Forwards IE Insp Rept 50-302/79-45 on 791022-26 & Notice of Violation
ML19260C884
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/05/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML19260C885 List:
References
NUDOCS 8002060344
Download: ML19260C884 (2)


See also: IR 05000302/1979045

Text

n c.

-

-

/

UNITED STATES

N 'dh

o

~g

8")

NUCLEAR REGULATORY COMMISSION

n

$

E

REGION 11

%

/[

H

101 MARIETTA ST., N.W., SUITE 3100

o,

AT*.ANTA, GEORGIA 3o303

DEC0 5 1979

In Reply Refer To:

RII:TJD

50-302/79-45

Florida Power Corporation

ATTN:

J. A. Hancock, Director

Nuclear Operations

P. O. Box 14042, Mail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

This refers to the inspection conducted by T. J. Donat of this office on

October 22-26, 1979, of activities authorized by NRC Operating License

No. DPR-72 for the Crystal River 3 facility, and to the discussion of our

iindings held with G. P. Beatty at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed

in the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items.

The status of these items is

discussed in the enclosed report.

During the inspection it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

Corrective actions to prevent recurrence were completed

prior to the conclusion of this inspection; therefore, a reply is not requested.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietarf, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

1933

054

800200n397

Q

.

.

DEC 0 5 1979

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/

/ 0 7/?$8 1. r w

<-

-

R. C. Lewis, Actin Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-302/79-45

,

cc w/ enc 1:

D. C. Poole

Nuclear Plant Manager

P. O. Box 1240

Crystal River, FL 32629