Forwards IE Insp Repts 50-317/79-02 & 50-318/79-02 on 790116-19 & Notice of Violation
ML19261C800
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/05/1979
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19261C796 List:
References
NUDOCS 7904020208
Download: ML19261C800 (3)


See also: IR 05000317/1979002

Text

6.-

b"*%g*

0

UNITED STATES

c

f j )k ,'h

,, e

>.

NUCLEAR REGULATORY COMMisslON

REGION I

  • %,, , M1

't

631 PARK AVENUE

[

KING OF PRUS$1 A, PENNSVt.VANI A 19406

,

  • ...*

Docket Nos. 50-317

ff' 5

1973

50-318

Mtimore Gas and Electric Ccmpany

ATTN:

Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject:

Combined Inspection 50-317/79-02 and 50-318/79-02

This refers to the inspection conducted by Mr. J. Kottan of this office

on January 16-19, 1979, at Calvert Cliffs Nuclear Power Plant, Units 1

and 2, Lusby, Maryland, of activities authorized by NRC License Nos.

DPR-53 and DPR-69 and to the discussions of our findings held by Mr.

Kottan with Mr. L. Russell and other members of your staff at the con-

clusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

In addition, our Mobile Laboratory was also brought to your site and

used by the inspector to make certain independent measurements.

The

basic purpose of these independent measurements is to verify your

capability for analyzing radioactive effluents, and to achieve and

maintain comparable methods of analyses between your facility and the

NRC.

The complete data from these measurements will be reported in a

subsequent Inspection Report.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix

A.

This item of noncompliance has been categorized into the levels as

described in our correspondence to you dated December 31, 1974.

This

notice is sent to you pursuant to the provisions of Section 2.201 of the

NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

7 904 02 0 W

.

,

,

Baltimore Gas and Electric Company

2

Section 2.201 requires you to submit to this office, within twenty (20)

days of your receipt of this notice, a written statement or explanation

in reply including:

(1) corrective steps which have been taken by you

and the results achieved; (2) corrective steps which will be taken to

avoid further items of noncompliance; and (3) the date when full compliance

will be achieved.

The item shown in the Notice of Violation enclosed with this letter is a

recurrent item.

In your response please give this matter your particular

attention.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosures will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to

be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such information from public

disclosure. Any such application must be accompanied by an affidavit

executed by the owner of the information, which identifies the document

or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by

the Commission as listed in subparagraph (b)(4) of Section 2.790. The

information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

.

Ge rglH. Smith, Chief

e

F 1 Facility and Materials Safety

ranch

Enclosures:

'

!.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Combined Inspection Report

Numbers 50-317/79-02 and 50-318/79-02

.

.

.

.

Baltimore Gas and Electric Company

3

cc w/encls:

R. M. Douglass, Manager, Quality Assurance

L. B. Russell, Chief Engineer

W. Gibson, General Supervisor, Operations QA

R. C. L. Olson, Senior Engineer