Forwards IE Insp Rept 50-302/79-10 on 790313-16 & Notice of Violation
ML19261D845
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/10/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19261D842 List:
References
NUDOCS 7906260516
Download: ML19261D845 (2)


See also: IR 05000302/1979010

Text

.

,*

+

UNITED sVATEs

  1. gn at% [o,,

NUCLEAR REGULATORY COMMISSION

i

[

R EGloN 11

o

5

.$

101 M ARIETTA STREET,N.W.

ATLANTA. GEORGI A 30303

s*****/

In Reply Refer To:

APR 101979

RII:ALC

50-302/79-10

Florida Power Corporation

Attn:

W. P. Stewart, Director

Power Production

Post Office Box 14042, Mail Stop C-4

St. Petersburg, Florida 33733

Gentlemen:

This refers to the inspection conducted by A. L. Cunningham of this

office on March 13-16, 1979 of activities authorized by NRC License No.

DPR-72 for the Crystal River facility, Unit 3, and to the discussion of

our findings held with G. P. Beatty at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously

identified inspection findings.

These are discussed in the enclosed inspection

report.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This item

and references to pertinent requirements are listed in the Notice of

Violation enclosed herewith as Appendix A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice", Part 2, Title 10, Code of Federal Regulations.

Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure. Any such application must include a full statement

of the reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary inf

at n

79c6760516

0062605+c

.

.

..

ha n . u us t(

y pp =

nug

a

Florida Power Corporation

-2-

identified in the application is contained in a separate part of the

If we do not hear from you in this regard within the specified

document.

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

$d

i

ack T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-302/79-10

cc w/ enclosures:

G. P. Beatty, Jr.

Plant Superintendent

Post Office Box 1228j} l}g Crystal River, Florida 32629 . }}