ML19261C800
| ML19261C800 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 02/05/1979 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML19261C796 | List: |
| References | |
| NUDOCS 7904020208 | |
| Download: ML19261C800 (3) | |
See also: IR 05000317/1979002
Text
6.-
b"*%g*
0
UNITED STATES
c
f j )k ,'h
,, e
>.
NUCLEAR REGULATORY COMMisslON
REGION I
- %,, , M1
't
631 PARK AVENUE
[
KING OF PRUS$1 A, PENNSVt.VANI A 19406
,
- ...*
Docket Nos. 50-317
ff' 5
1973
50-318
Mtimore Gas and Electric Ccmpany
ATTN:
Mr. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject:
Combined Inspection 50-317/79-02 and 50-318/79-02
This refers to the inspection conducted by Mr. J. Kottan of this office
on January 16-19, 1979, at Calvert Cliffs Nuclear Power Plant, Units 1
and 2, Lusby, Maryland, of activities authorized by NRC License Nos.
DPR-53 and DPR-69 and to the discussions of our findings held by Mr.
Kottan with Mr. L. Russell and other members of your staff at the con-
clusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
In addition, our Mobile Laboratory was also brought to your site and
used by the inspector to make certain independent measurements.
The
basic purpose of these independent measurements is to verify your
capability for analyzing radioactive effluents, and to achieve and
maintain comparable methods of analyses between your facility and the
NRC.
The complete data from these measurements will be reported in a
subsequent Inspection Report.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix
A.
This item of noncompliance has been categorized into the levels as
described in our correspondence to you dated December 31, 1974.
This
notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
7 904 02 0 W
.
,
,
Baltimore Gas and Electric Company
2
Section 2.201 requires you to submit to this office, within twenty (20)
days of your receipt of this notice, a written statement or explanation
in reply including:
(1) corrective steps which have been taken by you
and the results achieved; (2) corrective steps which will be taken to
avoid further items of noncompliance; and (3) the date when full compliance
will be achieved.
The item shown in the Notice of Violation enclosed with this letter is a
recurrent item.
In your response please give this matter your particular
attention.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosures will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to
be proprietary, it is necessary that you make a written application
within 20 days to this office to withhold such information from public
disclosure. Any such application must be accompanied by an affidavit
executed by the owner of the information, which identifies the document
or part sought to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by
the Commission as listed in subparagraph (b)(4) of Section 2.790. The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
.
Ge rglH. Smith, Chief
e
F 1 Facility and Materials Safety
ranch
Enclosures:
'
!.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Combined Inspection Report
Numbers 50-317/79-02 and 50-318/79-02
.
.
.
.
Baltimore Gas and Electric Company
3
cc w/encls:
R. M. Douglass, Manager, Quality Assurance
L. B. Russell, Chief Engineer
W. Gibson, General Supervisor, Operations QA
R. C. L. Olson, Senior Engineer