IE Insp Repts 50-329/78-15 & 50-330/78-15 on 781101-03. Noncompliance Noted:Inadequate Control of Welding
ML19259B523
Person / Time
Site: Midland
Issue date: 12/27/1978
From: Hayes D, Naidu K, Wescott H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19259B517 List:
References
50-329-78-15, 50-330-78-15, NUDOCS 7903010361
Download: ML19259B523 (17)


See also: IR 05000329/1978015

Text

.

1

U.S. NUCLEAR REGULATORY COMMISSION

-

OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

keport No. 50-329/78-15; 50-330/N-15

Docket No. 50-329; 50-330

License No. CPPR-81; CPPR-62

Licensee: Consumers Power Company

1945 West Parnall Road

Jackson, MI 49201

Facility Name: Midland Nuclear Power Plant, Units 1 and 2

Inspection At: Midland Site, Midland, MI

Inspection Condu c ed.:

November 1-3, 1976

J

< I '" D)j' -

lc

/

/2 j27'd_'

.

Inspectors:

H. M. Wescott

&W . ,i a s 3 s,1w

.

UM E

/, K.

R. Naidu

I

Rc B 6 G.F M<. w //

.

/Z N 27

G. F. Maxwell

/ d Sa w

c

,y

P. A.

Barrett

'f) s"/

c. 1 ~ >

  1. 2 A '7 !M~

Approved By: D M .~ HayeI, Ch f

Projects Section

Inspection Summary

Inspection on November 1-3, 1978 (Report No. 50-329/78-15; 50-330/78-15)

Areas Inspected.: Review of documentation for decay heat removal pumps

re-radiography and repair; review of technical specifications for cable

tray; observation of safety related structures work activities; review

of safety related structures quality records; observation of safety

related structures welding activity; review of safety related structures

welding records; review of documentation on recirculating air cooling

units; review of B&W welding monitoring program; review of B6W manage-

ment audit; review of specification for new and spent fuel racks and

7903039gqq

,

quality documents; review of electrical implementation documents; obser-

.

and

vation of electrical work; review of electrical activity records;

followup review of previously identified unresolved and noncompliance

items. The inspection involved a total of 92 inspector-hours onsite by

four NRC inspectors.

Of the fourteen areas inspected, two items of noncompliance

Results:

(Infraction - inadequate control of welding -

were identified in one area

Section II, paragraph 3 and Details under Licensee Action on Previous

Inspection Findings).

2

.

.

.

D_ETAI LS

Persons Contacted

Pr'

_ gal Licensee Employees

  • J. L. Corley, Section Head - Examination and Test Verification
  • D.

R. Keating, QA Group Supervisor

  • P. Kyner, QA Engineer
  • D.

B. Miller, Site Manager

R. Ostrowski, Welding NDE Specialist

  • B.

H. Peck, Construction Supervisor

Bechtel Associates Professional Corporation

  • W.

Barclay, Project Field QC Engineer

  • L.

R. Basinski, Resident Engineer

B.

Dahr, Project Engineer (Civil)

L. A. Dreisback, Project Field QA Engineer

  • R.

C. Hollar, QA Engineer

  • P.

A.

Martinez, Project Manager

  • J. F. Newgem, Project Superintendent
  • J.

E. Russell, Project Field QC Engineer

  • E. Smith, for L. A. Dreisback, Project Field QA Engineer

B&W Construction Company

  • V. N. Asgaokar, Project Engineer
  • R. W. Shope, QC Supervisor

NRC Resident Inspector

  • R.

J. Cook

  • Denotes those present at the exit meeting.

Licensee Action on Previous Inspection Findings

(0 pen) Unresolved Item (329/78-05-01; 330/78-05-02):

Inadequate docu-

mentation on "0" rings.

It was previously reported that inadequate

documentation was available for the "O" rings supplied by Parker, which

were being used between the weld neck flange and the penetration.

Review of correspondence between Bechtel and Bunker Ramos Corporation,

the supplier of the electrical penetrations, indicates that these "0"

rings have not met the initial environmental qualification requirements.

The "0" rings have been identified with " Hold Tags."

It was reported

-3-

,

,

that the specification requirements were relaxed and retests were in

'

progress. The revised specification requirements, the technical basis

for relaxation and the results of the tests will be examined during a

subsequent inspection.

(0 pen) Unresolved Item (329/78-05-03; 330/78-05-04): Safety status of

Spent Fuel Pool Facilities Installation.

Clarification from IE:HQ on

this matter has not been received.

(Open) Noncompliance (329/78-03-02; 330/78-03-02): Voltage requirencnt

not specified in the Welding Procedure Specification (WPS) Pl-A-Lh

structural.

Review of the implementation of the corrective action

described in the enclosures to the Licensce's letter HOWE 89-7S dated

June 7, 1978, and the response HOWE-223-78 dated October 31, 1978, indi-

cates that welding voltage has been incorporated in WPS PI-A-Lh structural.

However, information on the WPS's which were revised, was not available

during the current inspection, and therefore, these WPS's were not

reviewed.

(Closed) Noncompliance (329/76-03-01; 330/78-03-01):

Shop Welding Inspec-

tion Reports of Haven Busch did not document whether defective root passes,

which were repaired, were reinspected after repair.

This item uas

originally identified as an unresolved item in Inspection Report 50-329/

77-13 and 50-330/77-15, and it was later escalated to an item of noncom-

pliance in Report 50-329/78-03 and 50-330/78-03. During the current

inspection, the inspector reviewed the implementation of the corrective

action outlined in the enclosures to the licensee's letter HOWE-89-78

dated June 7, 1978.

Bechtel conducted an audit which identified several

other discrepancies in the Haven Busch records. The audit disclosed

that in some instances the reinspections on the weld repairs were entered

on the reverse side of the inspection records; this side was not

reproduced and included in the documentation supplied.

Other reinspec-

tions were not properly documented. These discrepancies were not detected

and identified by the Bechtel shop inspector during Vendor Surveillances.

In addition, the audit identified several embedments with nonconforminE

Nelson Stud attachments. These findings are documented in two separate

NCR's No. 1345 and No. 1346. NCR No. 1345 identifies those embedments

with defective Nelson Stud attachments which were not installed and

consequently available for repairs. NCR No. 1346 identifies those

embedments with suspected defective welds based on inadequate documen-

tation which were already embedded in concrete and not available for

reinspection and repair.

NCR Nc. 1345 indicates that the Nelson Studs failed the hammer test

prescribed in the AUS D1.1 Code.

Bechtel evaluated the test results

and determined that the Nelsen Studs were foreseen for axial tension,

not shear loads, and prescribed axial tension testing.

Correc tive

-4-

.

.

action recommended for nonconformity Nelson Stud weld attachments was

to repair them using Shielded Metal Arc Welding, to AWS D1.1, paragraph

4.29.3 requirements. Quality Control Inspection Reports (QCIRs) indicate

the welding procedure used and the welding inspections performed.

How-

ever,. tests were neither prescribed nor performed as required in paragraph

4.30.1 of the AWS Dl.1 code for Nelson studs repaired with SMAW.

Para-

graph 4.30.1 in part states "If a visual inspection reveals any stud shear

connector that does not show a full 360 degree weld fillet, any stud that

has been repaired by welding, or any stud.

less than normal, such

. .

stud shall be struck with a hammer and bent to an angle of 15 degrees

from it's original axis."

The inspector informed the licensee that cor-

rective action taken was considered inadequate, and an item of noncompli-

ance contrary to the requirements of Criterion XVI of 10 CFR 50, Appendix

B.

(392/78-15-01; 330/78-15-01)

NCR 1346 documents those embedments with discrepant documentation on

the welds which had been installed.

This NCR was closed on the

basis of visual inspection and acceptance of those items listed in

1345. The inspector has no further questions on this NCR.

(0 pen) Unresolved Item (329/78-06-01; 330/78-06-01): The use of G-

321-D forms relative to electrical class lE equipment. The use of

this form will be evaluated by RIII during subsecnent inspections to

be conducted in the Bechtel-Ann Arbor office.

(open) Unresolved Item (329/78-04-02; 330/78-04-02):

Class 1E Components

not uniquely identified to assure conpliance with 10 CFR 55.a(h) (IEEE- 279-1971), paragraphs 1.0 and 4.22.

Chapter 9 - 3.1.3 of the Midland FS AR

has been revised to include color coding of terminal equipment.

However,

these requirements have not yet been translated into implementing pro-

cedures.

This item remains open and will be reviewed during future

inspections.

(open) Unresolved Item (329/78-04-01; 330/78-04-01): Electrical raceva,

and grounding system not included on the Q-list.

IE is corresponding

with NRR about this concern; action pending results of correspondence.

(Closed) Unresolved Item (329/78-04-04; 330/78-04-04): Clearance tol-

erance between Class 1E cable tray, cable tray supports or conduit and

adjacent field run piping not translated into specifications, drawings,

procedures or instructions. Specification E420 has been revised to

include clearance tolerances between Class 1E cable tray, cable tray

supports and conduit which is installed near piping, H&V duct instru-

ment tubing and equipment.

-5-

,

(open) Unresolved Item (329/78-06-02; 330/78-06-02):

Clarification of

the proposed Bechtel disposition for Nonconformance Report NCR No. 1207

(concerning cable clearances within Class 1E electrical cabinets).

1ne

inspector observed that Consumers Power Company has received additional

information relative to the Bechtel disposition provided for NCR No.

1207. However, all of the information has not yet been provided to

clarify the disposition of those conditions identified in NCR No. 1207.

This item remains open and will be reviewed during future inspections.

(Closed) Unresolved Item (329/78-07-01; 330/78-07-01):

Control of

measuring and test equiptien t .

The electrical crimping tool, ID No.

BPC-2397, has been located. The tool was inspected and found to be

uniquely 3ntified per Bechtel procedure FPG-6.000, revision 2, para-

graph 5.4.' and is traceable to its supportive documentation.

Licensee Action on Decay Heat Removal Pumps, Re-Radiography (50.55:e)

R gort) Units 1 and 2

__

The inspector verified that the actions taken by Consumers Power Company

as delineated in their final report dated August 2, 1978 (HOWE-126-73),

are acceptaFle.

This matter is considered closed.

(Also see Section I,

Item 1).

-6-

.

Section I

Prepared by H. M. Wescott

Reviewed by D. W. Hayes. Chief

Projects Section

1.

Review of Licensee Action on becay Heat Removal Pumps, Re-Radiograpig

_

for Midland Units 1 and 2 (50.55(e) Report)

The inspector reviewed the four (4) documentation packages

a.

titled " Decay Heat Removal Pump (Casing Rework) 23-1216-03,

620-0012" and "23-1387-01, 620-0013," for pumps serial

numbered 69080, 69081, 690S2 and 69083.

The packages con-

tained Certificates of Conformance and Statemcnts of

Conformance, Radiograph and Liquid Penetrant Reports, Hydro

Test Reports, Cleanlinest Certificates.

The inspector

verified the pump serial numbers by visual examination of

each pump installed.

b.

The inspector reviewed the audits of B6W Ltd., as follows:

(1)

Consumers Power Company Audit of B6W Ltd. , Canada

dated Fby 30, 1978.

(2)

BiW Audit of B&W Ltd. Audit of AIR's 78-7. ITD/2TD/3TD

dated May 31, 1978.

(3)

B6W Audit NPGD OA Audit of B&W Ltd. dated June 6, 1976.

(4)

E6W Company QA Audit of B&W Ltd. dated July 21, 1978.

The above appeared to be complete.

This matter is considered'

to be closed.

2.

Review of Desig_n Specification for Cable Tray, Observation of

Cable Tray Units 1 and 2

The inspector reviewed the " Technical Specification for Cable Tray

for Seismic Class I Structures for the Consumers Power Company

Midland Plant Units 1 and 2" Specification 7220-E-55. Revision 1,

issued for use November 14, 1976 and made observations of cable

tray and fittings supplied by Burndy/ Husky.

-7-

,

.

the fittings

Observation of cable tray and fittings established that

filler material.

were joined by using a bronze

A previous question conccrning classification of cable tray as

to

safety related or non-safety related has been referred to the NRC

Headquarters staff.

No items of noncompliance or deviations were noted in the above

areas.

_g-

,

.

Section II

Prepared by K. R. Naidu

Reviewed by R. L. Spessard, Chief

Engineering Support

Section 1

1.

Observation of Safety Related Structures Work Activities Units

1 and 2

The inspector observed the activities in progress relative to

the instc11ation of the seismic Category I support structures

of the Main Steam Isolation Valve ct 704' 0" on the auxiliary

building and determined that the work procedures were being

met in the following areas:

a.

Receipt inspections were performed on the miscelleneous

steel structures.

b.

The steel components were being installed to design drawings.

c.

Specified material and components were being used,

d.

Citrasonic test procedure to examine the walds had not beer

developed.

e.

No final inspections had been completed.

2.

Review of Saf ety Related Structures cuality Records Units 1 and 2

The inspector reviewed the pertinent work and quality records

relative to the insta;1ation of the seismic Category 1 support

etructure for the Main Steam Isolation Valves for Units 1 and 2

and determined that the records meet established procedures in

the following areas:

a.

Material Receiving Reports (MRR) No. AE0-7241, 7308 and

7227 indicate that several components of the seismic

support structure furnished by Schreiber >bnuf acturing

Company Incorporated were received without any visible

shipping damage,

b.

The documentation on the components was incomplete; NCR

1553 identifies discrepancies in documentation on the beams

supplied relative to the requirements of specification

7220-C-233 Revision 13.

-9-

w

,

,

No items of noncempliance or deviations were identified in the

above areas.

Observation of Safety Related Structures Welding Activity Units

3.

1 and 2

The inspector observed welding activities in progress relative

structures to ascertain whether

to the Units I and 2 MSIV support

the requirements of applicable work procedures and inspection

and determined the following.

procedures were met

1 side

inspector observed three welds on the Unit

a.

The

preparation and alignment were complete;

where joint

the licensee personnel concurred with the inspector that

the fitup was more than 1/8" which is in excess of the

These welds are identified

specification requirements.

On the

in Section J of drawing C-835(Q) Revision 2.

2 side, two celds where joint preparation had been

Unit

completed were observed and, the fitup gap appeared to

be within permissible limits. These welds are identified

in Section B, Detail 1, on drawing C-836(Q) Revision 3.

Several welds had been completed on the Units 1 and 2

b.

structures, but they had not been subjected to final

The inspector observed that nine completed

inspection.

1 structure were oversize, and therefore

welds on the Unit

unacceptable. These welds are on the west side identified

Two 1" size

in Section J of drawing C-835(Q) Revision 2.

welds on Unit 2 east side had insufficient throat at

These welds are identified in Section

certain locations.

B of Detail 1 on drawing C-836(Q).

The 3;censee was unable to explain why these welds were

identified as nonconforming during welding surveil-

not

A licensee representative measured the welds

lances.

with weld gauges, and concurred with the inspector's

A Bechtel QC inspector stated that a discrep-

findings.

ancy report would be generated documenting the nonconforming

welds and the excessive fitup gaps discussed in a. above.

Weld Procedure Specification (WPS) PI-A-Lh Structural was

c.

being used.

5/32" diameter veldrod type E7018 was being used by the

d.

welders.

Welders qualified to WPS Pl-A-Lh Structural were performing

e.

the welding.

- 10 -

,

The inspector determined that welding processes were inadequately

centrolled which led to the placement of several welds - both

oversize and undersize - which were not in conformance with those

specified in drawing C-835 and C-836.

Furthermore, no weld gauges

were available at the place of work to measure and verify the

sizes of the welds placed. The inspector infctmed the licensee

that this condition was contrary to the requirements of Criterion

IX of the 10 CFR 50, Appendix B and paragraph 5.2 of the Consumers

Power Company Quality Assurance Program for Design and Construction,

Procedure 9-1.

(329/76-15-02; 330/78-15-02)

Except as noted, no items of noncompliance or deviations were

identified.

4.

Review cf Safety Related Structures Welding Records Units 1 and 2

The inspector reviewed the Quality Control Inspection Records

for the Units i and 2 MSIV Seismic Category 1 Structures and

determined that the records reflect work accomplishment met

the applicable requirement in the following areas:

a.

Prerequisites such as inspection criteria, open NCRs,

in-process inspection activities were met.

b.

Welder qualifications were reviewed and determined acceptabic.

c.

Inspection of final welds had not been performed.

d.

Inspection of full penetration welds included an additional

requirement to ultrasonically examine the welds.

An approved

Ultrasonic Test (PT) procedure was not avellable at the site.

No items of noncompliance or deviations were identified in the

above areas.

5.

Review of Doc _umentation on Recirculating Air Cooling Units

The inspector reviewed the documentation relative to the Recircu-

lating Air Cooling Units identified as 2VM-56 A, B, C and D to

ascertain whether the records indicate that the requirements of

the Technical Specification 7220-M-163 were met.

The inspector

determined the following:

a.

MRR-AE0 No. 5774 dated March 14, 1978, and AE0 No. 5922

dated April 4, 1978, identifies that the material was

received with no apparent shipping damage.

b.

The QCIR identifies illegible documentation and references

NCRs 1394 and 1404.

- 11 -

~

.

,

c.

Review of NCRs 1394 and 1404 indicates that the documents

received with the shipment had considerable data n.issing

and illegible documents.

No items of noncompliance or deviations were identified in the

above areas.

6.

Review of Babcock and Wilcox (B&W) Welding Monitoring Program

The inspector discussed the Welding Monitoring Program with the

B6W QC representative and was given to understand that each

welding machine is checked twice during each shift in the fol-

lowing manner.

The welding machine output is verified; the

welding current and voltage are measured with calibrated

instruments and compared with the parameters specified in the

WPS.

The inspector reviewed a typical " Weld Control Record" No. 000101

which documents the welder ID, the date, the measured values of

the voltage and current and the electrode diameter.

Unique

traceability identification of the measuring devices is furnished.

The inspector reviewed the calibration records of the " Tong

Tester" type ammeter Serial No. ET1-16 and 666R Triplett type

ohm / voltmeter Serial No. ET2-17 and determined them to be current.

The measured values of the voltage and current were within the

parameters specified in the Welding Instruction Sheet No. W1N-101-2.

No items of noncompliance or devictions w;re identified in the

above areas.

7.

Revi_ew of B&W Panagement Audit

The inspector reviewed the results of the annual management

audit performed on B6W site by the B&W corporate Quality

Assurance department, Copley, Ohio.

Three findings identified

during the audit were resolved.

The corrective actions taken

by the field were reviewed and accepted by the auditors.

No items of noncompliance or deviations were identified in

the above areas.

8.

Review of the Specification for New and Spent Fuel Racks

The inspector reviewed the Technical Specification for the

purchase of New and Spent Fuel Racks C-42(Q).

Additional

information is required relative to how the licensee proposes

to assure the integrity of the cavity weldment seal welds in

- 12 -

, *

,

.

the encapsulated spent fuel tubes.

The licensee stated that hc

will discuss this matter further with his corporate office.

This

is considered an unresolved matter.

(329/73-15-03; 330/78-15-03)

No items of noncompliance or deviations were identified in the

above areas.

- 13 -

e

,

,

.

Section III

Prepared by C.

F. Maxwell a.id

P. A.

Barrett

Reviewed by R.

L. Spessard, Chief

Engineering Support

Section 1

1.

Quality Documents - Units 1 and 2

The RIII inspector toured the site and selected a total of 27

Bechtel " Work Prints" from three different ateas where safety-

related activities were in process.

The drawings (Mechanical

and Electrical) were checked, and, with one exception, were

found to have all of the applicable DCN's, FCN's and FCR's

attached on the reverse side (a requirement of Bechtel proce-

dure FPD-3.000 Revision 1 paragraph 4.0).

The inspector

observed that corrective action was in process to have the

missing FCR's and FCN's attached to the drawing in question and

other drawings which CPCo QA personnel have identified as not

having their DCN's, FCR's and FCN's attached (reference CPCo

QA Audit Report 01-36-8).

No items of noncompliance were identified.

2.

Review of Electrical Implementation Documents

The RII' inspector reviewed the following procedure, drawing

and instructions:

FPE-4.000 Revision 1 -- Installation of Electrical Cable

Drawing No. E-47(Q)

Sepsration of Class IE Equipment

Revision 0

-- and Circuits.

FIE-1.300 Revision 0 -- Electrical Field Construction Personnel

and QC Coordination.

FIE-4.100 Revision 1 -- Receiviag, Storage, Identifiestion and

Issuing of Cable.

FIE-3.500 Revision 0 -- Color Coding of Power, Control and

Instrumentation Cables for Class IE

Service.

QCI E-4.0 Revision 2 -- Installation of Electric Cables.

- 14 -

a w

,

t

i

Except as noted below, the above docum2nts, when used in combi-

nation with euch other, prescribe the quantitative and qualitative

acceptance criteria necessary to accomplish the designated activities.

Procedure FPE-4.000 Revision 1, paragraph 6.2 states, that " cable

in vertical tray sections or risers shall be tied down at intervals

of no greater than ten feet."

Quality Control Instruction No.

E-4.0 Revision 2 paragraph 3.2 requires inspection of cable for

attachment to trays at required intervals with approved cable ties.

Drawing E-42(Q) sheet 7 indicates compliance with the National

Electric Code for cables installed in the vertical position.

None

of these documents specify the type of support (cable tie) to be

used to accomplish the implied tasks, which would have to meet the

general design criteria for the Midland site.

The licensee stated

that an evaluation would be made to determine the type of support

required.

There have been no Class IE cables installed in the

above conditions to date.

This matter is unresolved and will be

reviewed during a subsequent inspectio~n.

(329/78-15-04; 3:

76-15-04)

Procedure FPE-4.000 Revision 1 paragraph 5.0 states, that

if

cable has been exposed to temperatures of 0 degrees F or lower

just prior to use, the cable shall be stored in a heated room

for one shift prior to installation." Of the three cable

suppliers and three types of cable reviewed by the RIII inspector,

the basis (manufacturer's instruction) for the above temperature

and time parameters for only one supplier and type of cable was

available.

The licensee stated that the remaining manufacturer's

instructions would be obtained for the pertinent cable types.

'inis matter is unresolved.

(329/78-15-05; 330/78-15-05)

No items cf noncompliance were identified.

3.

Observation of Electrical k'ork

The RIII inspector observed two partially installed 5000

a.

,

volt power cables to service water pump motors, No. lAA0535A

and No. 2AA0503A.

Both cables were of the type and size >

specified.

The cable ends were covered with protective

heat shrink caps.

Conduit bushings were properly instal-

led at the switchgear entrances (from ends).

The cables

were conspicuously color coded.

The use of pulling compound

was evident.

The RIII inspector observed the in-process installation

of 5000 volt power cable No. OEA0002A into embed conduit

No. 2EA024.

The cable type and eize were as specified.

The cable was attached to the pulling line with an

- 15 -

,

,

,

appropriate grip. Approved pulling compound was being

adequately applied. Softeners and bushings were used

to prevent jacket damage. A dynamometer, of current

calibration, was being used to monitor the pulling tension.

b.

The RIII inspector observed the cable storage yard. The

cable reels were being maintained in accordance with Field

Instrrction, FIE-4.100 dated October 16, 1978.

The cable

reels were properly identified and placed on dunnage.

The

cable ends were sealed.

The cable reels were aligned to

preclude contact which might damage the cable.

c.

The inspector observed the installation of cable tray

1DTA03, a safety related cable tray located in Unit 1

Auxiliary building elevation 625'6".

The tray was

installed and inspected in accordance wich Bechtel drawing

E-616(Q) Revision 8 and Bechtel procedure PQC1 E-2.0

Revision 5.

The inspector noted that Bechtel procedure

FPE-3.000, paragraph 5.0 requires that cable tray framing

bolts and tray splice plate bolts be tightened in accord-

ance with manufacturer's recommendations.

The inspectors

observed that CPCo QA personnel have written a nonconformance

report (NCR No. M-01-4-8-092) concerning FPE-3.000 paragraph

5.0, as no manufacturer's recommendations were rer.dily

available for use.

No items of noncompliance were identified.

4

Record Review of Electrical k'ork Activities

The RIII inspector reviewed the Cable Installation

a.

Inspection Records for partially completed cables

No. 1AA0505A and No. 2AA0503A.

The records identified the

inspector, the type of observation, the results, the

acceptability, and noted deficiencies.

The records were

identifiable and retrievable.

The acceptance criteria

was appropriate for the activity inspected.

b.

The RIII inspector reviewed the routing of cable No.

lAA0505A as defined by drawings No. E-599(Q) Sheet 2

Revision 0, No. E-510(Q) Revision 9, No. E-531(Q)

Revision 14, No. E-547(Q) Revision 12 and No. E-532(Q)

Revision 12.

The drawings included sufficient interface

and details to define the routing.

The distribution

and control of the above drawings were at two locations

in accordance with the document control center mastet log.

- 16 -

'

.

p

Cable hv. lAA0505A was traceable to the inherent reel,

receipt inspection record, and the purchase order.

c.

The RIII inspector reviewed the Storage Information, F-2,

record for 600 volt control cable.

The record indicated

30 day surveillance for the past year.

No items of noncompliance were identified.

Unresolved Item.:

Unresolved items are matters about which more information is required in

order to ascertain whether they are acceptable items, items of noncompli-

ance, or deviations. Unresolved items disclosed during the inspection are

discussed in Section II, paragraph 8 and Section III, paragraph 2.

Exit Interview

The inspectors met with licensee representatives (denoted under Persons

Contacted) at the conclusion of the inspection on November 3, 1978.

The

inspectors summarized the purpose and findings of the inspection.

The

licensee acknowledged the findings reported herein.

- 17 -