ML19260A236
| ML19260A236 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/26/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W FLORIDA POWER CORP. |
| Shared Package | |
| ML19260A233 | List: |
| References | |
| NUDOCS 7911080212 | |
| Download: ML19260A236 (3) | |
See also: IR 05000302/1979029
Text
o
UNITED STATES
NUCLEAR REGULATORY COMMISSION
7
{
E
REGION 11
o
101 MARIETTA sT
N.W., sulTE 310o
ATLANTA, GEORGIA 303o3
SEP z 61979
In Reply Refer To:
RII:CJ
50-302/79-29
Florida Power Corporation
Atta:
W. P. Stewart, Manager
Nuclear Operations
Post Office Box 14042, Mail Stop C-4
St. Petersburg, Florida 33733
Gentlemen:
This refers to the inspection conducted by M. J. Graham of this office on
July 24-27, 1979 and C. Julian of this office on July 30 through August 5, 1979
of activities authorized by NRC License No. DPR-72 for the Crystal RLver facility,
and to the discussion of our findings held with G. P. Beatty at the conclusion
of the inspection.
Areas examined during this inspection included observation of zero power and low
power physics testing following refueling and testing of the Emergency Feedwater
System. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and obser-
vations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements.
These items and references
to pertinent requirements are listed in the Notice of Violation enclosed here-
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of
Federal Regulations. Section 2.201 requires you to submit to this office,
within 20 days of your receipt of this notice, a written statement or explan-
ation in reply including:
(1) corrective steps which have been taken by you,
and the results achieved; (2) corrective steps which will be taken to avoid
further noncompliance; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
}29()
kk
7911080EIE
.
.
t
.
Florida Power Corporation
-2-
SEP 2 01979
<
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
.
8.L
R. C.
ewis, Acting Chief
Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-302/79-29
cc w/ enclosures:
G. P. Beatty, Jr.
Nuclear Plant Superintendent
Post Office Box 1240
Crystal River, Florida 32629
.
.