate that similar problems may occur at ACNGS. (c) State who answered this interrogatory. (d)

Provide the name of TaxPirg's expert witness on this contention.

INTERROGATORY NO. 33. (a) With respect to TexPirg Conten-tion 11, specify the basis for your assertion that Applicant has not adequately assessed the effects cf flow-induced vibration on jet pumps, spargers, fuel pi.ns, core instru-mentation, and fuel rods. In so doing, identify the five 22C? 345

e BWR units which experienced feed water sparger failures from 1975 to 1976 as a result of flow-induced vibration and state whether the feed water spargers on those plants are exactly the same as those planned for ACNGS. (b) State who answered this interrogatory. (c) Provide the name of TexPirg's expert witness on this contention.

INTERROGATORY NO. 34. (a) With respect to TexPirg Addi-tional Contention 6, provide.the calculation used in deter-mining that the water within the weir wall will not clear the first row of vents before t' differential pressure exceeds 28 psi. (b) Define "mannings roughness factor" and identify the source of this factor as included in your calculation of drywell differential pressure during a LOCA.

(c) What do you calculate to be the peak differential pres-sure reached during this accident? Provide the calculation that shows this value. (d) Show that portion of the calcu-lation demonstrating that a proper accounting for the mannings roughness factor delays the time to clear the first row cf vents by 0.5 ceconds. (e) Provide the calculation that shows that the sequence of events postulated in TexPirg Additional Contention 6 will lead to a containment vessel pressure in excess of 15 psig. (f) Provide the basis for the statement that a containment vessel pressure in excess of 15 psig will cause the containment vessel to crack. (g)

State who answered this interrogatory. (h) Provide the name of TexPirg's expert witness on this contention.

22 t: 346

INTERROGATORY NO. 35. (a) With respect to TexPirg Conten-tion 8, explain the basis for the statement that Applicant only has a manually operated SCRAM system as its redundant system. In so doing, specify the exact changes that need to be made in the Applicant's SCRAM system in order to provide a sufficiently redundant SCRAM system. (b) State who answered this interrogatory. (c) Provide the name of TexPirg's expert witness on this contention.

INTERROGATORY F.. 36. With respect to TexPirg Contention 12, 7.nswer the followinr: (a) On what basis do you assert that ACNGS electrical wiring is susceptible to fast flaming?

(b) What features of the cable configuration and fire pro-testion systems simulated in the U.L. test do you contend are similcr or identical to the ACNGS design? (c) What modifications to the Commission's fire protection criteria do you contend are necessary? (d) D'efine the term f a e '.

flaming." Provide in your definition all quantitative values for flame propagation. (e) State who answered this interro-gatory. (f) Provide the name of TexPirg's expert witness on this contention.

Respectfully submitted, OF COUNSEL: , A[f# -

44 Gregcry/Coceland' BAKER & BOTTS Charles G4 TIrash 3000 One Shell Plaza (2000 One Shell Plaza Houston, Texas 77002 Houston, Texas 77002 LOWENSTEIN, NEWMAN, REIS, Jack R. Newman AXELRAD & TOLL Robert H. Culp 1025 Connecticut Ave., N.W. 1025 Connecticut Ave., N.W.

Washington, D. C. 20036 Washington, D. C. 20036 Attorneys for Applicant Houston Lighting & Power Company 7

22'/ 347

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of S S

HOUSTON LIGHTING & POWER COMPANY S Docket No. 50-466 S

(Allens Creek Nuclear Generating S Station, Unit 1) S CERTIFICAT3 OF SERVICE I hereby ceruify that copies of the foragoing Houston Lighting & Power Company's Second Set of Inter-rogatories to TexPirg in the above-captioned proceeding were served on the following by deposit in the United States mail, postage prepaid, or by hand-delivery this 18th day of May, 1979. .

Sheldon J. Wolfe, Esq., Chairman Richard Lowerre, Esq.

Atomic Safety and Licensing Assistant Attorney General Board Panel for the State of Texas U.S. Nuclear Regulatory Commission P. O. Box 12548 Washington, D. C. 20555 Capitol Station Austin, Texas 78711 Dr. E. Leonard Cheatum Route 3, Box 350A Hon. Charles J. Dusek Watkinsville, Georgia 30677 Mayor, City of Wallis P. O. Box 312 Mr. Gustave A. Linenberger Wallis, Texas 77485 Atomic Safety and Licensing Board Panel Hon. Leroy H. Grebe U.S. Nuclear Regulatory Commission County Judge, Austin County Washington, D. C. 20555 P. O. Box 99 Bellville, Texas 77418 Chase R. Stephens Docketing and Service Section Atomic Safety and Licensing Office of the Secretary of the Appeal Board Cc= mission U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Washington, D. C. 20555 Nashington, D. C. 20535 R. Gordon Gcoch, Esq. Atomic Safety and Licensing Baker & Botts Board Panel 1701 Pennsylvania Avenue, N. W. U.S. Nuclear Regulat. cry Washington, D. C. 20006 Commission Washington, D. C. 20555 22C; ;48

Steve Schinki, Esq.

Staff Counsel U. S. Nuclear Regulatory Commission Washington, D. C. 20555 John F. Doherty 4438 1/2 Leeland Houston, Texas 77023 Madeline Bass Framson 4822 Waynesboro Drive Houston, Texas 77035 Robert S. Framson 4822 Waynesboro Drive Houston, Texas 77035 Carro Hinderstein 8739 Link Terrace Houston, Texas 77025 D. Marrack 420 Mulberry Lane Bellaire, Texas 7740.'

Brenda McCorkle 6140 Darnell Houston, Texas 7"/374 F. H. Potthoff, III 1814 Pine Village Houston, Texas 77080 Wayne E. Rentfro P. O. Box 1335 Rosenberg, Texas 77471 James M. Scott, Jr.

8302 Albacore Houston, Texas 77074 h bTr M M J Gregor' Co yland '

(/

22C?> ;49

._