ML19260D451

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-344/79-22 on 791106-08 & Notice of Violation
ML19260D451
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 12/17/1979
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Goodwin C
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML19260D447 List:
References
NUDOCS 8002110068
Download: ML19260D451 (2)


See also: IR 05000344/1979022

Text

{ S N k b l b'b &

a

,

y ~cm#o

.

.

UNITED STATES

-

.

5 .)f )"w ,i

!

NUCLEAR REGULATORY COMMISSION

.c

REGION V

o, 1

g

1990 N. CALIFORNIA BOULEVARD

.

[

SUITE 202, WALNUT CREEK PLAZA

s

e,,,e

WALNUT CREEK, CAllFORNIA 94596

DEC 171979

Docket No. 50-344

Portland General Electric Company

121 S. W. Salmon Street

Portland, Oregon 97204

t

Attention:

Mr. Charles Goodwin, Jr.

Assistant Vice President

Gentlemen:

Subject: NRC Inspection of Trojan Plant

This refers to the inspection conducted by Messrs. P.H. Johnson and A.J.

Horn of this office on November 6-8, 1979, of activities authorized by NRC

License No. NPF-1, and to the discussion of our findings held by the inspec-

tors with Mr. C. P. Yundt and other members of your staff at the conclusion

of the inspection.

Areas examined during this inspection are described in the enclosed inspec-

tion report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements, as

set forth in the Notice of Violation, enclosed herewith as Appendix A.

This

item of noncompliance nas been categorized into a level as described in

our correspondence to all NRC licensees dated December 31, 1974.

This notice is sent to you pursuant to the provisions of Section 2.201,

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions.

Section 2.201 requires you to submit to this office within twenty

(20) days of your receipt of this notice, a written statement or explanation

in reply including (1) corrective steps which have been taken by you and

the results achieved; (2) corrective steps which will be taken to avoid

further violations; and (3) the date when full compliance will be achieved.

1939

125

8 002110

,,

,

.

.

DEC 171979

Portland General Electric Company

-2_

'

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20

days of the date of this letter, requesting that such information be with-

held from public disclosure. The application must include a full statement

of the reasons why it is claimed that the information is proprietary. The

application should be prepared so that any proprietary information is con-

tained in an enclosure to the application, since the application githout the

enclosure will also be placed in the Public Document Room.

If we do not

hear from you in this regard within the specified period, the report will

be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely,

k

bb el--x^

K o J. L. Crews, ChiefReactor Operations and{fl

Support Branch

Enclosures:

A.

Notice of Violation

B.

IE Inspection Report

No. 50-344/79-22

cc w/o enclosure B:

C. P. Yundt, PGE

F. C. Gaidos, PGE

[939

126