ML19259D321

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 79-24, Overpressurization of Containment of PWR Plant After Main Steam Line Break. No Action Required
ML19259D321
Person / Time
Site: Catawba, Perkins, Cherokee  Duke Energy icon.png
Issue date: 10/01/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
References
NUDOCS 7910170731
Download: ML19259D321 (2)


Text

-

/

'o,,

UNITED STATES 8

~

NUCLEAR REGULATORY COMMISSION 3

o 5

E REGION il

' l((a[

101 MARIETTA ST., N.W., SUITE 3100 o,

% *****p*

ATLANTA, GEORGIA 30303 OCT 1 1979 In Reply Refer To:

RII:JEQ 65N13.M14-50-488, 50-489 50-490, 50-491 50-492, 50-493.

Duke Power Company Attn:

L. C. Dail, Vice President Design Engineering P. O. Box 33189 Charlotte, North Carolina 28242 Gentlemen:

The enclosed Information Notice provides information with regard to an analysis that identifies an event that could result in overpressur'ization of containment at a pressurized water reactor.

Sincerely, James P. O'Reilly Director

Enclosures:

1.

Information Notice No. 79-24 2.

List of IE Informaticn Notices Issued in the Last Six Months 1160 236'

/3l 7910170

'N s

O

OCT 1 1979 Duke Power Company,

cc w/ encl:

D. G. Beam, Project Manager Post Office Box 223 Clover, South Carolina 29710 J. T. Moore, Project Manager Post Office Box 422 Gaffney, South Carolina 29340

/

r 1160 237

SSINS: 6870 Accession No: 7908220123 UNITED STATES g.9 {i h f h

f NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT L\\

WASHINGTON, L. C.

20555 October 1, 1979 IE Information Notice No. 79-24 OVERPRESSURIZATION OF CONTAlfRfENT OF A PWR PLANT AFTER A MAIN STEAM LINE BREAK Virginia Electric and Power Co. submitted a report dated September 7, 1979 that identified a deficiency in the original analysis of containment pressurization as a result of a steam line break for North Anna Power Station, Units 3 and 4.

Stone and Webster Engineering Corporation performed a reanalyses of containment pressure following a main steam line break and determined that, if the auxiliary feedwater system continued to supply feedwater at runout conditions to the steam generator that had experienced the steam line break, containment design pressure would be exceeded in approximately 10 minutes. The long term blowdown of the water supplied under runout conditions by the auxiliary feedwater system had not been considered in the earlier analysis. The corrective action is now under review by the owner, architect engineer, and NSSS supplier.

This Information Notice is provided as an early notification of a possibly significant matter that is still under review by the NRC staff.

It is expectec that recipients will review the information for possible applicability to thei:.

facilities. No specific action or response is requested at this time.

If NRC evaluations so indicate, further licensee actions may be requested or required.

No written response to this Information Notice is required.

If you have any questions regarding this matter please contact the Director of the appropriate NRC Regional Office.

1160 238

I IE Information Notice No. 79-24 Enclosure October 1, 1979 Page 1 of 2 LISTING OF IE INFORMATION NOTICES ISSUED IN '.AST SIX MONTHS Information Subject Date Issued To Notice No.

Issued 79-24 Overpressurization of 10/1/79 All power reactor Containment of a PWR facilities holding Plant After a Main Steam OLs and cps Line Break 79-23 Emergency Diesel Generator 9/26/79 All Holders of cps Lube Oil Coolers and OLs 79-22 Qualification of Control 9/17/79 All Holders of cps Systems 9/14/79 All Holders of OLs 79-21 Transportation ard Commer-9/11/79 All Licensees as Supple-cial Burial of Radioactive mental Information to Materials IE Bulletin Nos. 79-19

& 79-20 79-20 NRC Enforcement Policy 9/7/79 All Holders of Reactor (Rev. 1)

NLC Licensed Individuals OLs and cps and Production Licensees with Licensed Operators 79-20 NRC Enforcement Policy 8/14/79 All Holders of Reactor NRC Licensed Individuals OLs and cps and Production Licensees ith Licensed Operators 79-19 Pipe Cracks in Stagnant 7/18/79 All Holders of Re.ctor (Correction - Borated Water Systems at OLs and cps Enclosure)

PWR Plants 79-19 Pipe Cracks In Stagnant 7/17/79 All Holders of Reactor Borated Water Systems At OLs and cps PWR Plants 79-18 Skylab Reentry 7/6/79 All Holders of Reactor OLs 1160 239

IE Information Notice No. 79-24 Enclosure October 1, 1979 Page 2 of 2 LISTING OF INFORMATION NOTICES ISSUED IN LAST SIX MONTHS Information Subject Date Issued To Notice No.

Issued 79-17 Source Holder Assembly Damage 6/20/79 All Holders of Reactor Damage From Misfit Between OLs and cps Assembly and Reactor Upper Grid Plate 79-16 Nuclear Incident at Three 6/22/79 All Research Reactors Mile Island and Test Reactors with OLs 79-15 Deficient Procedures 6/7/79 All Holders of Reactor OLs and cps 79-14 NRC Position of Electrical 6/11/79 All Power Reactor Cable Support Systems Facilities with a CP 79-13 Indication of Low Water 5/29/79 All Holders of Reactor Level in the Oyster Creek OLs and CP..

Reactor 79-12 Attempted Damage to New 5/10/79 All Fuel Facilities Fuel Assemblies Research Reactors, aid Fower Reactors with an OL or CP 79-11 Lower Reactor Vessel Head 5/7/79 All holders of Reactor Insulation Support Problem OLs and cps s

1160 240

.