Text
..
9 *p o,
- u. s ;en, ;c
.'o
- e cg z
M- ~ ~o,m g,. a g, %,.. a.
+n
, qc
.. +
y,ui e
_c
- .22
$;US
.T3 Florida Power em
- '"" "Afri l 2 3, 1979 Q-m w2=
< co %.
t C-Mr. J.
P. O'Reilly Director Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Suite 3100 101 Marietta Street Atlanta, CA 30303
Subject:
Docket No. 50-302 License No. DPR-72 Ref:
RII:ALC 50-302/79-10
Dear ?!r. O'Reilly:
We offer the following responses to the apparent Items of Noncompliance in the referenced Inspection Report.
NOTICE OF VIOLATION As required, in part, by Appendix B, Technical Specifications 3.1.4.a and 3 1 4.b, oxygen saturation will be measured at dusk and dawn of consecutive days, twice monthly in the outer bay, intake canal, and discharge canal at the point of discharge.
Contrary to the above, the licensee failed to measure oxygen saturation at the assigned f reque.cy during January and February, April and June 1978, in the case of the cater bay, and January and June 1978, in the case of the ca na l s.
Response
During 1977 and 1978, oxygen saturation was not tueasured as requi' ed by Appendix B, Technical Specifications 3.1.4.a and 3.1.4.b, f or the dates, at the stations, and for the reasons stated in Table 1.
Of the 564 uasurements that were scheduled tc be obtained, 11 measurements were missed because of equipment failures, 3 measurements were missed because of adverse weather conditions, and 37 measurements were missed because of personnel misunderstandings.j} l}} The contractor did not understand the seriousness of these measurements as a Technical Specification requirement until the FPC audit in June, 1978. Prior to this audit, the contractor felt that other similar measurements (major diurnals) would be adequate in place of the missed readings. Since that time no measurements have been missed because of personnel misunderstandings. 'W W 79062614042. 5k kiektb. Florida General Othce 3201 inin rounn street soutn. e o Bo= 9 33733 813 - 866-5151 c !"a n * ;
~ Mr. J. P. O'Reilly April 23, 1979 Page 2 Measurements missed because of adverse weather conditions are unavoidable. Measurements missed because of equipment failures are undesirable, but not totally unavoidable. Efforts are being made to reduce the possibility of future equipment failures and full compliance has been achieved. Should there be further questions, please contact us. Very truly yours, FLORIDA POWER CORPORATION 0.f.'o'-hasM W. P. Stewart Director, Nuclear Operations JC/rc / Nuclear Plant Manager }}}} }}} Attachment
w_ TABLE I Date Station Time Explanation April 6, 1977 Discharge Canal Dusk Thermometer broken; unaole to obtain temperature April 6, 1977 Intake Screens Dusk Thermometer broken; unable to obtain temperature May 18, 1977 Outer Bay Dawn Outboard motor malfuncticn; however, represents additior.al data May 31, 1977 Outer Bay Dusk Bad weather (squall) June 17, 1977 Outer Bay Dawn Outboard motor malfunction June 17, 1977 Outer Bay Dusk Outboard motor malfunction July 13, 1977 Outer Bay Dawn Diurnal sampling in bays underway; unaware that Outer Bay had to be sampled during diurnal runs July 13, 1977 Outer Bay Dusk Diurnal uampling in bays underway; unawa re that Guter Bay had to be sampled during diurnal runs July 14, 1977 Outer Bay Dawn Diurnal sampling in bays underway; unaware that Outer Bay had to be sampled during diurnal runs January 4, 1978 Outer Bay Dawn All personnel involved in writing 1977 annual report; no field work January 4, 1978 Outer Bay Dusk All personnel involved in writing 1977 annual report; no field work January 4, 1978 Discharge Canal Dawn All personnel involved in writing 1977 annual report; no field work January 4, 1978 Discharge Canal Dusk All personnel involved in writing 1977 annual report; no field work January 4, 1978 Intake Screens Dawn All personnel involved in writing 1977 annual report; no field work January 4, 1978 Intake Screens Dusk All personnel involved in writing 1977 annual report; no field work January 5, 1978 Outer Bay Dawn All personnel involved in writing 1977 annual report; no field work January 5, 1978 Outer Bay Dusk All personnel involved in writing 1977 annual report; no field work 2313 124 7hdpjQ@fg Bright (NRCINSPRpT)D60 w TABLE I (Continued) Date Station Time Explanation January 5, 1978 Discharge Canal Dawn All personnel involved in writing 1977 annual report; no field work January 5, 1978 Discharge Canal Dusk All personnel involved in writing 1977 annual report; no field work January 5, 1978 Intake Screens Dawn All personnel involved in writing 1977 annual report; no field work January 5, 1978 lutake Screens Dusk All personnel involved in writing 1977 annual report; no field work January 18, 1978 Outer Bay Dawn All personnel involved in writing 1977 annual report; no field work January 18, 1978 Outer Bay Dusk All personnel involved in writing 1977 annual report; no field work January 18, 1978 Discharge Canal Dawn All personnel involved in writing 1977 annual report; no field work January 18, 1978 Discharge Canal Dusk All personnel involved in writing 1977 annual report; no field work January 18, 1978 Intake Screens Dawn All personnel involved in writing 1977 annual report ; no field work January 18, 1978 Intake Screens Dusk All personnel involved in writing 1977 annual report ; no field work January 19, 1978 Outer Bay Dawn All personnel involved in writing 1977 annual report; no field work January 19, 1978 Outer Bay Dusk All personnel involved in writing 1977 annual report; no field work January 19, 1978 Discharge Canal Dawn All personnel involved in writing 1977 annual report; no field work January 19, 1978 Discharge Canal Dusk All personnel involved in writing 1977 annual report; no field work January 19, 1978 Intake Screens Dawn All personnel involved in writing 1977 annual report; no field work January 19, 1978 Intake Screens Dusk All personnel involved in writing 1977 annual report; no field work 2313 125 Bright (NRCINSPRPT)D60 . ~ ~ -. TABLE 1 (Continued) Date Station Time Explanation February 1, 1978 Outer Bay Dawn Diurnal sampling in bays underway; unaware that Outer Bay had to be sampled during diurnal runs Fe brua ry 1, 1978 Outer Bay Dusk Diurnal sampling in bays underway; unaware that Outer Bay had to be sampled during diurnal runs February 2, 1978 Outer Bay Dawn Diurnal sampling In blys underway; unaware that Outer Bay had to be sampled during diurnal runs February 2, 1978 Outer Bay Dusk Diurnal sampling in bays underway; unaware that Outer Bay had to be sampled during diurnal runs February 3, 1978 Outer Bay Daw i Diurnal sampling in bays underway; unaware that Outer Bay had to be sampled during diurnal runs April 7, 1978 Outer Bay Dusk Diurnal sampling in bays underway; unawa re that Outer Eay had to be sampled during diurnal runs April 8, 1978 Outer Bay Dawn Diurnal sampling in bays underway; unawa re that Outer Bay had to be sampled during diurnal runs April 8, 1978 Outer Bay Dusk Diurnal sampling in bays underway; unaware that Outer Bay had to be sampled during diurnal runs April 9, 1978 Outer Bay Dawn Diurnal sampling in bays underway; unawa re that Outer Bay had to be sampled during diurnal runs May 20, 1978 Intake Screens Dusk Boat stuck on oyster reef until dark due to low tide June 7, 1978 Outer Bay Dusk Outboard motor malfunction June 7, 1978 Intake Screens Dusk Equipment malfunction, Salinometer June 9, 1978 Outer Bay Dusk Equipment malfunction, Salinometer June 9, 1978 Intake Screens Dusk Equipment aalfunction, Salinometer June 24, 1978 Discharge Canal Dawn Data unavailable due to communication breakdown between personnel 2313 126 Bright (NRCINSPRPT)D60 TABLE I (Continued) Date Station Time Explanation Noverabe r 29, 1978 Intake Screens Dusk Outboard motor rxtlf unction Decembe r 9,1978 Outer Bay Dusk Bad weather; entire run redone at later date; data reported is additional December 9, 1978 Discharge Canal Dusk Bad weather; entire run redone at later date; data reported is additional 2313 127 Bright (NRCINSPRPT)D60 }}